Get complete information related to latest Ms Bolt Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Ms Bolt Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Ms Bolt Tenders.
Tender For manufacture and supply of m.s. bolts & nuts of size 25 x 90 mm as per rdso drawing n o. t-11504 with latest alterations as on date of tender opening, confirming to specification irs t-23: 2 021 corrigendum 5 of oct 87 with latest alterations, if any.(note:material should be delivered at sse/ p.waydepot/kzj/ scr) [ warranty period: 30 months after the date of delivery ]
Tender For supply of msbolts required for concentrator plant - m.s.full threaded bolt with nut as per nit , m.s.full threaded bolt with nut and one washer as per nit , ms hex head bolt full threaded with nut as per nit , ms hex head bolt cold forged bright finished, as per nit , ms hex head bolt and nut, full threaded as per nit , ms hex hd.bolt,nut, alongwith one washer as per nit , m.s. bolt with nut , alongwith two washer of thickness as per nit
Tender For supply of garari with 1 inch rod , pipe bearing 1 inch , ms square pipe 1 inch x 1 inch x 3mm , c channel 3 inch x 5mm , chain bullet , ms angles 1 inch x 3mm , ms angles 50x50x5mm , ms sheet 8 x 4 feet thickness 16 gauge , msbolt and nut dia 14 mm size 5 inch , universal joint , lamp , 3 hp single phase motor starter
Tender For set of additional clamps to secure the battery box cover of 3 phase locomotives as per els/l gd drg.no. c/els/lgd/ex.ftg/04/33. set consisting of 07 items as follows. 1) l clamps. qty/set. = 04 nos. 2) straight clamps. qty/set. = 04 nos. 3) distance bush. qty/set. = 04 nos. 4) msbolts m8 x 60. qty/set. = 04 nos. 5) ms nuts m8 size. qty/set. = 08 nos. 6) punched washers. qty/set. = 04 nos. 7) spring washers. qty/set. = 04 nos. note: 1) bolts, nuts should be of makes: tvs/unbrako/dfl/bmi/vif only with engravem ent on the bolts and nuts. 2) one sample set should be got approved before effecting bulk supply. [ warra nty period: 30 months after the date of delivery ]