Tender For annual rate contract of refilling oxygen and dissolved acetylene cylinder annual rate contract of refilling oxygen and dissolved acetylene cylinder
Tender For supply of control unit assy., part no.se57110 , cable assy. main, part no.im7se57506 , sensor cable assy 70 ft., part no.im7se536951 , horn unit., part no.se57392 , refilling kit for automatic fire, part no.se57330 , nitrogen cylinder assembly 0.5 lit, part no.se57112 , nozzle conical, part no.se53508 , dust cap, part no.se53835 , teflon bush, part no.se543351 , sensor mounting clip, part no.se54462 , end of line resistor unit, part no.se53799 , cable assy. main, part no.se57570 , over ride unit, part no.se54453 , splicing connector, part no.se57539 , fuse 3a, part no.se53557 , sensor cable assy . 30ft , part no.se53729
Tender For supply of refilling of refrigerant gas r-407c. critical temperature: 122.5 degree celsius, boiling point : -11.97 degree celsius, melting point: -199 degree celsius, specific gravity: 1.34 at 30degree celsius, critical density : 0.56 g/cm3, physical state or form: gas vapour, purity : 99.5%, acidity: 0.0001% critical pressure : 3.613 mpa, relative vapour density : 4.7, safety class: a1, odourless, colourless, conforming to standard: i so: 9001, quantity in cylinder - 45 kgs. [ warranty period: 30 months after the date of delivery ]
Tender For refilling and hst of scba cylinder for fire dept - refilling and hst of scba cylinder , refilling and hst of scba cylinder , refilling and hst of scba cylinder , refilling and hst of scba cylinder , refilling and hst of scba cylinder
Tender For supply of refilling of empty fire extinguisher cylinder capacity 4 kg with clean gas agent-hfc236fa [ warranty period: 30 months after the date of delivery ]
Tender For providing of the refilling of fm-200 (hfc 227ea- weight: 90 kg) gas in installed fm 200 bottle onboard icgs c-404 to be carried out. scope of work includes following:- (i) emptying of cylinder and refilling of fm-200 gas, pressure testing of cylinder prior re-filling to be undertaken. (ii) dismandling/ installation and transporting of cylinder from icgs c-404 to your workshop. (iii) testing and issue of gas purity certificate and cylinder pressure testing certificate. (iv) offer inspection of filling to ship's representative. (v) all other in-way jobs included. (vi) job to be undertaken by oem (m/s solas marie) authorised service reps only. technical details: