Get complete information related to latest Jaw Adopter Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Jaw Adopter Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Jaw Adopter Tenders.
Tender For corrigendum : supply of lt circuit breaker at vindhyachal and allahabad substation e e - supply of 415v 3400a 75 ka 3-pole ac lt air circuit breaker and accessories for retrofitment as per attached ts and sow , retrofitment kit with copper bus thickness 8mm width 10cm for supplied acb , retrofitment of new lt air circuit breaker in acdb including dismantling of old circuit breaker , spring charging motor , aux. contact sets , bus bar seal off insulators , arc-chutes , moving contacts , arcing contacts fixed moving , springs closing opening , closing coil with resistor , tripping coil with resistor , supply of 415v 1000a 3-pole ac lt air circuit breaker and accessories for retrofitment as per attached ts and scope of work , supply of 415v 800a 3-pole ac lt air circuit breaker and accessories for retrofitment as per attached ts and scope of work
Tender For corrigendum : annual maintenance contract for replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, take up pulley bearings replacement and overhauling of main reducer gearbox, r.c feeders and patch welding of 22" coal pipes from all corners of boiler to classifier outlet gate and dismantling of damaged feeder outlet upper and lower chutes and replacement of new/reconditioned chutes, replacement of center feed pipe of 36" gravimet feeder out let, repairing of 22" coal pipes from classifier outlet gates to all corners of boiler and rectification of coal leaks in critical areas of in service 22" coal pipes (48 no's) from mill outlet bends to fuel inlet bends,clearing of coal jam at bunker chute or bunker raw coal gate of unit-3 and 4, stage-ii, dr m.v.r. rtpp as and when required from the date of awarding work to 30.09.2026
Tender For tggenco ytps 5x800mw chp carrying out the physical inspection of conveyors and chutes to give clearance for running and continuous monitoring of bcn 25, bcn26, bcn7, bcn8ab, bcn9ab, bcn10ab, bcn11ab, bcn12ab, bcn13ab, bcn14ab, bcn15ab in chp and to carryout any other works as instructed by engineerincharge for providing uninterrupted coal feeding to unit bunkers from 01 04 2026 or actual date of commencement.
Tender For replacement of damaged mother and liner plates in 12a/b, 13a/b, 14a/b, 20, 21, 25 conveyors, vibrating feeders, hopper discharge chutes, hopper grid pieces, rail table platform, spill plates, chequered plates and i-beam of weighment table of wagon tippler-5&6 in mm-i/chp/stage-iii/dr.nttps as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Tender For tggenco ytps 5x800mw chp carrying out the physical inspection of conveyors and chutes to give clearance for running and continuous monitoring of bcn 21ab, bcn22ab, bcn23ab, rbcn 2ab, tpc2ab, vgf 5,6,7,8, bf 5,6,7,8, crusher 5,6,7,8, bcn24ab, bcn27ab in chp and to carryout any other works as instructed by engineer incharge for providing uninterrupted coal feeding to unit bunkers from 01 04 2026 or actual date of commencement
Tender For providing labor assistance for emergency coal clearing of coal heaps, slurry coal on all floors of crusher house and jammed coal and wet and slurry coal in crushers, vibrating screens& belt feeder chutes and clearing of heavy coal heaps during rainy season in m-1(crushers), /chp(m.m)-i&ii/dr. nttps. as and when required from 01-04-2026 or from the date of commencement of work to 30-09-2026
Tender For bid to ras supply of conveyor chutes rmhp - conveyor chutes rmhp - as per attached , as per attached , as per attached , as per attached , as per attached , as per attached
Tender For replacement of gravimetric feeder belts replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of r.c.feeder doors,replacement and overhauling of main reducer gear box of r.c.feeders and replacement/repairing of feeder outlet gates and chutes of r.c feeder patch welding of 22 inch coal pipes from all corners of unit-5 stage-iii dr.mvr rtpp as and when required during the period of 01.05.2026 to 30.09.2026