Tender For connectivity of chopan end of ir chunar yard with up main line of dfccil, including elimination of level crossing gate lc-122a and provision of dual detection at new dagmagpur yard of dfccil under jurisdiction of cgm/ddu unit.
Tender For construction/repair of interlocking road and rcc drain in ward no 9 new bus stop parisar and near tvs agency crossingand ward 6 near durgesh house road and drain ward 9 np khaga office gate cc road repair near nahar puliya road repair both sid
Tender For (i)construction of rcc oh tank(1 lakh litre) for augmentation of water supply at track machine satellite depot and laying of di pipeline of length 250 metre.(ii)renovation of railway institute at kharun rail vihar colony.(iii)improvement of road surface, fencing, height gauge, gate goomty and toilets etc at level crossing under jurisdiction of den/iii/r.
Tender For asansol division: shifting of gate lodge by construction of new gate lodge to avoid sod infringement including replacement of old, dilapidated gate lodge along with improvement of level crossing road surface in stn-jaj main line mdp-grd & jsme-bdme branch line.
Tender For electrical work for temporary three phase, 10 kw electric connection in favour of m/s reliance jio infocomm limited near no.3 level crossing puri gate, kamakhya mandir for tele-communication tower (1-wb-kgpr-enb-008).
Tender For corrigendum : construction of bituminous road from ash gate of stps to poradih intersection andrepairing and maintenance of existing plant peripheral road up to railway level crossing
Tender For tender for (i) raising & extension of platform for 24 coaches at chhappra kacheri and gopalganj. (ii) civil work related to interlocking of level crossing gates having more than 50000 tvu in varanasi division with rtu & power supply arrangement (lc gate-35 spl between chhappra kacheri - thawe and lc gate - 64 spl between kaptanganj - thawe. (total = 02 nos lc)
Tender For corrigendum : supply of level crossing gate safety chain two boards rings provided at both end, dia of ring 08 mm. [ warranty period: 30 months after the date of delivery ] ]