Get complete information related to latest Platinum Foil Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Platinum Foil Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Platinum Foil Tenders.
Tender For year tender for water supply materials wtp fy 2025-26 - water body top sgn, heavy duty chain sgn, lower valve sgn, cylinder assembly (isi) sgn, baring skf made sgn, handle sgn, plunger road sgn, axle heavy duty (isi) sgn, packing insulation sheet sgn, packing rubber sheet sgn, foot valve leather sgn, torch shell sgn, torch everday made with 3 shell sgn, baring greese sgn, lead sgn, cement solvent sgn, nut bolt and washers of diff sizes sgn, pig lead per kg sgn, hempayarn per kg sgn, porcelin brake insulator sgn, meter board 300 x 4560 (t.w) sgn, capacitor per kvar sgn, starter point kit sgn, no volt coil sgn, rile 13-21 sgn, starr delta oil starter sgn, d.o.l. oil starter sgn, single phase preventer sgn, upper valve per each sgn, g i nut bolt per kg sgn, tang rubber leather washers per 25 sgn, upper valve leather wahers per 25 sgn, lower maket leather washers per 25 sgn, upper vql nut sgn, body head sgn, tongue washer heavy heavy duty sgn, cylinder check nut sgn, teng heavy duty sgn, body plate hweavy duty sgn, m-10 nut bolts sgn, m-12 nut bolts sgn, ring washer and lower valve waher sgn, cylinder dasher sgn, long body top sgn, cutlmer starter blade set sgn, fibre base sgn, rile 13x21 sgn, coal sgn, ltlk starter blade set sgn, cutlmer starter do2 sgn, l.t.l.k starter sa8d sgn, single phase l.t.l.k starter7.5 hp sgn, panel board box 18 inch x18 inch sgn, cable tyre finolex made heavy duty 6 sqmm sgn, cable tyre finolex made heavy duty 4 sqmm sgn, single phase / 2 1/2 inch hp sgn, complete panel box wiring including fixing of all electrical fixtures sgn, porcelin rail insulator sgn, fuse 64 and 32 sgn, fuse 63 and 32 sgn, rile 13x21 shigg, coal shigg, single phase submersible pumpset and electrical materials 2 hp sgn, hp 12.5 sgn, hp 10 sgn, hp preventor heavy duty 7.5 sgn, hp 18 stage 10 sgn, hp 7.5 stage 10 sgn, hp panel board starter box 5 sgn, hp 10 stage 18 sgn, hp 7.5 stage 12 sgn, stage 10 submersible motor 5 hp sgn, pvc copper wire 7/20 sgn, copper wire 3/20 sgn, g i wire 16 no sgn, g i wire 12 no sgn, switch indicator 6 amps sgn, transformer oil sgn, p.v.c. flexible pipe per motor 32mm sgn, p.v.c. bend per motor 32mm sgn, p.v.c. per motor 32mm sgn, alluminium wire per bundle 10mm sgn, m s plange 1 inch sgn, alluminium wire per bundle 6mm sgn, mcb 32a x 3 p.h sgn, t.v. board 250 x 300mm sgn, volt meterr 800 a sgn, volt meter 500 v sgn, v.i.c.t.p porcelin price unit 63a x 415 sgn, v.i.c.t.p porcelin price unit 32a x 415 sgn, v.i.c.t.p switch 16a x 415 sgn, v.i.c.t.p switch 32a x 415 sgn, wooden board for panel board 900 x 750 sgn, m.s box for panel board 900 x 750 sgn, gi pipe b per meter 32 mm sgn, collar r mark 32 mm sgn, gland rope 16 mm sgn, gland rope 12 mm sgn, gland rope 10 mm sgn, finolex made 12 gauge subemersible cable 6 sq mm sgn, finolex made 12 gauge subemersible cable 4 sq mm sgn, sgn 25 mm, sgn 18 mm, sgn 12 mm , gland packing 6 mm sgn, full treaded nit bolt 12x150 m.m.sgn, m s plange 6 inch sgn, m s plange 5 inch sgn, m s plange 4 inch sgn, m s plange 3 inch sgn, m s plange 2 1/2 inch sgn, m s plange 2 inch sgn, m s plange 1 1/2 inch sgn, m s plange 1 1/4 inch sgn, m s plange 3/4 sgn, m s plange 1/2 sgn, ci non return valve kartar made 6 inch sgn, ci non return valve kartar made 5 inch sgn, ci non return valve kartar made 4 inch sgn, ci non return valve kartar made 3 inch sgn, ci non return valve kartar made 2 1/2 inch sgn, ci non return valve kartar made 2 inch sgn, ci non return valve kartar made 1 1/2 inch sgn, ci non return valve kartar made 1 1/4 inch sgn, ci non return valve kartar made 1 inch sgn, ci non return valve kartar made 3/4 sgn, ci non return valve kartar made 1/2 sgn, ci non return valve kirloskar made 6 inch sgn, ci non return valve kirloskar made 5 inch sgn, ci non return valve kirloskar made 4 inch sgn, ci non return valve kirloskar made 3 inch sgn, ci non return valve kirloskar made 2 1/2 inch sgn, ci non return valve kirloskar made 2 inch sgn, ci non return valve kirloskar made 1 1/2
Tender For corrigendum : supply of one rake set of automatic sliding door for trainset coaches to drg.no. trai n18/mc/ac-5-6-001, alt- d, train18/mc/ac-5-6-002, alt- a.(lh=30 nos,rh =2 nos) and specificati on icf/md/spec-363, issue status-01, rev-01. note for spare: one spare set of following ite ms per rake set of purchase order to be supplied in separate packing with marking as sp ares. 1) dcu - 4 nos. 2) door leaf - 4 nos. [ warranty period: 42 months after the date of delivery ]
Tender For lwlrrm shell kit (a) lwlrrm - roof, sidewall and end wall one coach set of roof, 2 mm side wall and end wall for lwlrrm coaches with noise reduction feature 1) roof c omplete to drg. no. 53816018, alt 'c' - 1 no 2) final roof element to drg. no. 83416016, alt ' a'-1 no 3) roof end part complete to drg. no.83416017, alt 'a' -1 no 4) end roof assy to drg no. 58116066, alt 'g' - 1 no, 5) ss trough arrangement to drg no. 53816023 alt 'a'- 1 no 6) side wall right complete to drg. no. lp14110, alt a anx. 6 -1 no 7) side wall left complete to drg.n o. lp14111, alt a anx.6 -1 no 8) sidewall npp-end right complete to drg.no.1.10113.0.20.110. 004, alt b anx.3 -1 no 9) side wall coach end complete to drg.no. 1.10113.0.20.110.003, alt b anx.4 -1 no 10) side wall pp end left cpl to drg.no. 1.10113.0.20.110.005, alt nil anx.3 -1 n o 11) side wall pp end right cpl to drg .no. 1.11012.0.20.110.003, alt nil anx.3 -1 no 12) end wall complete for lhb power car to drg. no. 1.11012.0.20.120.003, alt a anx.9 - 1 no with l atest detail drgs 1.11012.0.20.120.004-alt b anx-4 and mi007721_a_anx-2 13)end wall compl ete for lhb power car to drg. no. lp15103, alt nil anx-2 -1no 14) door cut out to drawin g no. lr10295-1 no & lr10296, alt a-1 no, 72914089, alt c- 1 no, 729 14 091, alt c- 1 no, 15) car l ine nos 1.11012.0.20.110.007, alt r - 1 no and 1.11012.0.20.110.008, alt r - 1 no. the end wall sha ll be assembled with cover sheet and shutter complete to item no.1 & 2 of drg.no.3.1011 3.0.20.120.183, br and item 6,7,8,10,12 of drg.no.2.10113.0.76.300.002, alt c and tail lamp br acket to drg no.2.10113.0.10.300.001. the firm shall fulfill the requirement as per.icf/md/ specn.200, issue status-01, rev-04 with amendment no-01. for end wall the firm shall fulf il the requirement as per icf/md/spec-315,issue status-01, rev.00. firm has to supply roof and sidewall without applying etch primer and the firm has to apply etch primer on roof and sidewall in icf after shell assembly. (b) body shell items & partitions for lwlrrm shell kit supply and insta llation of body shell items and partition frames for lwlrrm coaches to drg. no. 1) aaa1 0488, alt. c- 2 nos (rain water gutter) 2) 2 11012.0.20.110.100, alt.nil-2 nos.(rain water gutter) 3) lp 10107, alt. nil - 2 nos,(sheeting) 4) lp10136, alt d anx-4 -1no. (welding parts car body) 5) lp10125 alt b anx-10, item-33 - 14 nos.(ledge) 6) lp10108, alt a anx-1- 8 nos.(duct assy) 7) aaa10278, alt . nil-4 nos.(hand hold arrangement) 8) 1.11012.0.03.095.001 alt a -1 no (w/p in u/f incl. 53810070 & 53810035) 9) lp10139, anx-5 - 1 no (partition frames) the above items to be supplied as set and install the same at the body shell assembly stage to assembly drg.no. lp10125, alt b anx -10 (c) under frame arrangement -613-lp11103 alt 'd' anx-7 the manufacturing facility as pe r icf/md/spec-147, issue status-01 rev.02 with amendment no.01 special condition : a) -packin g as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1867, alt. 'nil' -packin g as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk-1865, alt "a". installa tion required as per assy.drg.& annexure-a, dtd 13-09-2023 to be followed. supply rates a nd installation rates to be quoted separately. c)packing condition as per drg.no.icf/j&t /misc-2487, alt 'b' the underframe should be supplied as normal side up and side bearer s ide down. [safety item ]
Tender For supply of set of harness, cable management system and accessories for lhb eog gs co aches as per the following drawings. icf specification icf/elec/968 shall be followed for preparation an d supply of this cable harness. 1) harness of under frame arrangement to (a) cable harness to drg no. lgs/ay/bw 70002 alt-b-1 set (b) cable management system and accessories to drg no. lgs/eog 710 01 col-ii altf -1 set 2) harness of roof arrangement to (a) cable harness to drg no. lgs/eog 70005 al t-d and lgs/eog 70008 alt-a-1 set in assembled condition. (b) cable management system and access ories to drg no. lgs/eog 76001 col-ii altj - 1 set and drg no. ls/ay/bw 74001 col-iv alt-c -1 set not e: packing instruction: pi141 ver-3.0 [ warranty period: 30 months after the date of delivery ]
Tender For lws pp-2 shell kit (a) one coach set of roof, sidewall and end wall for amrit bharat l ws/pp2 (754) 1. roof assembly to drg no 75416001, alt nil- 1 no, 2. end roof assembly to drg no 9721 6008, alt 'a'- 2 nos 3. side wall to drg no 75414001,alt 'a'- 1 no welding pin arrangement to drg no 58 110037 alt 'nil' has to be assembled on roof and sidewall while supplying. 4. end wall to drg no 75415 001, alt 'b'- 2 nos the firm shall fulfil the requirement as per icf//md/specn.200, issue status01, re v 04 with amendment no 01. the firm shall fulfil the requirement as per icf/md/spec-315,i ssue status-01,rev.00 firm has to supply roof and sidewall without applying etch primer and the fir m has to apply etch primer on roof and sidewall in icf after shell assembly. (b) one coach set of bo dy shell items and partition frames for lws/pp2 (754) coaches to drg nos, 1. 75410041, alt ni l - 1 no 2. 75410002, alt 'b' - 1 no 3. 75410006, alt nil - 2 nos 4. 58110054, alt 'e' - 1 no 5. 67010011, alt 'a' - 2 nos 6. aaa10488, alt 'c' - 6 nos 7. 58110017, alt 'b' - 2 nos 8. aab10338, alt nil - 24 nos 9. a ai10188, alt nil - 4 nos (c) under frame arrangement to drg no. lws pp 67011001, alt 'l'. specia l condition : a) -packing as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1 867, alt. 'nil' -packing as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk- 1865, alt "a". c)packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe sh ould be supplied as normal side up and side bearer side down. [safety item ]
Tender For supply of set of glass assembly and lock for body side window for lhb non ac coaches, suitable hole s to be provided on glass for fitment of lock as per lj54124 alt a, lock with handle to be supplied loose. rc f drawing nolj54124,alt a, item no 5 &6. material & specification (i) transparent, toughened glass of thick ness 5 mm (ii) suitable packing should be provided to arrest water/air leakage (iii) all sharp edges/corners shall be rounded off (iv) higher durability (v) window sliding force 4+/-2 kgf. [ warranty period: 30 mont hs after the date of delivery ]
Tender For intergrated wtcc with end assly for lhb non ac coaches., as per drawing: lg 10180 except item no. 1 alt. 'k', packing instruction: 1. the supplier shall pack the integrate d wtcc in a suitably designed returnable fixture in such a way that integrated wtcc s hall not get scratched, damaged, twisted during transportation, storage and lifting and to avoid scratches on outer surface. it should be wrapped with enviroment friend ly material and it should have standard clamping /fastening mechanism so that it can b e opened easily. it should have firm's identification mark. 2. first returanable fixture al ong with integrated wtcc be retained by rcf & this fixture shall be exchanged in the se cond lot supply and so on. at the end of the contact, the firm shall collect the remain ing returnable packing fixture from rcf. 3. the packing fixture/frame to be fabricated having sufficient strenght to bear approximate 1 tonne load in static & moving conditi on of two coach set of integrated wtcc. 4. the fixture /frame/pallet should be designe d so that the packed wtcc remain preferably in horizontal position to minimize surface area. 5. it should also be suitable for storage of integrated wtcc under open sky. [ wa rranty period: 30 months after the date of delivery ]
Tender For supply of set of bracket & channel of lhb power car coaches, as per drawing: mplsmlp c version 1, packing instruction: no special packing required. the protruding, threaded po rtion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier . [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of fan bracket for amrit bharat non ac pantry car coaches. note:-firm shall collect all latest/final drawings before manufacturing. there may be minor mod ification in design to suit railway requirement & modification to be carried out by firm at no further cost to railway., as per drawing: mp24fanbkt version 1, packing instruction: n o special packing required. the protruding, threaded portion, gauges and loose items e tc. if any are to be protected with suitable covering to prevent it from damage. howev er transit damage if any shall be at the cost of supplier. [ warranty period: 30 months aft er the date of delivery ]
Tender For corrigendum : supply of body side sliding door (set consists of door leaf rh & lh 01 no each as per drg). (note : list of accessories of sliding doors for memu coaches to be procureed without paint/pri mer as per annexture-a by dy cple-iii letter no-rcf-plg/mpsh/mp510003 dated 10/07/2024.) , as per drawing: dmu/tc/v/ss-5-8-001 alt 'c' col i, packing instruction: mounting of sliding door f or memu coaches should be packed with bubble sheet all around with proper tapping a nd stacked in vertical position on returnable pallets . pallets should containing maxi mum 6 nos per pallet and suitable protection should be provided at wheels & sliding g uide . pallets should be painted and have firm's logo for identification the firm will co llect empty pallets only after mounting of sliding door is unloaded in the coach. pallet should have provision so that it can be transported with the help of fork lifter . [ warranty period: 30 months after the date of delivery ]