Tender For corrigendum : supply of 3- phase to single phase under slung type isolationtransformer (mae675uv2) of 20kva capacity for auxiliary loads .rating 20 kva . impedance voltage :<5% , freq:50hz, primary :415v ac,27.7a, delta . sec-1: 15kva,230vac ,21.7a,3*1-phase , sec-2: 4.1kva ,110vac,12.4a,3*1-phase , conforming to icf specification no. icf/elec/160 rev-0 suitable for vande bharat train set. make:- medha or similar.
Tender For provn of isolationtransformer alongwith earthing for smc, provn of lightening arrestor at fol store of mt section and provn of insfrastructure at unit bcr at af stn bhuj
Tender For supply of air breather / dehydrating breather for siemens energy make traction transformer (gp194) of 3 phase memu [ warranty period: 30 months after the date of delivery ]
Tender For supply of radiator cooler motor for abb make traction transformer type: lot-1216 as per abb material code:xch204007bqh. (material will be purchased from oem or it is authorized dealer only.) [ warranty period: 30 months after the date of delivery ]
Tender For supply, erection, commissioning and testing of igbt based 3-phase drivepropulsion equipment with physical medium i.e. esd/emd/ofg for multi-functional vehicle bus (mvb) as per iec 61375, terminal bracket, bus bar link and cu braid required for connection between main transformer and traction converter, auxiliary converter, interfacing connectors, cables and cable loom required for connection from vcu 1/2 to sb1/2 panel. as per specification no. i)rdso/2008/el/spec/0071, rev.5 for igbt based 3-phase drive propulsion equipment, ii) clw/es/3/0458 alt.e or latest for control cables iii) clw/es/3/0459 alt.c or latest for screenedcable iv) clw/es/3/0124 alt.o or latest. the detailed scope for erection isenclosed at annexure-a. note: -the scope shall also include the removal of allexisting gto-based equipment, viz. burs, srs, and vcus etc., directly related to the provision of the igbt-based 3-phase drive propulsion system withphysical medium, as required for the integration of the new equipment. thedetailed scope for erection is enclosed at annexure-a. associated equipmentremoved during the replacement from gto to igbt shall be refitted (as per thesite engineer's guidelines), as necessary, to ensure proper functioning of the igbtpropulsion system. the firm shall ensure that, upon completion, the propulsionsystem is fully functional in all respects. all works and accessories necessary toachieve this objective, whether explicitly mentioned herein or not, shall be deemedto be included in the scope.(documents attached)