Web Analytics Made Easy - StatCounter

Insulating Liners Tenders

Get complete information related to latest Insulating Liners Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Insulating Liners Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Insulating Liners Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39244968 Due date: 20 Mar, 202520 Mar, 2025 NA
Tender For manufacturing & supply of combination high viscous nylon (hvn) -66 insulating liners for use with erc mk-iii flat toe on concrete sleeper for 52 kg rails confirming to drg. no. rdso/t-3707 (gauge side liner) & t-3708 (non gauge side liner) (or latest alt. if any), as per confirming to irs specification s. no.t-44-2023 (second revision) or latest. (one set of liner consists of one number hvn liner to rdso drg. no. t-3707 and one number hvn liner to rdso d rg. no. t-3708) (the alteration in drawings and specifications issued by rdso up to seven days before the tender closing date shall be applicable to this tende r.) [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39568757 Due date: 07 Apr, 202507 Apr, 2025 NA
Tender For manufacturing and supply of 6400 mm over riding curved switches for 1 in 8.5 turn out - bg 60 kg rails on psc sleepers to rdso drg. n o. t-4966 alt. 6 (or latest alt.) as per specification irs: t-10-2023 with latest alteration as amended. complete set with all components/fittings/parts, nylon cord reinforced grsp, check rails etc. as listed in the rdso drawing t-4966 alt. 6 (or latest alt.) and excluding insulating liners, erc, fishplate & fish bolts. (the alt in drawing and specification issued by rdso up to ten days prior to tender closing date shall be applicable in this tender) note: - the responsibility to procure rails will solely lie with the manufacturer (bid including rail cost/per set) in terms of railway board letter no. 2022/trac k-i(p)/fabricators dt. 24.01.2022. [ warranty period: 30 months after the date of delivery ]

Central Government And Public Sector

CTN :39550406 Due date: 07 Apr, 202507 Apr, 2025 NA
Tender For supply of derailing switches , bg, 60 kg. (uic) on psc sleeper as per rdso drawing no. t-6068 com plete with latest alteration and specifications irs: t-10-2023 alt.04 , complete with all parts excluding st andard fish plate and bolts, fang bolts, plate screw, e.r clips, liners, gr pads and insulating liners [ w arranty period: 30 months after the date of delivery ]

Central Government And Public Sector

CTN :39246847 Due date: 13 Mar, 202513 Mar, 2025 NA
Tender For supply of 6400 mm over riding derailing switches , bg, 52 kg. (uic) on psc sleeper as per rdso dra wing no. t-5836 alt;03 complete with latest alteration and specifications irs: t-10-2023 {with latest ame ndment i.e. 30 days prior to date to tender opening}. complete with all parts excluding standard fish pla te and bolts, fang bolts, plate screw, e.r. clips, liners, gr pads and insulating liners. [ warranty perio d: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39533914 Due date: 21 Apr, 202521 Apr, 2025 NA
Tender For manufacturing and supply of 10125 mm o/r (curved) fan shaped switches for 1 in 12 t/out for bg 60 kg on psc sleepers to rds o drg. no. t-4219 with latest alteration and confirming to specification irs t-10 as amended up date (with check rails) complete with stock rai ls and all parts including check rails as listed in the drawing, but excluding, grooved rubber sole plates, insulating liners, elastic rail clips, plat e screw, fish plates and fish bolts. (the alterations in drawing and specification issued by rdso up to one month prior to tender opening date s hall be applicable.) [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39533915 Due date: 24 Apr, 202524 Apr, 2025 NA
Tender For manufacturing and supply of 6400 mm o/r (curved) fan shape switches 1 in 8.5 t/out for bg 60 kg on psc sleepers to rdso dr g. no. t-4966 with latest alteration and confirming to specification irs t-10 as amended up date (with check rail) complete with stock rails list ed in the drawing but excluding, grooved rubber sole plates, insulating liners, elastic rail clips, plate screw, fish plates and fish bolts. (the alt erations in drawing and specification issued by rdso up to one month prior to tender opening date shall be applicable.) [ warranty period: 3 0 months after the date of delivery ]

Central Government/Public Sector

CTN :39497860 Due date: 20 Mar, 202520 Mar, 2025 NA
Tender For supply of gfn insulating liners for rail track - insul liner, gfn-66,52kg/52kg, rt-3702 , insul , liner,gfn-66,60kg/60kg,rt-3706 , comb gfn insul liner, 52/60kg, rt-3707 , end cut gfn liner, 52/52kg,t-3702 , end cut comb gfn liner, 52/60kg,t-3707 , end cut comb gfn liner, 52/60kg,t-3708 , end cut , insulating, liner,r/t-3706,60kg

Central Government/Public Sector

CTN :39521339 Due date: 24 Mar, 202524 Mar, 2025 NA
Tender For manufacture and supply of glass filled nylon-66 (gfn-66) insulating liners to rdso drg. no.t-37 07-3708 (alt-8), with latest alteration if any, up to date of tender notice, for use with psc sleeper to drawing n o.rt-2496 and confirming to irs specification t-44-2023 (second revision) with latest amendment if any, as a mended up to date of tender notice. [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ]

CTN :39431593 Due date: 10 Mar, 202510 Mar, 2025 NA
Tender For supply of procurement of insulating liners and gfn liners.

Central Government/Public Sector

CTN :38884100 Due date: 17 Mar, 202517 Mar, 2025 NA
Tender For fabrication and supply of 7000 mm or switches [curved] for 1 in 8.5 diamond crossing with double slip bg for 52 kg. rails [uic] on psc sleepers layout to rdso drg. no. t- 5364/ latest alteration & spn, irs/t-10-2000 for fabricated switches corrigendum no 01 of dec 2016 (complete with all parts listed in the sub assembly drawings but excluding standard fish plate, fish bolts, elastic rail clips and insulating liners/metal liners) as amended upto date of closing of tender..note:: latest alteration/ corrigendum wherever used will mean the alterations/ corrigendum up to the actual date of closing tender for which no additional payment shall be made
 Loading, Please wait...

Connect us via What's Up