Web Analytics Made Easy - StatCounter

Isolation Transformer Tenders

Get complete information related to latest Isolation Transformer Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Isolation Transformer Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Isolation Transformer Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :44338108 Due date: 03 Apr, 202603 Apr, 2026 45.00 Lacs
Tender For corrigendum : repairs/maint of isolation transformers, voltage stabilizers, earthging system and allied works at afs kalaikunda under ge (af) kalaikunda

CTN :44611610 Due date: 13 Apr, 202613 Apr, 2026 22.00 Lacs
Tender For tender for annual rate contract works of maintenance of distribution transformer center and supply, installation, testing & commissioning earthing system for transformer center with maintenance free, ready capsules, pipe in cage (pic) type earthing and connection to the various parts of transformer center using gi strip and gi nut bolt at kharvasa sub division under jurisdiction of sachin division.

CTN :44611614 Due date: 13 Apr, 202613 Apr, 2026 22.00 Lacs
Tender For tender for annual rate contract works of maintenance of distribution transformer center and supply, installation, testing & commissioning earthing system for transformer center with maintenance free, ready capsules, pipe in cage (pic) type earthing and connection to the various parts of transformer center using gi strip and gi nut bolt at sachin-2 sub division under jurisdiction of sachin division.

CTN :44611619 Due date: 13 Apr, 202613 Apr, 2026 22.00 Lacs
Tender For tender for annual rate contract works of maintenance of distribution transformer center and supply, installation, testing & commissioning earthing system for transformer center with maintenance free, ready capsules, pipe in cage (pic) type earthing and connection to the various parts of transformer center using gi strip and gi nut bolt at sachin-1 sub division under jurisdiction of sachin division.

CTN :44611628 Due date: 13 Apr, 202613 Apr, 2026 22.00 Lacs
Tender For tender for annual rate contract works of maintenance of distribution transformer center and supply, installation, testing & commissioning earthing system for transformer center with maintenance free, ready capsules, pipe in cage (pic) type earthing and connection to the various parts of transformer center using gi strip and gi nut bolt at sachin(u) sub division under jurisdiction of sachin division.

CTN :44683220 Due date: 18 Apr, 202618 Apr, 2026 NA
Tender For isolation transformer

CTN :44655592 Due date: 06 Apr, 202606 Apr, 2026 4.86 Lacs
Tender For supply of isolation transformer (q2)

CTN :44635875 Due date: 13 Apr, 202613 Apr, 2026 22.00 Lacs
Tender For corrigendum : tender for annual rate contract works of maintenance of distribution transformer center and supply, installation, testing & commissioning earthing system for transformer center with maintenance free, ready capsules, pipe in cage (pic) type earthing and connection to the various parts of transformer center using gi strip and gi nut bolt at knasad(r) sub division under jurisdiction of sachin division.

CTN :44635882 Due date: 13 Apr, 202613 Apr, 2026 22.00 Lacs
Tender For corrigendum : tender for annual rate contract works of maintenance of distribution transformer center and supply, installation, testing & commissioning earthing system for transformer center with maintenance free, ready capsules, pipe in cage (pic) type earthing and connection to the various parts of transformer center using gi strip and gi nut bolt at oon sub division under jurisdiction of sachin division

Central Government And Public Sector

CTN :44632405 Due date: 31 Mar, 202631 Mar, 2026 NA
Tender For supply, testing, installation and commissioning of pure sine wave 10 kva online ups with 180 ah, 12 volt battery bank consisting of 16 nos batteries along with battery rack. back up time 180 minutes minimum. switching technology: igbt-pwm. with inbuild isolation transformer. input voltage: ac single phase 160v-260v output voltage: ac single phase, 230 volt, 50 hz. protection for under voltage at battery terminal, short circuit & overload at ups output terminal, overload limit: 20% overload for minimum 10 minutes, 50% overload for minimum 1 minutes, 50% overload for minimum 3 second. additional 16 nos batteries with same rated capacity and specification as above along with battery rack to be provided as spare battery bank. battery type smf-vrla(make-as per mii policy) [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up