Get complete information related to latest Liner Repair Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Liner Repair Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Liner Repair Tenders.
Tender For supply of complete vehicle servicing with replacement of following spares , fuel filter , oil filter , bypass filter , air filter , engine oil , fan belt , gear oil , assy hose air filter outlet , labour charge for servicing , servicing and cleaning of radiator complete with acid wash and brazing the leakage points , coolant , radiator fan motor assy with cooling fan , thermostat assy with gasket , labour charge , complete repair of brake system after replacement of the following spares , brake oil , brake shoe , front and rear oil seal , wheel cylinder assy front with nipple , wheel cylinder assy rear with nipple , labour charges , repair to electrical system with replacement of following , wiring complete with ignition switch assy , horn 12 volt high tone , wiper motor , wiper blade , head light , indicator lamp , battery lead , distill water , complete wheel balancing after replacement of the following unserviceable items , wheel bearing , wheel stud full threaded , wheel check nut , lock nut pin , grease , labour charge including tyre rotation
Tender For corrigendum : tender for supply of brakes spares for kmrcl project - compressor air supply unit testbenches and air supplyoverhauling tools including airquality test facilities ofcomplete system , dew point meter , assembly sleeve , assembly sleeve , automatic pneumatic valve testbench complete with brake electronics calibration toolsand test specimen , brake caliper test bench andrepair tools , diaphragm lifter (for wsp & stvvalve) , assembly fixture (for air dryer) , rapid coupling , rapid coupling , rotating gear simulator (forspeed sensors) , front adapter
Tender For corrigendum : supply of repair of eicher by drain burned out engine oil and refilling the engine oil including replacement of unserviceable oil filter 01 , repair of eicher dismantling complete fuel tank and cleaning the same thoroughly with checking and necessary cleaning of fuel pipe line , repair of eicher by complete opening the radiator and cleaning the same with cleaning agent and checking for leakages including , repair of eicher by check up complete wiring system and replacement of 15a fuses , repair of eicher by taking out gear box complete and removing the unserviceable clutch plates , repair of eicher by repair to brake system by replacing the worn out part such as brake master buster assembly master cylinder assembly , repair of eicher by complete taking down front load springs both sides , repair of eicher by taking out the joint system and replacement of unserviceable spares such as joint crosses 2 nos joint lapping - one set and complete testing. , repair of eicher by wheel alignment and wheel balancing , repair of eicher by water servicing of vehicle complete , repair of tata xenon by taking out gear box complete and removing the unserviceable clutch plate , repair of tata xenon complete opening the radiator and cleaning the same with cleaning agent , repair of tata xenon drain burned out engine oil and refilling the engine oil including replacement of unserviceable oil filter , repair of tata xenon taking out the joint system and replacement of unserviceable spares such as joint crosses 2 nos joint lapping - one set and complete testing. , repair of tata xenon complete taking down front load springs both sides , repair of tata xenon repair to brake system by replacing the worn out part such as brake master buster assembly , repair of tata xenon check up complete wiring system and replacement of 15a fuses 5 nos indicator lamps , repair of tata xenon wheel alignment and wheel balancing , repair of tata xenon water servicing of vehicle complete
Tender For corrigendum : repair of eritga and swift dzire - repair of swift dzire complete taking out the unserviceble engine oil and refilling with new engine oil , repair of swift dzire complete opening the radiator and cleaning the same with cleaning agent , repair of swift dzire repair to brake system by replacing the wron out part including braek fuel and testing brake system , repair of swift dzire taking down complete front load springs both sides dismantaling cleaning with kerosene properly and replacement of unserviceable centre bolts etc , repair of swift dzire water servicing and greasing , repair of swift dzire labour charges , repair of ertiga complete taking out the gear box from the engine and removing the clutch plate, pressure plate, release bearing which is unserviceable and refixing with new spare parts , repair of ertiga taking out the joint system and replacement of unserviceable spares such as joint cross etc , repair of ertiga complete opening the radiator and cleaning the same with cleaning agent , repair of ertiga taking down complete front load springs both sides dismantaling cleaning with kerosene properly and replacement of unserviceable centre bolts , repair of ertiga water servicing and greasing , repair of ertiga replacement of silencer muffler including tale pipe and fixing it with packing 4 nos complete testing
Tender For supply of taking down filter set oil filter gear oil brake liner fan belt and hose pipe wheel greasing complete and change of oil 15 w40 w , filter set assembly , oil filter , gear oil , brake fluid , hose pipe , engine oil 15w 40 , coolant , material and labour for repair to brakes system complete after replacement of following worn out spares , shock absorbers , front brake shoes , rear brake shoes , material and labour for servicing of front head light and replacement of the following accessories , control wiring repairs , light fuses kit , front head light assy , taking out the wheel assembly hub compete of both front and rear wheels complete and refixing the same to its original position after replacement of worn out broken spare parts such as following , wheel service kit front wheel , wheel service kit rear , kin pin shims , kin pin bush , lock pins , crown pinion oil seal , chuck nut , centre bearing , wheel cylinder bushes , gasket fr and rear hub , bearing grease
Tender For supply of a supply and fix for following accessories for maruti dzire lxi vehicle seat cover exec beige finish lining pu , b pvc plastic foot mat beige , c carpet mat for dickey , d steering cover steering grip pu premium , e abc dry powder type based fire extinguisher with stand complete , f car freshner godrej , g liquid wax body polish waxpol 100 ml , h dashboard polish waxpol 100 ml , a servicing the ac system of vehicle swift dzire ba no 23b 138633n recharging of gas cleaning the ac system of vehicle taking out u s parts , b supply and fix only for ac cutout switch complete , c supply and fix only for renewal of oil pipe , d supply and fix only for renewal of water pump assembly , e supply and fix only for renewal of discharge pipe , f supply and fix only for renewal of suction pipe , g supply and fix only for renewal of liquid pipe , h supply and fix only for renewal of blower pipe with all connected items as directed by eic , m and l for dismantling carefully the defective spare parts from the veh and refixing the same spares items , i oil filter , ii air filter , iii fuel filter , iv uj cross , v disc pad , vi rear brake cylinder , vii wheel aliangment balancing , viii rear brake shoe , xi indicator assy , xii kamamni main leaf , xiii kamamni main3 rd leaf , xiv kamamni bush , xv centre bolt , xvi break shoe lock assy , xvii break fluid , m and l for repair replacing the unserviceable spares of fuel injection pump assembly dismantling cleaning servicing overhauling including calibration of injection nozzles , a injector nozzle , b fip kit , c plunger with spring , d injector pipe , m and l for repair to clutch assembly by dismantling carefully u oblique s clutch plate pressure plate by unscrewing nuts and bolt welding cleaning servicing to clutch assembly components , i clutch paddle rubber pad , ii clutch plate , iii pressure plate , iv clutch release bearing , m and l for repair to gear box assembly by disconnecting gear box its mounting by unscrewing nuts and bolts dismantling carefully gears draining out , i spider bearing , ii 2nd gear pinion gears , iii gear shaft bearing , iv gear oil , m and l for making center locking arrange ment to the veh as the veh is mannually operated including the connectde items complete all as specified and as directed by engr in charge , painting of front bumper after dent removal of swift dzire ba no 23b 138633n with one coat of red oxide primer and two coat of paint as match with existing colour of body complete , material and labour for lifting of vehicle on jack taking all 4 wheel carefully cleaning and greasing of bearing hubs and reassemble in original position
Tender For supply of set of spares of bogie mounted brake system for boxnhl/bcnhl wagons for knorr br emse design bmbs. drawing no: as per kit. material and specification: as per drawing and conforming to rdso's spec. no. wd-23 bmbs-2008 (rev.1) with amend. no. 1 of sept. 2016. [ warranty period: 36 months after the date of delivery ]
Tender For corrigendum : ltsa for services / inspection and refurbishment of spares for gas turbines 230-gt-01 / 02 / 03 and 21-gt-04 / 05 at cpcl, manali - part-a inspection / servicescharges for inspection / services in cpp & oph gas turbines (230-gtg-01/02/03, 21-gtg-04 & 21-gtg-05) for 1st year - 2025 as per scope fo work with time schedule and special terms & conditions attached as annexures., combustion inspection (ci), mechanical, combustion inspection (ci) instrumentation, borescope inspection (bi), major inspection of gt(mi) mechanical, major inspection of gt(mi) instrumentation, auxilary gear box (agb) inspection, load gear box inspection, extended combustion inspection / hot gas path inspection, mechanical / control & instrumentation -ta (technical adviser) - per day (8 hrs), mechanical -ta (technical adviser) - per hour, extra hours beyond 8 hrs on normal working days and on sundays and public hoidays, to & fro travel charges (economy class), boarding & lodging charges & local charges, per ta per visit, to be paid at actuals on submission of doumentary proof, exhaust plenum replacement, igv relocation along with mi, gt frame-v rotor repair, part- b reconditioning of sparescharges for reconditioning services in cpp & oph gas turbines (230-gtg-01/02/03, 21-gtg-04 & 21-g tg-05) for 1st year - 2025 as per scope fo work with time schedule and special terms & conditions attached as annexures, repair of first stage nozzle s1n(1no), repair of 2nd stage nozzle s2n (1no), repair of 1st stage shroud (std), repair of 2nd stage shroud (std), repair of 2nd stage (honey comb) shroud (set=30nos), repair of 1st stage buckets(1set= 120 nos.), repair of 2nd stage buckets (1set=90 nos.), repair of combustion liners, repair of transition pieces, repair, testing calibration of dual fuel nozzle, repair of cross fire tubes, part- c supply of spares for reconditioning & repaircharges for supply of parts for replacement towards repair & reconditioning of oph gas turbines (230-gtg-01/02/03, 21-gtg-04 & 21-g tg-05) for 1st year - 2025 as per scope fo work with time schedule and special terms & conditions attached as annexures., hula seal for combustion liner, cowl cap for combustion liner, cowl cap assembly for combustion liner, xft collar for combustion liner, aft sleeve for combustion liner, fixed seal for transition pieces, floating seal for transition pieces, transition piece assembly for dual fuel nozzle, air cone for dual fuel nozzle, gas tip for dual fuel nozzle, gasket for dual fuel nozzle, lock plate for dual fuel nozzle, t connector for dual fuel nozzle, compressor rotor blade kit with spacer for frame-v for gt rotor repair, marriage hardware for frame-v for gt rotor repair, note: 1. this ltsa contract is valid from 01.01.2025 to 31.12.20292. the above mentioned unit rates are for calendar year 2025.3. to arrive at unit rates for calendar year 2026 = unit rate in 2025 x fixed annual escalation4. similarly for 2027, 2028, 2029, the unit rates will be calculated as above on annual compounding basis from 1st january of every year.5. for part - a & part - b, the fixed annual escalation will be 6%6. for part - c, the annual escalation will be 4%