Get complete information related to latest Preheater Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Preheater Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Preheater Tenders.
Tender For corrigendum : providing of custom bid for services - consultancy services for supervision of overhauling works of air preheater during overhauling of unit 7
Tender For corrigendum : supply of steam coil air preheater raigarh1 , steam coil air preheater raigarh2 , steam coil air preheater raipur1 , steam coil air preheater raipur2
Tender For supply of - ntpc rihand trunion shaft for aph, bhel make boiler,oem / parts part name : guide trunion shaftassembly drawing & position number : 0-52-261-01030 equipment manufacturer : bhel sub assembly :guide bearing assembly equipment name : primaryair preheater equipment model : 27.5 vim 2150additional information : 500 mw boiler uom set ref :trunnion shaft and accessories as per description
Tender For corrigendum : procurement for spare parts of 32.5 vimt 2000(72xpa) bhel make air preheater installed in phase-i at 2x600mw sstpp, mppgcl, dongalia
Tender For custom bid for services - sludge and insulation removal of tank 120 t 05a-1.1. sludge removal: the approximate sludge / oil inside the tank is to a tune of 2800 cu.m. a) agency needs to assess the quantity of sludge through site visit prior to quoting. b) the quantity provided is the best estimate and may vary. please note that additional payments will not be made for excess sludge removed, and no deductions will occur in the event of lesser sludge quantities with respect to the sludge quantity mentioned above. c) approach path from south main road (i.e., from south of the common dyke of tanks 120-t05a,05b,06,06b) up to south west of tank 120-t-05a shall be provided by hpcl. d) however, approaches / access requirement around the circumference of the tank to facilitate sludge removal and insulation removal, the preparation of the same shall be in within agency scope. e) agency has to collect sludge using sludge bins at outside of clean out door. if required, excavation for placing sludge bins matching the elevation of the clean out door has to be done by agency. sludge bins to be mobilized by the agency. f) disconnecting existing electrical connection, temporary dismantling of platform, ladder or any other structural, fire protection system like cooling water connection, foam connection, removal of existing instruments and any other removable or fixed attachment required for isolating the tank is in agency scope. g) removal of existing instruments, accessories etc. provided in existing tanks and preserve the same in designated area as per instruction of job engineer is in agency scope. h) removal of sludge from tank, transfer of sludge to designated area, unloading / dumping of sludge in designated area (sludge lagoons) inside refinery, complete cleaning of the tank after sludge removal, making the tank hydrocarbon free and suitable for further hot work is in agency s scope. contractor to submit sludge removal procedure to hpcl. i) opening / cutting shell course (coupon cutting) for creating access for entry of excavator / jcb inside the tank for carrying out sludge removal. barricading inside tank in coupon cutting area for hot work preparation for coupon cutting is in agency scope. any other preparatory jobs as per jsa for carrying out hot work for coupon cutting and vehicle entry inside tank is in agency scope. j) existing steam coil: agency shall dismantle existing steam coil including supports from the existing bottom plate. k) sacony & propeller mixers: agency shall dismantle existing sacony mixers & propeller mixers. l) wherever existing internals are removed like sacony mixers / eductors / propeller mixers / jet mixers / heating coils etc., care shall be taken not to damage the bottom plate during removal of supports. m) all necessary work related to isolation of tanks to carry out sludge removal including removal of piping spools including tagging and dumping in the designated yard, blinding of nozzles, proper barricading required shall be in contractor s scope and shall be carried out as per instructions of job engineer. n) transportation and dumping of all scrap materials generated during modification works, after cleaning, in the designated scrap yard as per instruction of the job engineer. o) arranging of all equipment, tools & tackles, machinery, lifting equipment, mobile crane, fork lift, crane, jcb, tipper, trailer, scaffolding etc. is in the scope of the agency.-msme exemption - no | startup exemption - no
Tender For service contract for overhauling of rotary air preheater, coal and oil burners, ccp, sadc and windbox of unit5 (250mw) tentatively in jan-2026 under bmd, stps