Web Analytics Made Easy - StatCounter

Lavatory Accessories Tenders

Get complete information related to latest Lavatory Accessories Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Lavatory Accessories Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Lavatory Accessories Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39417329 Due date: 26 Feb, 202526 Feb, 2025 NA
Tender For supply of lay out of interior notices with (non brailie script) for lwscz2 coaches (ref . drg.no.lwscz2-6-4-001,alt- b,item nos. 2, 5, 8, 9, 14, 15, 16 & 17)consists of: 1)icf name plat e, icf/sk3-6-4-037, alt-e item-1 = 2 nos. 2)notice for lavatory, icf/std-6-4-050, alt-nil, item-1 = 4 nos. 3)unified notice for fire prevention & safety, icf/std-6-4-045, alt-a, item-1 = 2 nos. 4)indication plate & sticker for emergency window, lscn/eog-6-4-008, col-1, alt-a = 4 nos. 5)restoration for pneum.emergency brake,.lwscwac/eog-6-4-013, alt-a, item-1 = 2 nos. 6)c oach number & seat capacity plate, lgs/eog-6-4-005, alt-j item-5 = 2 nos. 7)interior marking diagram, icf/std-6-4-072,alt-a = 1 set. 8)letter to stop train pull handle, icf/sk3 6-4-051, al t- g, item-9 = 2 nos. please visit icf vendor portal for downloading drawing https:// vp.icf.gov.in/ ven dtendordetnew.php using key 0725jg9xn5b1588 [ warranty period: 30 months after the date of del ivery ]

Central Government / Public Sector

CTN :39405085 Due date: 05 Mar, 202505 Mar, 2025 NA
Tender For supply of aluminum flexible ducting pipe for exhaust air arrangement for lavatory in lhb coaches dia -125 mm to r cf drg. no. lw64236 alt. b, item no. 1 to rcf spec. mdts- 130 rev. 1or latest [ warranty period: 30 months after the date of delivery ]

Central Government / Public Sector

CTN :39405363 Due date: 03 Mar, 202503 Mar, 2025 NA
Tender For supply of gangway ceiling mould for lavatory module upper portion confirming to lgds drawing no. c&w.lgd.sk.no.1176, alt-nil, item-1 and item-2. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39405936 Due date: 26 Mar, 202526 Mar, 2025 NA
Tender For supply of modified lavatory latch with indicator (stainless steel) to drg.no icf-sk-5-6-0 83 alt-c (50 percent col-iii and 50 percent col-iv of total quantity) ,prasadhan in devnagri font to be written instead of izlk/ku above toilet in item number 03. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39395804 Due date: 25 Feb, 202525 Feb, 2025 NA
Tender For supply of item no 1) indicating bolt for lavatory door of lhb coaches as per rcf drawing no. cc56438 alt

CTN :39350825 Due date: 10 Mar, 202510 Mar, 2025 NA
Tender For supply of packing plate stopper, drg.no. g/sd3-1055 item no. 02, (material used for supporting drainpi pe in lavatory) [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39092856 Due date: 20 Feb, 202520 Feb, 2025 NA
Tender For supply of lavatory door arrangement for nac coaches as per drg no. icf/std-5-6-011 alt c item as per col.4 [ warranty period: 30 months after the date of delivery ]

CTN :39316902 Due date: 10 Mar, 202510 Mar, 2025 NA
Tender For supply of grill arrangement for lavatory door of ac/nac coaches to icf's drg.no. icf/std-5-6-015 , item no.-1 to 5,alt no.-h col-i [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39316980 Due date: 13 Mar, 202513 Mar, 2025 NA
Tender For supply of funnel for chute pipe for lavatory, drg. no. llh/sk- 45/78, item-7, alt-4".

Central Government/Public Sector

CTN :39316981 Due date: 13 Mar, 202513 Mar, 2025 NA
Tender For supply of lavatory door arrangement complete assembly for ac coaches to drg. no. icf/std-5-6-011 alt. c, qty. 50 % lh and 50 % rh. matl. & spec. as per drg. colour of lp sheet ac sp-2-02. note:- item-21 grill arrag. to be shifted to the bottom of door frame horizontally with its centre line at 315 mm above fro m bottom of the door frame. [ warranty period: 30 months after the date of delivery ]
 Loading, Please wait...

Connect us via What's Up