Web Analytics Made Easy - StatCounter

Power Protection System Tenders

Get complete information related to latest Power Protection System Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Power Protection System Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Power Protection System Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38600858 Due date: 26 Dec, 202426 Dec, 2024 NA
Tender For providing of repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit; specialized services for troubleshooting maintenance of ghh turbine compressor as per sow and quantum of job on proprietary basis; service provider

State Government

CTN :38373215 Due date: 19 Dec, 202419 Dec, 2024 1.09 Lacs
Tender For scope of workscope of work: - (at firms workshop):-1. dismantling of pump and internal checking of pump to analyse the defects.2. checking of impeller, cleaning of impeller and other internal parts.3. checking of stator and rotor can, replacement of ss seamless cans.4. proper fitting of impeller and balancing of impeller.5. checking of stator and rotor windings, rewinding of the same as per requirement.6. checking of bearing, voltage coils, rewinding of coils with class #h# insulation.7. replacement of defective internal parts, components, such as bearings, sleeves, washers, etc.8. testing of motor pump and painting of the body.9. successful trial of pump.10. material & service guarantee shall be applicable for 12 months from the o/h of pump.11. rewound stator shall be tested for winding resistance and compared with original.12. winding resistance of individual phase should not have more than 2% deviation to other phases.13. ir value of motor shall be recorded, before and after completion. complete test report with type of instrument used to be submitted at the time of handing over of the motor.14. motor assembly should be carried out by contractor so that no any damage to overhang portion of winding happen otherwise contractor shall be responsible and will have to repair again.terms and conditions: -1. all man power, t&p, consumables etc. shall be arranged by the firm.2. the firm have to make his own arrangement for transportation of defective pumps from the site to firm's workshop. similarly, the repaired pumps shall be delivered to our site.3. completion period: 5 days for to and fro transportation and 10 days for repairing work. total 15 days.4. payment term: 100 % payment shall be made within 45 days after completion of work satisfactorily on actual work done basis.5. contractual period: 18 months.6. the firm shall submit the gst invoice for payment of service through ra bill. however, release of bills of work as well as supply, the repaired / serviced pumps shall be run on trial for at least 01 hours continuously.7. penalty: penalty will be imposed @rs.1000/-per day or part thereof due to delay in work but limit to 10 % of order value if delay in completing the work.8. in the case of work at site/ plant premises.9. all safety precautions & safety rules shall be followed by the contractor, also necessary safety appliances like gloves, masks, helmet, shoes etc. shall be available to their labour during execution of work.10. if any labour of contractor meets with an accident because of not using the safety appliances, in such cases, if any fine/penalty is imposed on the occupier/factory manager of the power station, than the payment of amount of such fine/penalty or all legal compliance shall be meet out by the contractor.se (turbine)1x500 mw, cspgcl, kwb
 Loading, Please wait...

Connect us via What's Up