Tender For supply of lot-1 tub coupling three link chain for mining application , lot-2 tub coupling pin for mining application , lot-3 tub coupling pin with trapezoidal block for mining application , lot-4 tub rubber buffer for mining application
Tender For supply of supply of mechanical spares d d--reflector,104949,car , supply of sick sensor - photosensor - wt24-2x400 , supply of sick sensor -bar code reader sonsor- wll24-2x430s01 , sprocket 14 teeth , sprocket 8 teeth , solenoid valve for filling scales, metalwork -701 , solenoid valve for panels gd pt, metal work-702 , sprocket teeth 14,cs,bore-65mm , gear 19 teeth -mild steel , gear 21 teeth-mild steel , gear 25 teeth-mild steel , gear 29 teeth-mild steel , shaft dia 40 length 380 , shaft dia 50by60 length 800 , shaft dia 60by60 length 800 , ntn bearing 212 , duplex chain,conveyor , chain lock , teflon roller , teflon roller with bearing for gd pt , lpg hose 1 m for filling gun - 1by2 inch , lpg hose 1 m for gas stop valve- 1by2 inch , lpg hose 1 m-1by2 inch , lpg hose 1.5 m - 1by2 inch , lpg hose 2 m- 1by2 inch , lpg hose 3 m- 1 inch , pillow block bearing 213 , spider 150 rathi make , bosch rexroth linear roller br , sealing unit -hot air sealing gun , hose for hot air gun 700 mm , hose for hot air gun, length - 2000 mm , hose for hot air gun, length -1500 mm , toggle joint for gd pt machine , l mount for cylinder , bearing 6206-2z skf , drag chain for booms , antenna sensor rod 300 mm , eye bolt for centering arm , pressure switch for filling gun , aluminium block , stabilizer for filling gun , hex connector for filling gun , l bend for filling gun , bottom block gd pt , u plate for gd pt , platform for gd pt center sec , flexible coupling , hammering cup , uhm pad for introduction , bearing skf 6301 , counter weight,chain conveyor , brass block , ms block , toggle joint rod , guide rod for introduction fo , guide rod ejection unit , clamping arm for gd machine , carousel adjustment bolt -stud type with nut , double stopper - straight type- one unit is 2 nos.- , double stopper - plate type- one unit is 2 nos. , ejection arm , ejection pusher arm , e- plate for booms , teflon pad for stopper 12 mm thick , upper plate for filling gun , t connector- mkii , spring for kosan make filling gun , wear strip 50by6 , magnetic sensors for introduction and ejection , keypad for kosan carousel-ss type , shaft 80by80by860mm , bearing 6024 zz-skf , bearing 6304-2z , display of gd pt filling machine mk4 , push button for filling machine //bid details 2 / 61
Tender For tender for supply of qlar make spare parts of gravimetric coal feeders d d - belt drive assy (without geared motor) , coc drive assy (without geared motor) , belt take up assy , coc take up assembly , weigh sensing assy (without loadcells) , roller weigh span assy , roller assy weigh span with cmmr , weldment weigh roller , inlet support roller group , drag link assembly - lh & rh , belt scrapper , feeder belt , coc chain assy , coupling for coc drive , dual magnetic sensor assy iec 132 , coal on belt switch assy , discharge paddle switch assy , speed sensor only for dual tacho , seal-oil for weigh span roller , seal-oil- take up assy , housing-belt take up , screw-take up , spring guide , spring , seal -take-up assembly coc , seal -take-up assembly coc , screw-take up for coc , drive block for coc take up , head pulley bushing , belt take up pulley bearing , weigh span roller bearing , inlet span roller bearing , chain take up bearing , coal on belt bearing , test weight group assembly-rh , test weight group assembly-lh , shaft & pinion weldmnt b.o.v , s13185-001 , roller group b.o.v 1000mm b14144-001 , roller group b.o.v 1000mm b14144-002 , gear reducer 6 ratio 1 assy(metric)-s16041-001 , end bearing gp b.o.v 1000mm ib14224-001 , belt drive motor , 5.5kw , coc drive motor , 0.37kw , belt motion monitor (zero speed sensor / switch)
Tender For supply of shaft with sleeve , shaft sleeve alone for blower , loose copper ring , stuffing box assembly , plummer block assembly , fan and motor coupling assembly
Tender For corrigendum : scope of work:1. insertion of log gate & screen removal & cleaning.2. preparation and fabrication of necessary arrangement for maintenance of back-up acw, fire hydrant /spray and raw water pumps.3. decoupling of pump and motor, removal of motor skirt and shifting of motor from skirt.4. dismantling of thrust bearing and bearing housing.5. dismantling of complete column pipes, enclosure pipe, shafts, impellers etc.6. complete dismantling of back-up acw, fire hydrant /spray and raw water pumps.7. issue and shifting of spares from store to the site.8. repairing and replacement of worn out parts and d.p. test of spare parts, impellers, shaft and sleeves, bearing housing etc.9. cleaning of all column pipes and enclosure pipe and painting with black paint.10. painting of top column pipe, motor skirt & motor with blue/smoke gray colors. painting of bearing cooling water line and discharge pipe of back-up acw, fire hydrant /spray and raw water pumps with green paints.11. assembly of pump as per oem guideline and shifting of motor on its skirt.12. alignment checking of pump and motor coupling.13. coupling of the pump after motor trial.14. removal of log gate after screen fixing. 15. commissioning of the pump & trail. terms and conditions: 1. the contractor shall have to arrange all men, machine, t&p, consumable, dp test kit including entire qty. of blue/green/ black bituminous paints of shalimar/berger/asian brand at their cost. 2. completion period: within 8 days for each pump from the date of handling over.3. payment terms: 100% payment shall be released after successful overhauling and commissioning of each pump, within 45 days.4. penalty terms: penalty shall be imposed @ rs. 1000/- per day or part thereof due to delay in work but limited to 10% of order value if delay in completing the work.5. mobilization period: firm has to mobilize his team & t&p for start of work within 7days after intimation from engineer-in-charge otherwise penalty @ rs. 500/- per day shall be imposed till start of work.6. guarantee: complete overhauling work is to be guaranteed for minimum 06 months against spurious paints and poor workmanship.7. the contractor will have to provide all necessary safety appliances to his workers engaged and he will be fully responsible for safety of his workers.8. contract period one year. scope of supply(a) cspgcl scope:1. spares of above pumps, fasteners will be provided by cspgcl kw.2. eot crane, compressed air, electricity, water will be provided by cspgcl free of charge.3. workshop facility shall be provided by cspgcl kw.(b) contractors scope:1. all men power, tools tackles, chain pulley block, measuring instrument, welding machine, cutting set, grinders consumable material rustolene, welding electrode, grinding stone, teflon tap, paints etc. shall be arranged by contractor.2. crane operator will be arranged by contractor. executive engineer (tmd-ii, bop) 1x500 mw, cspgcl, htps, kwb