Web Analytics Made Easy - StatCounter

Pump Bucket Tenders

Get complete information related to latest Pump Bucket Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Pump Bucket Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Pump Bucket Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39320747 Due date: 10 Mar, 202510 Mar, 2025 20.0 Thousand
Tender For corrigendum : supply of items required for hydroponics system for irrigation - iron stand with growing channels , swr pipes , swr elbow , swr pipe , ph paper strips , premium net pots , submersible water pump , bucket , clay pebbles , seasonal seeds , coco peat disks , hose pipe , nutrient solution bottles , spray bottle

Central Government And Public Sector

CTN :39572417 Due date: 26 Mar, 202526 Mar, 2025 NA
Tender For supply of spares for kirloskar chiller - 1 oil lubricant , 2 oil filter , 3 gasket filter , 4 oil pump , 5 cover oil filter , 6 filter

State Government

CTN :39556935 Due date: 10 Mar, 202510 Mar, 2025 3.75 Lacs
Tender For providing portable water pump set & reserve osmosis with chiller plant at love kush vatika range udaipur

Central Government/Public Sector

CTN :39527530 Due date: 11 Mar, 202511 Mar, 2025 19.7 Thousand
Tender For supply of rubber goods - 76 mm gps 125 mud pump bucket , valve insert gps 125 mud pump , valve cover packing gps 125 mud pump , piston rod packing gps 125 mud pump , hydraulic spindle v packing small dm 1000 rig , hydraulic spindle v packing big dm 1000 rig , tyre coupling f-110 gps 125 mud pump , nq shut off valve , skidding cylinder bucket dm 1000 rig canvas

Central Government/Public Sector

CTN :39510192 Due date: 27 Feb, 202527 Feb, 2025 NA
Tender For extension of last date of submission - annual maintenance contract for operation & routine maintenance of centralized ac plant (2x250 tr.) & allied accessories i.e. (chiller plant, chiller/condenser pump, cooling tower, ahus etc.) installed at bank??s office premises, rbi kanpur

Private Sector

CTN :39495140 Due date: 09 Mar, 202509 Mar, 2025 NA
Tender For sale of aluminium roller , atb conveyor , chairs and telephone instrument , chiller , compressor , dehumidifier , hand pallet , ink pump , turner bar assembly , stacker for web machine , air compressor , trolly ,etc,.

CTN :39475104 Due date: 04 Mar, 202504 Mar, 2025 5.98 Lacs
Tender For repair maintenance of 310 tr capacity ac plant in block no. 9, 10 & 11 at cgo complex, lodhi road, delhi. (sh - raising height of condenser/chiller pump sets to safeguard from flooding water and replacement of defective accessories)

CTN :39098315 Due date: 18 Mar, 202518 Mar, 2025 NA
Tender For corrigendum : supply, installation, testing & commissioning of rotary evaporator, vacuum pump & chiller

CTN :39419493 Due date: 13 Mar, 202513 Mar, 2025 NA
Tender For deequipping and destoring ofinfac t82 - 1 removal of fwd gun mount, qty-01. 1 no 2 removal of aft gun mount, qty-01. 1 no 3 blanking of fwd gun mount post, qty-01. 1 no 4 blanking of aft gun mount post, qty-01. 1 no 5 removal of small arms post- qty-02. 2 no 6 ra for removal of capstan. 1 no 7 blanking for weather proofing post removal of capstan. 1 no 8 removal of soft patches for both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 9 fitment of soft patches post removal of both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 10 removal/ degutting of both main engine and asd pump. 2 no 11 manufacturing of cradle (mat iron) and box (matwooden) for transportation of main engine.qty - 02. 2 no 12 manufacturing and fitment of dead weight and bilge plates. 1 no 13 removal of both main engine compensator bellow, qty 04. 4 no 14 removal of both main engine fuel water separator, qty 02. 2 no 15 removal/ degutting of both gearbox. 2 no 16 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of both gearbox. qty - 02. 2 no 17 manufacturing and fitment of dead weight and bilge plates for both gear box. 18 manufacturing and fitment of dead weight for both asd - 14 2 no 19 manufacturing and fitment of dead weight for both propellers. 2 no 20 removal/ degutting of ac plant and its auxiliary. list of auxiliaries:- (a) tev (thermostat expansion valve. (b) heat exchanger (condenser). (c) heat exchanger (chiller). 1 job 21 manufacturing and fitment of dead weight for ac plant. 1 no 22 decouple and removal/ degutting of fwd da 1 no 23 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of fwd da. 1 no 24 manufacturing and fitment of dead weight and bilge plates for fwd da. 1 no 25 decouple and removal/ degutting of aft da. 1 no 26 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of aft da. 1 no 27 manufacturing and fitment of dead weight and bilge plates of aft da 1 no 28 removal of hp pump of ro plant. 1 no 29 removal/ de-gutting of ro plant. 1 no 30 manufacturing and fitment of dead weight and bilge plates for ro plant 1 no 31 removal of soft patches for aft da and ro plant. 1 job 32 fitment of soft patches for aft da and ro plant. 1 job 33 removal/ de-gutting of mcs 5 control system with it s auxiliary. list of auxiliaries:- (a) lop 02 (b) junction box 02 (c) rcs 04 (d) ecs -02 (e) throttle lever 04 1 job 34 blanking of patches post removal of mcs 5 control system to maintain weather proofing. 1 no 35 removal/ de-gutting of asd steering control box with accessories and it s auxiliary. list of auxiliaries are as follows:- (a) steering trim indicator 02 (b) main control 1 job page 3 / 13 panel 01 (c) asd controller 01 (d) trim controller lever 02 36 blanking of patches to maintain weather proofing for asd control box system. 1 no 37 removal of halon bottle 2 no 38 removal/ de-gutting of both shaft & support bearing 2 no 39 manufacturing of cradle (mat iron) and box (wooden) for transportation shaft & support bearing. qty 02. 2 no 40 requirement of tractor & trailer for shifting of items from ship to center for 20 days. 20 days 41 transport requirement (01 tonner) for shifting of items from ship to center for serviceability checks, 40 days. 40 days 42 requirement crane with sling (15,10,05,02 and 01 ton) for 40 days 40 days 43 removal of radar vm display, atu and antenna. 3 no 44 removal of existing cables of radar vm. 3 no 45 blanking and fitment of patches to maintain weather proofing 1 no 46 ra for degutting and de-equipping of ecdis display, ups, processor unit and interface unit with removal of cables. 4 no 47 removal of wind speed sensor and its dispaly unit and cables 1 no 48 blanking and fitment of patches to maintain weather proofing 1 no 49 removal of mss mk ii system, antenna and cables. 2 no 50 mk ii blanking of patches to maintain weather proofing. 1 no 51 removal of 07 in number navigation and emergency light. 7 no 52 manufactu

Central Government/Public Sector

CTN :39341231 Due date: 06 Mar, 202506 Mar, 2025 56.86 Lacs
Tender For replacement of pump for 300tr and 600tr chiller plant at amritsar airport
 Loading, Please wait...

Connect us via What's Up