Tender For providing of custom bid for services - carrying out cips survey for iccp pipelines as per scope of work sow special conditions of contract scc,custom bid for services - carrying out cat survey as per scope of work sow special conditions of contract scc for piggable pipelines at every 50m interval with field data analysis at every 500meter interval by plotting pipeline map current vs dista..,custom bid for services - carrying out cat survey as per scope of work sow special conditions of contract scc for unpiggable pipelines at every 10m interval with field data analysis at every 500meter interval by plotting pipeline map current vs di..,custom bid for services - carrying out dcvgacvg survey at identified locations as per scope of work sow special conditions of contract scc for piggable pipelines by digital recordable and integrated gps dcvg acvg equipment,custom bid for services - carrying out dcvgacvg survey as per scope of work sow special conditions of contract scc for un piggable pipelines at every 1 meter by
Tender For upgradation of emrs at sailana district ratlam (mp). construction of 4 nos. t-ii quarters (gf and ff), 2 nos. t-iii quarters (gf), 1 no. principal quarters (gf), 2 nos. warden office (gf) and under ground sump with pumproom.sh:- soil investigation and submission of report showing safe bearing capacity and all soil layer data etc. and digital survey work.
Tender For corrigendum : providing of custom bid for services - mrcc24h009 agency for carrying out illumination study at iocl mathura refinery-the illumination study is to be carried out at all the locations of mathura refinery for installed led lights: work1. study & review of existing lighting system installed in the refinery premises against is:6665, oisd - 149 or any other applicable international standard etc. study & review for correction/adition in the system to comply with various applicable standards for petroleum industry. 2. carry out healthiness check of the existing lighting system installed and suggest modifications, if any. 3. proposed modification / addition in the existing system shall comply with applicable standards with back-up support / calculation for proposed changes. 4. suggest maintenance practices for the lighting system already installed at mr and newly suggested system if any. 5. provide detailed specifications for the lighting system needed to be installed for modification. 6. details of modifications and addition in the lighting system to comply with various applicable standards for hazardous industry. 7. recommendation for strengthening of lighting system suggested shall be as per oisd / is/ international standard 8. submission of report in hard copy (3 sets) along with soft copy (01 no.) within the contract period.the job to be completed within 40 working days and final illumination survey report shall be submitted within 60 working days from the date of handover of site. full & final payment shall be released after submission of report to iocl . vendor to submit report in both graphical & tabular form in the format which shall be decided at the time of start of job by eic. 9. vendor to depute sufficient number of groups to complete the job within time schedule of work order at mathura refinery. each group must have atleast two qualified persons as per service line item. each group shall work for period from 1800 hrs. to 2200 hrs. daily excluding sundays and holidays. 10. vendor may carry out pre-visit of the site for the study, if felt necessary, however at their own expenses. 11. to and fro travel charges, boarding, lodging and accommodation shall be in the scope of vendor. however, local transport within the refinery shall be provided by iocl. 12. payment shall be released only upon submission of the study reports. 13. vendor to follow all the necessary safety guidelines, rules & regulations inside the plant. 14. all the measuring instruments , testing equipments , tools & tackles required to complete the job shall be in the scope of vendor. testing equipments should be of intrinsically safe category & should be caliberated from nabl approved lab.caliberation certificate must be presented to eic/sic for verification during start of the job. 15. all the locations in side plants which are not mentioned in the list shall also be covered for illumination checking as decided by eic. 16. vendor to furnish suitable bar chart for execution plan before start of job to eic for timely completion of the job