Get complete information related to latest Incubation Frame Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Incubation Frame Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Incubation Frame Tenders.
Tender For supply of st030100641 return roller group with bracket,st030100642 spring disc small,st030100638 track bolt,st030100623 track nut,st030100632 plummer block assy - drive,st030100625 sprocket rim assembly,st030100643 sprocket bolt,st030100662 link pitch group master,st030100656 master pin set,st030100661 seal group for dwa,st030100660 seal group for ccsa,st030100633 plummer block assy - counter,st030100663 pinion,st030120022 ring hammers,st030120016 breaker plate with fasteners,st030120021 upper screen plate with fasteners,st030120020 lower screen plate with fasteners,st030120026 kick off plate with fasteners,st030120018 hopper liner set,st030120023 body liner set,st030120028 shaft seal - rotor body,st030120025 shaft seal - housing,st030120032 bearing housing wbyo brg,st030120027 deflector liner plate,st030120024 suspension bar with end plugs,st030120030 cage frame without liners,st030120031 locking assembly
Tender For corrigendum : manufacture of esp casing panels and hopper walls, inlet and outlet funnel assembly, hopper transition, hopper conical assembly, hopper lower, shock bar, pent house columns, bracings, etc, ovm mode, project site delivery - complete manufacture of esp casing panels & hopper walls, inlet & outlet funnel assembly, hopper transition (square/rectangular to circular transition), hopper conical assembly, hopper lower, shock bar, pent house columns, bracings, beam, monorail beam, collecting electrode suspension, emitting system frame, hopper ridges, bracings, ep galleries stairs as per bhel approved drawings with vendor's own raw material procured from bhel approved suppliers and supply of finished goods to various project sites
Tender For supply of "suspension strap on bogie frame as per icf drg. wtac3-0-3-317 alt-a/nil. specn: t-0-3-634 [ warranty period: 30 months after the date of delivery ]
Tender For calling rate quotation for preparing an estimate of purchasing and distribution of tricycle scooter physically challenged beneficiaries in dudc chickmagalur limits with having minimum following technical specification displacement standard white colour scooter 109 and above cc single cylinder 4 stroke air cooled engine kick and self start bs vi model fuel type petrol operated engine power 5 88kw at 8000 rpm max speed 83km per hour drum type brake front and back telescopic suspension tubeless tyres front 12inch dia rear 10 inch speedometer and odometer analog warranty time 3 years warranty distance during warranty period 36000kms number of free services 3 torque 9nm at 5500rpm gear box automatic along with insurance charges of life time road tax registration charges with hypothecation as this scooter has been provided by chikmagalur district to physically challenged persons at chikkamgaluru district and not to be transferred along with retro fitment including all these attachments 1 ms tube rectangular 20x30x2mm 6mtr length 2 tubeless tyre tvs or mrf or dunlop or ceat or jk or other equivalent brand tubeless tyres 2 75x10 size 2 nos 3 aluminium hub110x70xx 2 nos 4 shock obsorbers 40x78mm 4nos 5 bearing 6201zz 4 nos 6 ms rim 280x65mm 2 nos 7ms arms 200mmx200mm 40nos 8 ms spacer 22x28x45mm 4 nos 9 pvc refector 40x60mm 2 nos 10 indicator 2 nos 11 m 10 doom nut 12 nos 12 foot rest rubber 2 nos 13 ms frame 940x1500x40mm 14ground clearance frame 300mm 15 kerb weight 35kg 16 clutch clamp back side 20 nos the rates inclusive of lead lift transportation to delivery spot near chickmagalur kadur birur ajjampura n r pura koppa sringeri mudigere ulbs complete with all incidental charges complete as per direction of engineer in charge
Tender For corrigendum : supply of physiotherapy and massage items d d - shortwave diathermy , hydrocollator , ultrasound therapy , tens , ift , traction unit , muscle stimulator , plate form mounted parallel walking bar , exercise training staircase with ramp , postural training mirror , suspension apparatus with gears and couch , continuous passive movement , upper body active trainer , cuff weights , recumbent bike , standing frame
Tender For auction sale of rolling stock - lot no.ws/s-yd/10/04/26-27/bg/cond./8w/emu motor coach and trailer coach description- iron and steel scrap cutup parts of bg cond./8w/emu motor coaches and trailer coach with or without n.f attachment, without contents if any. 1) se 10633 emu-mc 2) se 10632 emu-mc 3) se 10635 emu-mc 4) se 10636/108636 emu-mc 5) se 10954/108954 emu- tc 6) se 10950/108950 emu-tc nb: [1] (a) 04 emu motor coaches are to be sold without : i) buffers. ii) screw coupling. iii) bearing bolt. iv) draw and buff gear. v) draw hook with collar. vi) semi permanent coupler end -a. vii)semi permanent coupler end -b. viii) draw and buffer gear. ix) centre pivit pin top bush. x) centre pivot pin bottom bush. xi) wearing piece. xii) compensating ring. xiii) wheel sets 16 nos. xiv) oil pump motor. xv) radiator motor. xvi) rectifier cooling motor. xvii) transformer. xviii) choke tank (sl, tl & dl). xix) traction motor complete with pinion. xx) suspension brass bearing. xxi) auxilary compressor. xxii) battery charger. (b) 08 nos.bogie frames(trolley) are to be sold with fittings without primary suspension against srl no.01 to 04 . nb:[2]: emu trailer coaches are to be sold without 08 nos wheel sets along with roller bearing against srl no 05 and 06 and 04 nos bogie frame with complete fittings against srl 05 and 06 and other excluded fitting list as per latest excluded fittings /coach 1271 dated 13.09.2018. nb: [3] special condition for rolling stock- a) all excluded materials including wheel sets and bogie's fittings are to be handed over by the purchaser at the nominated location for which they have to arrange labour /tools/ equipment for loading of the excluded items from cutting site and then transport to nominated location by their own arrangement/vehicle. they have to unload and stack the excluded materials by their own arrangement including labours and hand over the same to: -(i) sse 27-28 trolley, coil spring, screw coupling, buffer sets etc. (ii) sse-19 wheel sets (iii) sse-30 ep unit (iv) sse-53 & 56 other emu items to be hand over to concern stock holder with clear acknowledgement. the delivery of cut pieces of last 10 parcent of lot size (subject to minimum of 01 no. rolling stock) will commence only when all excluded fittings arisen out of sold lot has been successfully handed over to custodian. b). delivery witnessing official will ensure that such nil value items has been cleared by purchaser before taking cut pieces of last 10 parcent of lot size (subject to minimum of 01 no. rolling stock) delivery witnessing official will record following certificate on sale delivery register "purchaser has cleared all nil value items arisen after cutting of sold rolling stock and there is no left over available at cutting site (c) the rolling stock may either be on the cutting line or grounded and may or may not have trolleys/wheel set attached but the purchaser needs to shift to concerned location as advised by concerned sse. nb:[4] 24 nos. wheel sets with complete fittings and with excluded fitting (released item) and 04 nos.bogie frame with complete fittings are to be handed over by the purchaser to concerned location as advised by concerned sse. nb:[5] delivery will be given in numbers. nb:[6] the purchaser is required to take adequate safety measures so that no railway property is near vicinity of the cutting spot is damaged in any way. the purchaser will be responsible for any damage/fire accident to the railway property caused during operation and delivery. and the purchaser will be solely responsible of any loss applied ( railway employee or any other person) caused due to any activities involved while dismantling /cutting, of the coaches, transportation loading and unloading of all excluded fittings of the coaches . including wheel sets and trolleys. [custodian/stock holder - sse-emu-56 for motor coaches and sse-carraige-kgpw for tc coaches]
Tender For modification for change in location of air spring sensor from bogie bolster above air suspension bellow to bogie under frame of 3-phase memu rakes at memu shed, gaya.
Tender For bogie frame assly (machined) for air spring in secondary suspension for lhb coaches to drg no: (a) 66703001, col.i alt.'c' (or) (b*) 834-0-3-002, alt 'b' suppliers commitment will be there to supply as per drawing-(a) (for lhb non ac air spring coaches), or as per drawing -(b)(for lhb-ac air spring coaches) *for identification purpose of bogie frame, (i)drg (a) shall be marked with yellow paint on brake beam end face on both sidesof bogie frames and n227 is to be punched in letter height of 10mm after year or availble space on other location of bogie number plate, (ii)drg (b), a242 is to be punched in letter height of 10mm afteryear or availble space on other location of bogie number plate. the ratio of supply between (a) & (b) has to be confirmed before the issue of purchase order. rate quoted will beapplicable to both drawing-(a) and drawing-(b). special condition : the material specification for plates of various thickness used for fabrication of bogie frame will be as per en10025, part-5, 2005 . grade s355 j2w+n ,in lieu of earlier specified material grade st 52.3 and s355 j2 g3 , en10025/29 in various related sub assembly and component drawings and specn.mdts-213, rev-04 or latest and mdts-166, rev-02 or latest shall be generally followed. time lag between shot blasting and painting should not be more than 30 minutes in any case. packing condition as per document no.mpm0010 e ver-6.0 pi159 & packing condition as per drg.no. icf/j&t/sk-1823. stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b) welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warranty period: 84 months after the date of delivery ]
Tender For supply of "suspension strap on bogie frame as per icf drg. wtac3-0-3-317 alt-a/nil. specn: t-0-3-634 [ warranty period: 30 months after the date of delivery ]