Get complete information related to latest Bareli Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Bareli Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Bareli Tenders.
Tender For supply of led light fitting for passenger alarm chain indication light as per spec.no. rdso/pe/sp ec/tl/0091-2016, rev-1 as per drawing lw 76098(alt-a) type" i" (3 watt ) with rcf annexure 1, 2 & 3 . packing instruction - spi149. [ warranty period: 72 months after the date of delivery ]
Tender For supply of door stopper for lhb coaches as per drg.no. mi004112 alt a, packing instruction - pi001 [ warranty period: 30 months after the date of delivery ]
Tender For supply of grease of kluberlub be41-1501 for draw 1250 machine of forging area of fwp, "technic al specification as per c1", packing: barrel/drum of 180 kg. [ warranty period: 30 months after the d ate of delivery ]
Tender For supply of battery box mounting for lhb coach and 9 holes of dia 25 mm as per sked-3 83 in drg.no. 3 10113.0.76.700.117 as per drg.no. 1 10113.0.76.700.005 except item no. 5,22,23, 25 to 27 alt 'c'. or latest, packing instruction - pi100. [ warranty period: 30 months after the da te of delivery ]
Tender For supply of allen bolt m24x150 mm; thread length 70mm; material: grade 10.9, mkae- tvs, unbrak o, caparo [ warranty period: 30 months after the date of delivery ]
Tender For supply of one coach set of s.s breather assembly for train 18 u/s water tanks as det ailed below 1) s.s breather assembly 1/2" to drg no icf/std-6-3-030, col-1, alt-'a' -1 no 2) s. s breather assembly 3/4" to drg no icf/std-6-3-033, col-1, alt-a,-1 no. material to aisi304. pac king instruction pi001. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of ifm electronic make spares(photoelectric distance sensor and other item) for heat treatment line & machining and testing line in fwp as per "annexure-a" [ w arranty period: 24 months after the date of delivery ]
Tender For supply of set of krom schroder make items for hardening furnace, tempering furnac e and rhf of fwp as per annexure"a" [ warranty period: 30 months after the date of delivery ]