Web Analytics Made Easy - StatCounter

Magnetic Brake Tenders

Get complete information related to latest Magnetic Brake Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Magnetic Brake Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Magnetic Brake Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :43343208 Due date: 06 Jan, 202606 Jan, 2026 2.00 Lacs
Tender For tender for supply of mt spares d d - carpet floor tunnel rear , carpet center floor lh , carpet floor tunnel front , towing steel cable , direction lamp , tow bar motor vehicle , speedo cable 3.2 dia 4300 , cartridge lub oil filter

corporations/Associations/Others

CTN :43287647 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

corporations/Associations/Others

CTN :43287648 Due date: 05 Jan, 202605 Jan, 2026 NA
Tender For ttps operation circle mpm i unit i complete dismantling of mill 2f and reassembling the dismantled spares in mill 1c - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin

CTN :43306671 Due date: 02 Jan, 202602 Jan, 2026 NA
Tender For repair to vehicle eicher ba no 11d 186709e ml complete cylinder head repair and overhauling as given in sl no 1 of specification document , ml for opening the existing alternator from the vehicle as given in sl no 2 of specification documents , taking down and removing old battery from vehicle carefully as given in sl no 3 of specification document , repair replacement of seat cover of best quality as given in sl no 4 of secification document , taking vehicle eicher to workshop for rectifying as given in sl no 5 of specification document , ml for alignment and wheel balancing of the vehicle as given in sl no 6 of specification document , supply and replace the defective spares in self motor as given in sl no 7 of specification document , complete gear box taken from the vehicle and opening as given in sl no 8 of specification document , ml for taking down the diesel tank and fuel pipes as given in sl no 9 of specification document

CTN :43306684 Due date: 02 Jan, 202602 Jan, 2026 NA
Tender For supply of labour charges for opening dismantling taking down under mentioned spares parts assemblies in replacement and complete testing , engine oil , oil filter , replacement of side glass , brake shoe kit , replacement of air filter , replacement of indicator light bulb , replacement of break leather shoe , tail light cover , self starter motor , replacement of seat cover , clutch cable , complete greasing and washing the vehicle

CTN :43247252 Due date: 29 Dec, 202529 Dec, 2025 NA
Tender For supply of mt spares d d - assy canopy , material tube repair hot seal patch , assy fuel heater , wiper motor 24v 17w 2 speed , pump assy fuel , field coil assy , air filter element primary , injector for 135 kw bs-iii vp 37 , wiper blades , 17w hi power wiper motor , body assy throttle , pump water , tommy bar complete , assy tail lamp lh , head lamp rh , door lock assy rh , cartridge lub oil filter , wabco clutch booster alternate f-5p00500 , head fuel filter bottom , blade wind shield wiper , head lamp lh , wheel scotches , glass laminated , combined stop tail lamp , regulator vehicle window , assy rear view mirror outer rh , wind screen glass rh , assy of proximity mirror , horn assy high tone , slave cyl clutch , fuel water seprator , ring spanner 14x15 metric , sa of fly wheel , flasher 24v , assy outer handle rh , hose x-7445200 4720-014152 , speedo cable jis 4300 lg , front direction indicator rh , side repeater lamp , convoy lamp , assy release cable comp centre flap , parking light bulb for head lamp 24v-4w , reverse light switch , fog lamp with bulb 24v 60w yellow lens , parking light bulb 5w , cylinder assy master with booster , bulb for above 24v 21w bai 5s , belt v , lamp 24v 21wd 24 1 t529201 , cabin light , regulator assy rh
 Loading, Please wait...

Connect us via What's Up