Tender For corrigendum : supply of product - wooden wardrobe , single bed with box , single bed mattress , open over head storage , study table , chair for study table , stainless steel dustbin , bed side table , double bed with box , double bed mattress , tv unit , main table with side unit , high back chair , mid back chair , two seater sofa , center table , almirah with glass shutter , 4 seater dining table , 6 seater dining table , dining chair , work table , high back chair 2 , mid back chair 2 , demnostration chair with tablet , three seater waiting chair , workstation for laboratory , visitor chair with armrest , open steel rack , 4 drawer personal locker , cabin table 2
Tender For procurement, installation and maintenance of language lab work - wired headphone with mic and usb: (sennheiser pc 8.2 bose/ sony or similar) 2-year comprehensive warranty or as per oem terms (whichever is higher), software offering features like audio/video labs, pronunciation tools, cefr-aligned courseware and exercises for improving listening, speaking, reading, and writing (lswr) skills for english and other languages. (orell talk core version, lanquill, digital teacher/english lab, sanako study, digital teacher (dt-dell), talk right, smartlab) requirement: 1 teacher plus upto 20 students with 500 user id, with onsite software installation on pcs, implementation, training and support 3 year amc and content updates for the software.
Tender For sc division: technical consultant for feasibility study, master planning, urban designing, engineering & preparation of technical feasibility report (tfr), detailed estimate (de), along with boq tender schedule (ts) for work planned for re-development of sanathnagar station of secunderabad division.(rate included 18% gst)
Tender For sc division: technical consultant for feasibility study, master planning, urban designing, engineering & preparation of technical feasibility report (tfr), detailed estimate (de), along with boq tender schedule (ts) for work planned for re-development of begumpet(2nd entry) station of secunderabad division. (rate is inclusive of 18% gst)
Tender For sc division: technical consultant for feasibility study, master planning, urban designing, engineering & preparation of technical feasibility report (tfr), detailed estimate (de), along with boq tender schedule (ts) for work planned for re-development of sirpurkagaznagar (both entry) station of secunderabad division.(rate in including 18% gst)
Tender For corrigendum : hiring of agency / resource personal to conduct site-level needs assessment study to identify on-the-job skills training and capacity building, facilities to be provided for informal women workers working on various site of work and carrying out of t
Tender For supply of 2 door almirah , 3 door almirah , 2 door wardrobe almirah , high back chair , conference chair , conference table , king bed , mattress single bed , mattress king bed , pillow , shoe cabinet , single bed , sofa 1-seater , sofa 2-seater , sofa 3-seater , storage unit , study chair , study table , tepoy- center table , tv media unit , visitor chair , back unit storage , main table , wall mounted storage main unit , wall mounted storage additional unit , storage add on , storage main , visitor chairs , high back chair leather , computer table , waiting lounge chair steel , work station chair , computer table without cpu hanger , computer table with cpu hanger , almirah with laminate top , high end sofa 3-seater , high end sofa 1-seater , reception table , stool , canteen table , cafe chairs , workstation , two-tier bunk beds , nursing table , wheelchairs , stretchers , storage racks
Tender For a)retrofit/up gradation of existing schneider make plc and scada/hmi systems installed at rtps-unit 8 dpmrhs.b)the bidder/agency shall be required to supply the materials as per the technical specifications and quantity mentioned under the head of technical specifications.c)the bidder/agency shall be required to install and commission the supplied materials in the existing plc control cubicle itself by retaining existing ipr(interposing relays),mcbs and tbs.d)the bidder/agency shall be required study the existing software/logics incorporated in the plc/scada system, further to carryout re-engineering works, software/logics development based on customer/site requirement and also for the assessment of additional accessories required to complete the retrofit/upgradation works in complete manner.e)it is the single point responsibility of the bidder/agency to carry out the works in the stipulated time period.f)providing required power supply will be under the scope of kpcl itself.g)t&p and any other consumable materials required for the work will be under the scope of agency/contractor only.h)before quoting the bid, it is compulsion to visit the site for the assessment and studying the site/customer requirement.i)storage of materials while executing works is single point responsibility of contractor/agency scope itself.j)the agency shall be required to handover as built drawings and software backup cds (os,application and system software) along with o&m manuals 04 sets.k)materials supply shall be completed in all respect within the stipulated period as per the contract. materials shall be delivered to rtps site through ee(stores)o&m. unloading of materials at rtps site location and shifting of the same to work location is under the contractor/agency scope only.l)handling, shifting, unpacking and erection and commissioning of the entire system shall be under the scope of bidder itself.m)all required consumables, hardware and licenced software, accessories and any other materials which are not included in the scope and required for successful installation and commissioning of the retrofit/up gradation of existing dpmrhs plc system of rtps unit-8 to latest version will be under the contractor/agency itself.n)all the materials required for the installation and commissioning of up gradation of existing dpmrhs plc system of rtps unit-8 to latest version shall be made as detailed under the technical specifications and shall be installed and commissioned as per the scope of work.o)warranty-all the materials and other equipment covered under supply portion shall cover a warranty for a period of 12 months from the date of commissioning or 18 months from the date of supply.warranty-all the materials and other equipment covered under supply portion shall cover a warranty for a period of 12 months from the date of commissioning or 18 months from the date of supply. any faulty items/spares observed during this period shall be replaced at free of cost.