Web Analytics Made Easy - StatCounter

Lower Bearing Journal Tenders

Get complete information related to latest Lower Bearing Journal Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Lower Bearing Journal Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Lower Bearing Journal Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government And Public Sector

CTN :43223582 Due date: 06 Jan, 202606 Jan, 2026 NA
Tender For corrigendum : tender for supply of over running clutch fxm 8 p no 11501002 , hydro motor flange internal spline , hydro motor to over run clutch flange , hydro motor radial ball bearing , hydro motor bearing shell 11501052658 , hydro motor bearing shell 115010162658 , hydro motor shaft nut , hydro motor washer

CTN :42513663 Due date: 10 Jan, 202610 Jan, 2026 NA
Tender For corrigendum : tender for supply of lock l 08 , bearing ball single groove , taper roller bearing bore 20mmx47mmx15mm , bearing taper roller , bearing ball single row rigie radial 60x130x31mm , bearing , bearing ball angular contaot , bearing roller , bearing de type nu324 , ds generator piston solenoid valve external hp hyd system , o ring , skf bearing 6208 2z , bearing ball taper roller 45x85x19mm , bearing ball 6203zz

State Government

CTN :43085670 Due date: 12 Jan, 202612 Jan, 2026 NA
Tender For corrigendum : supply of various size & types of rtds for 3x210 mw unit 3,4 & 5 at gandhinagar tps. - duplex rtd pt-100 as per gtps drg no ext-inst-00434 for unit no 3 and 4 id fd pa fan and motor and coal mill motor de nde bearing temperature measurement system., solid sintered tungustan carbide thermowell, length 325 mm, process conn. m 33 x 2 (m), inst conn. 1/2 inch bsp (f) for coal mill out let temperature as per drg. no.gtps/ext- imd-ii -00713, rtd duplex 3 wire pt-100 for coal mill outlet temp, od 6 mm,ss 316 sheath material insulation compact filled mgo insertion length 450 mm end connection 1/2 inch bsp head die cast aluminium ip 65.ext, pipe 150 mm., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 6 mm, sheath length: 60 mm., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 10 mm, sheath length: 300 mm straight., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 100 mm straight, cable length: 15 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 8 mm, sheath length: 25 mm., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 250 mm straight, cable length: 20 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 250 mm straight, cable length: 10 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 12 mm, sheath length: 350 mm straight, cable length: 10 meters., rtd, pt-100, duplex, 3 wire mineral insulated (compact mgo filled) without head (head less), sheath dia: 08 mm, sheath length: 250 mm straight, cable length: 10 meters., headless rtd(pt-100type) for f.d.fan of gtps unit no 5-d.e. /n.d.e. bearing temperature measurement,sheath dia. 8 mm, sheath length: 180 mm, process connection (male): dia:17.5mm thread:1.0 mm pitch 15 mm with adjustable sewage lock type., headless rtd (pt-100 type) for turbine,boiler and balance of plant services temp measurement,sheath dia. 5 mm, sheath length: 300 mm, process conn: -18 od x thread 1.0 mm pitch length 12mm with adj.sewage lock type, headless rtd (pt-100 type)for c/m o/l shaft low radial brg, warm shaft radial brg, o/l shaft brg temperature measurement, sheath dia.5.5 mm, sheath length: 432 mm,process connection:1/2 inch bsp (m) thread 14g with adj. sewage lock type, headless rtd for ce pump journal brg, cw pump thrust / general brg temp measurement, sheath dia.4.5mm,process onnection:1/2 inch bsp (m) with adjustable sewage lock type,sheath length:200 mm,, rtd pt-100 with thermowel element : is:2848,duplex /ungrounded t/w construction straight , material : solid tungusten carbide process conne: screwed m 33 x 2, ss316 t/w insertion lenth ( l1) 325 mm t/w od :22 mm, rtd (pt-100 type) for coal mill of gtps unit no 5-upper radial bearing temperature measurement, and dimension and material of construction as per drg. no: gtps / ext / c and i / 00775., head with plug and socket type temperature element pt-100 rtd for bearing temperature of high speed shaft coupling side, insertion length 170 mm., head with plug and socket type temperature element pt-100 rtd for lower bearing temperature of low speed shaft, range: 0-100 dec c, insertion length 290 mm., head with plug and socket type temperature element pt-100 rtd for lower bearing temperature of medium speed shaft, range: 0-100 dec c, insertion length 365 mm., head with plug and socket type temperature element pt-100 rtd for upper bearing temperature of medium speed shaft, range: 0-100 dec c, insertion length 700 mm., head with plug and socket type temperature element pt-100 rtd for upper bearing temperature of low speed shaft, range: 0-100 dec c, insertion length

Central Government/Public Sector

CTN :42160201 Due date: 30 Dec, 202530 Dec, 2025 NA
Tender For bid to ras supply of single row radial ball bearing no 608 , single row radial ball bearing no 626 , single row radial ball bearing no 629 , single row radial ball bearing no 6001 , single row radial ball bearing no.6001zz , single row radial ball bearing no.6015 , single row radial ball bearing no 6016 , single row radial ball bearing no.6201 , single row radial ball bearing no 6203 , single row radial ball bearing no.6206 , single row radial ball bearing no.6209zz , single row radial ball bearing no.6304 , single row radial ball bearing no 6007 , single row radial ball bearing no 6008 , single row radial ball bearing no 6013 , single row radial ball bearing no.6208zz , single row radial ball bearing no 6300 , single row radial ball bearing no 6301 , single row radial ball bearing no.6302zz , single row radial ball bearing no.6305 zz , single row radial ball bearing no 6214 , single row radial ball bearing no.6215 , double row self aligning ball bearing no 1213k , single row angular contact ball bearing no 7205 , single direction thrust ball bearing no51111 , single direction thrust ball bearing no.51202 , single direction thrust ball bearing no 51205 , double row self -aligning ball bearing no 1206k , double row self -aligning ball bearing no 1209k , single row angular contact ball bearing no 7204 , single row radial ball bearing no 627 , single row radial ball bearing no.6020 , double row radial ball bearing no.4204 , single row angular contact ball bearing no 7202 , single row angular contact ball bearing no.7211 , single row cylindrical roller bearing no.nu 2205 , single row tapered roller bearing no 32206 , single row cylindrical roller bearing no. nj-205 ) /bid number : gem/2025/b/6736082 * /dated: 06-10-2025 & & / bid document 1 / 34

CTN :43326998 Due date: 06 Jan, 202606 Jan, 2026 7.58 Lacs
Tender For supply of spares of single screw pumps installed at etp and pt plant unit 3 and 4, ctpp, chhabra - pump casing , bearing housing , stuffing box housing , gland , hammer bolt , hex. nut , packing ring , discharge branch , helical rotor , joint shaft , drive shaft , distance bush , tension rod , stator , gasket , radial ball bearing , radial ball bearing , supporting ring , circlip for bore , circlip for shaft , radial shaft seal ring , stud bolt , hexagon nut , spring ring , hexagon nut , spring ring , screw plug , joint ring , key for coupling , identification plate , indication plate , direction of rotation , indicator , self tapping screw , self tapping screw , pump foot , grub screw , cardon joint assembly , each assy. consisting of: , joint protection sleeve , joint pin , universal joint bush , protecting bellow , circlip for shaft , joint pulley , lock washer , zyko-sleeve , locking sleeve , joint head , 'o' ring , 'o' ring , taper pin

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

Central Government/Public Sector

CTN :43322058 Due date: 03 Jan, 202603 Jan, 2026 NA
Tender For supply of balance drum : : - 655055700149 balance drum 887896s for dft plant , 655055700166 throttle bush 8808681 - dft plant , 666129005001 bush under brg-thrusr , 666129005002 bush under brg-radial , 666129005011 sleeve under intrmdiate brg bush , 666129005021 bearing housing , 666129005031 o-ring casing , 666129005032 o-ring seal housing , 666129005033 o-ring bush thrust rad , 666129005034 o-ring balance drum , 666129005035 balancing drum bush , 666129005036 air breather , 666129005037 o-ring , 666129005039 impeller key , 666129005040 suction impeller key , 666129005041 stage impeller , 666129005042 suction impeller , 666129005043 intrmediate brg bush-peek

Central Government / Public Sector

CTN :43322435 Due date: 14 Jan, 202614 Jan, 2026 NA
Tender For supply of m6305250276 bottom bearing f4b-scm-207 , m6305250277 top bearing f4b-e-207r , m6305250290 bottom bearing f4b-scm-203 , m6305250291 top bearing f4b-e-203r , m5501130003 thrust bearing 7313bdbc3 pn-10b , m5501130002 radial bearing 6215c3 pn-10a , m5512500003bearing 7309 b-ecbj pn-320.02 , m5512500004 bearing nu211 ecjc3 pn-322.01 , m5511830085 bearing 7224 b-ecbj pn-320.02 , m5511830086 bearing nu324 ecjc3 pn-322.01 , m5511830041 bearing 7224 becbj pn-320.02 , m5511830042bearing nu324 ecjc3 pn-322.01 , m5512480005 bearing 7309b-ecbj pn-320.01 , m5512480006 bearing nu310ecjc3 pn-322.07 , m5505180018 ball bearing 6213 pn-056-2 , m5505180017 ball bearing 7312bdb pn-056-1 , m5513550009 bearing 7311b-e-cbj pn-320.01 , m5513550010 bearing nu311 ecj c3 pn-322 , m5515060024 ball bearing 6309 2rs1 c3 , m5511340009 bearing 6220 pn 26000 , m5511340010 brg 7220 pn-26300 , m5519390005 thrust bearing 7310becbj pn-320.02 , m5519390004 roller bearing nu310ecj pn- 320.01 , m5511490051 bearing 7315 b-ecbj pn-320.02 , m5511490052 bearing nu316 ecjc3 pn-322.01 , m4403210001 bearing 6020rs1 , m5514560013 bearing qj312fa pn-320 , m5511300014 bearing 7309 pn-26300 , m5511300015bearing nu309 pn-26400 , m4402110044 bearing 6318 , m5523430015 bearing 6308 pn-2600 , m5620100086 oil seal cr 38646 id fan clutch , m4407050002 bearing ball ang cont 7221 becbm

CTN :43305625 Due date: 02 Jan, 202602 Jan, 2026 NA
Tender For supply of radial ball bearing brg. no. 6202 2z size: 15/35 x 11
 Loading, Please wait...

Connect us via What's Up