Get complete information related to latest Bareli Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bareli Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bareli Tenders.
Tender For corrigendum : supply of polyamide flexble conduit pg-16, annx.-a, tab.a-1, item-3 ,as per specification no.rdso/pe/spec/ac/ 0138- 2009, rev-1. packing instruction -spi-224. [ warranty period: 30 months after the date of delivery ]
Tender For supply of coolant for cnc air plasma cutting machine spec: as per annexure no:-m-100/bogie-ns/bs/air plasma/coolant-02 , packaging: material should be packed/contained in can/container of 20 litres capacity, [ warranty period: 30 months after the date of delivery ]
Tender For supply of guide roller housing assembly item no. 362, 331, 420, 463 460, 464, 410, 485, 430, 804, 466, 440, 441, 481, 461, 450 453, 451 as per drawing number no. t-25238, guide roller housing as per drawing no. t-25099 with bearing as per assembly drawing no. t-25238 and guide roller shaft as per drawing no. t-25109 in assembled condition [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of ifm electronic make pressure sensors, inductive sensors, level sensors, & temperature transmitters for chip conveyor of machining & testing line and capacitive sensors , flow meter & flow sensors for n30 & rq machine. a set list consisting of 18 items, detailed specification and quantities as per annexure-a attached in documents.. [ warranty period: 12 months after the date of delivery ]
Tender For corrigendum : supply of handle for water tank flap arrgt. (acp) for amrit bharat coaches, as per drawing: mi008051 alt nil item 6,packing instruction no pi:013 [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of rain water gutter as per planning set list number: 2 10113.0.20.110.103 alt. 'a' packing instruction: pi042 ver. 1 [ warranty period: 96 months after the date of delivery ]