Tender For supply of safety sign boards and others - retro reflective accident prone area sign board 5 ft by 3 ft 90 sq ft , retro reflective road signalling sign board 5 ft by 3 ft 64 sq ft , retro reflective sign board sop cop 5 ft by 3 ft 375 sq ft , vehicle safety red flag with beacon light 9-33v dc reflective , retro reflective unauthorized prohibited sign board 5 ft by 3 ft , breath alcohol detector analyzer 0-500 bac, lcd display , hard crete compound cable vulcanizing gum , barricade tape danger
Tender For supply of retro reflective type 25kv danger board with skull for height gauge in bilingual ,english, hin di, as per rdso specification no. eti/ohe/33a (12/97) rev-8 [11/2012 ]
Tender For installation, testing, commissioning and supply of lcd solar power plant (roof top) for ong rid system, three phase 17kw power with output voltage 415v, complete with solar spv array, module m ounting structure, power conditioning unit (pcu) consisting of maximum power point tracker (mppt), invert er (200v-800v, max output current- 27a) and controls & protections, inter connect cables and switches. sw itching device-igbt, pure sine wave output, ip-65, electric cable for input (pv module to inverter)- 1x4 sq.m m copper cable, lengh-25 mtr, electric cable for output (inverter to net meter)- 3.5x10 sq.mm copper cable , lengh-30mtr, lightning arrester, earthing, danger board, pv module (as per is: 14286) rating- 250-1000wp , no. of pv module- 51 nos., total load on roof- 60 kg per sq.m (max), minimum clearance of structure from roof level- 300mm, suitable to withstand wind pressure of 180km/hr, area required for installation- 180sq. m. installation & testing of the complete system including civil work, designing, cabling work with suitable c lamps & fasteners etc. make- tata power solar, vikram solar, spj solar or similar warranty of solar power pl ant -warranty & guarantee : warranty of pv modules : >/= 25 years from the date of commissioning warra nty of inverter : 8 years from the date of commissioning minimum guarantee for maintaining of output peak watt capacity : >/= 90% at the end of 10 years and >/= 80% at the end of 25 years ]