Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - hydro electric power house; rebabbating of inner shell of turbine guide bearing and thrust bearing 165 mw dehar machines at dph slapper; as per scope of work
Tender For mtps i tm unit ii removal and re insulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Tender For work of online/offline cleaning/filtration of frf oil used in turbine governing hpsu and lpbp system hpsu of unit no. 3&4 at sikka tps on as and when required basis.
Tender For corrigendum : providing of operation and maintenance power house / powerplant - annual maintenance of 200mw hydrogenating unit as per part a item no 1 of boq and scope of work enclosed with bid document qty for 04 nos unit,operation and maintenance power house / powerplant - non destructive test of runner through level ii qualifier and repair of runner as per part a item no 2 of boq and scope of work enclosed with bid document qty for 04 nos unit,operation and maintenance power house / powerplant - replacement of nozzle including testing of spare nozzle its shifting installation and testing etc as per requirement as per part a item no 3 of boq and scope of work enclosed with bid document qty..,operation and maintenance power house / powerplant - correction in rotor level and unit alignment of 200mw pelton turbine if required as per part b item no 1 of boq and scope of work enclosed with bid document qty for 04 nos unit,operation and maintenance power house / powerplant - dynamic balancing of the unit of 200mw pelton turbine after
Tender For corrigendum : survey, investigation, design, supply, erection, testing and commissioning of tank filling scheme for filling 32numbers of mi/zp tanks of gudavi(head works consisting of construction of barrage, in take trough with forebay, jack well cum pump house, vertical turbine pumps coupled to motors, pump house electrical works, necessary valves, delivery pipe, manifold system, electrical panel, soft strater, capacitors, 11kv transformer, 11/0.433 kv sub station, 11 kv power line and 11 kv terminal bay, rising main, pressure distribution) in soraba taluk by lifting water from varada river near gudavi village including operation & maintenance for a period of five years after successful commissioning of the work for gudavi tank filling scheme works on turnkey basis