Web Analytics Made Easy - StatCounter

Rail Car Tenders

Get complete information related to latest Rail Car Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rail Car Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rail Car Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39859902 Due date: 25 Apr, 202525 Apr, 2025 NA
Tender For repair and renewal of washing line at jind, replacement of corroded pipe line and provdion of coach watedr facility for platfrom no.4 at jind in the section of aden/jhi under sr. den-iv/dli.

Central Government/Public Sector

CTN :39885757 Due date: 08 Apr, 202508 Apr, 2025 9.94 Lacs
Tender For providing of obhs and related service for railways (new version 2.0) - coach related cleaning; internal; toilet, rake, berths/seats, window glasses, vestibule area, coach floor area, door area, toilet washing, toilet drying, mirror; mechanized; per workstation pe..

Central Government/Public Sector

CTN :39883585 Due date: 09 Apr, 202509 Apr, 2025 NA
Tender For supply of brake block adjuster for emu motor coach bogies drg. no. emu/m-3-2-027 alt a/5.

Central Government/Public Sector

CTN :39272255 Due date: 03 Apr, 202503 Apr, 2025 NA
Tender For lwlrrm shell kit (a) lwlrrm - roof, sidewall and end wall one coach set of roof, 2 mm side wall and end wall for lwlrrm coaches with noise reduction feature 1) roof c omplete to drg. no. 53816018, alt 'c' - 1 no 2) final roof element to drg. no. 83416016, alt ' a'-1 no 3) roof end part complete to drg. no.83416017, alt 'a' -1 no 4) end roof assy to drg no. 58116066, alt 'g' - 1 no, 5) ss trough arrangement to drg no. 53816023 alt 'a'- 1 no 6) side wall right complete to drg. no. lp14110, alt a anx. 6 -1 no 7) side wall left complete to drg.n o. lp14111, alt a anx.6 -1 no 8) sidewall npp-end right complete to drg.no.1.10113.0.20.110. 004, alt b anx.3 -1 no 9) side wall coach end complete to drg.no. 1.10113.0.20.110.003, alt b anx.4 -1 no 10) side wall pp end left cpl to drg.no. 1.10113.0.20.110.005, alt nil anx.3 -1 n o 11) side wall pp end right cpl to drg .no. 1.11012.0.20.110.003, alt nil anx.3 -1 no 12) end wall complete for lhb power car to drg. no. 1.11012.0.20.120.003, alt a anx.9 - 1 no with l atest detail drgs 1.11012.0.20.120.004-alt b anx-4 and mi007721_a_anx-2 13)end wall compl ete for lhb power car to drg. no. lp15103, alt nil anx-2 -1no 14) door cut out to drawin g no. lr10295-1 no & lr10296, alt a-1 no, 72914089, alt c- 1 no, 729 14 091, alt c- 1 no, 15) car l ine nos 1.11012.0.20.110.007, alt r - 1 no and 1.11012.0.20.110.008, alt r - 1 no. the end wall sha ll be assembled with cover sheet and shutter complete to item no.1 & 2 of drg.no.3.1011 3.0.20.120.183, br and item 6,7,8,10,12 of drg.no.2.10113.0.76.300.002, alt c and tail lamp br acket to drg no.2.10113.0.10.300.001. the firm shall fulfill the requirement as per.icf/md/ specn.200, issue status-01, rev-04 with amendment no-01. for end wall the firm shall fulf il the requirement as per icf/md/spec-315,issue status-01, rev.00. firm has to supply roof and sidewall without applying etch primer and the firm has to apply etch primer on roof and sidewall in icf after shell assembly. (b) body shell items & partitions for lwlrrm shell kit supply and insta llation of body shell items and partition frames for lwlrrm coaches to drg. no. 1) aaa1 0488, alt. c- 2 nos (rain water gutter) 2) 2 11012.0.20.110.100, alt.nil-2 nos.(rain water gutter) 3) lp 10107, alt. nil - 2 nos,(sheeting) 4) lp10136, alt d anx-4 -1no. (welding parts car body) 5) lp10125 alt b anx-10, item-33 - 14 nos.(ledge) 6) lp10108, alt a anx-1- 8 nos.(duct assy) 7) aaa10278, alt . nil-4 nos.(hand hold arrangement) 8) 1.11012.0.03.095.001 alt a -1 no (w/p in u/f incl. 53810070 & 53810035) 9) lp10139, anx-5 - 1 no (partition frames) the above items to be supplied as set and install the same at the body shell assembly stage to assembly drg.no. lp10125, alt b anx -10 (c) under frame arrangement -613-lp11103 alt 'd' anx-7 the manufacturing facility as pe r icf/md/spec-147, issue status-01 rev.02 with amendment no.01 special condition : a) -packin g as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1867, alt. 'nil' -packin g as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk-1865, alt "a". installa tion required as per assy.drg.& annexure-a, dtd 13-09-2023 to be followed. supply rates a nd installation rates to be quoted separately. c)packing condition as per drg.no.icf/j&t /misc-2487, alt 'b' the underframe should be supplied as normal side up and side bearer s ide down. [safety item ]

Central Government/Public Sector

CTN :39442040 Due date: 04 Apr, 202504 Apr, 2025 NA
Tender For lws pp-2 shell kit (a) one coach set of roof, sidewall and end wall for amrit bharat l ws/pp2 (754) 1. roof assembly to drg no 75416001, alt nil- 1 no, 2. end roof assembly to drg no 9721 6008, alt 'a'- 2 nos 3. side wall to drg no 75414001,alt 'a'- 1 no welding pin arrangement to drg no 58 110037 alt 'nil' has to be assembled on roof and sidewall while supplying. 4. end wall to drg no 75415 001, alt 'b'- 2 nos the firm shall fulfil the requirement as per icf//md/specn.200, issue status01, re v 04 with amendment no 01. the firm shall fulfil the requirement as per icf/md/spec-315,i ssue status-01,rev.00 firm has to supply roof and sidewall without applying etch primer and the fir m has to apply etch primer on roof and sidewall in icf after shell assembly. (b) one coach set of bo dy shell items and partition frames for lws/pp2 (754) coaches to drg nos, 1. 75410041, alt ni l - 1 no 2. 75410002, alt 'b' - 1 no 3. 75410006, alt nil - 2 nos 4. 58110054, alt 'e' - 1 no 5. 67010011, alt 'a' - 2 nos 6. aaa10488, alt 'c' - 6 nos 7. 58110017, alt 'b' - 2 nos 8. aab10338, alt nil - 24 nos 9. a ai10188, alt nil - 4 nos (c) under frame arrangement to drg no. lws pp 67011001, alt 'l'. specia l condition : a) -packing as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1 867, alt. 'nil' -packing as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk- 1865, alt "a". c)packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe sh ould be supplied as normal side up and side bearer side down. [safety item ]

Central Government/Public Sector

CTN :39588883 Due date: 08 Apr, 202508 Apr, 2025 NA
Tender For supply of one coach set of frame work and back pieces to lscn/bw2 (753) coaches to drg nos. 1 ) frame work to drg no 75314007, alt 'nil' - 1 no. 75314014, alt 'nil' - 1 no. items in col i in the drgs a bove to be supplied as loose. 2) back pieces for acp interior to drg nos 75314009, alt 'nil'- 1 no. and 7 5314010, alt 'nil'- 1 no. to be supplied in coach set. special condition : packing drawing as per icf /j&t/sk-1865 alt 'a' [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39589462 Due date: 08 Apr, 202508 Apr, 2025 NA
Tender For shell kit item for lslrd without dg set 1)underframe complete to drg. no. 7 4111001, alt 'd'- 1 no. the manufacturing facility as per icf/md/specn.147, issue status-01, rev.02 with amendment no.1 2)roof assembly to drg. no. 74116001, alt 'e' - 1 no. to be suppl ied with welding pin as per drg no 74110053, alt "nil'- 1 no (with latest sub drawing 49516008, alt 'a') 3)end roof assembly to drg. no. 58116066, alt 'g' - 2 nos. 4)location of 2 mm side wall ass embly to drg. no. 74114001, alt 'e' col.i - 1 no location of back pieces to drg. nos. 741140 71, alt 'c' and 74114056, alt 'nil' shall be assembled on side walls. items marked as loose in drg. nos. 74114071, alt 'c' and 74114056, alt 'nil' to be supplied as loose, along with sid ewall assemblies. the firm shall fulfill the requirement as per icf/md/specn. 200, issue st atus-01, rev-04 with amendment no.1 5)end wall complete npp end to drg. no. 74115003, a lt 'b' -1 no. 6)end wall complete pp end to drg. no. 74115001, alt 'f' -1 no. the firm shall fu lfil the requirement as per icf/md/spec-315,issue status-01, rev.00. 7) body shell items an d partition frames to drg.no. 74110001, alt 'f' (except items 1 to 6) - 1 no. firm has to supply roof and sidewall without applying etch primer and the firm has to apply etch primer on roof and sid ewall in icf after shell assembly. special condition : packing for roof and side wall as per sche dule a-(to be delivered to shell) complete roof and side wall to be supplied with welding p ins welded to roof assembly as per drawing. schedule b-(to be delivered to fur) cap to dr awing no 49516008002 alt 'a' and serrated spring washer to drawing no 49516008003 alt 'a' of required quantity as per drawing are to be packed in suitable polythene bags of 100 microns thickness with printed label with complete details kept inside hthe polythene b ags. (complte details: 1. item description 2.qty in the packing 3. date of packing 4. po no. 5. type of coach 6. vendor's name and address.) "polythene bags to be sealed properly to prevent mois ture and water entry". a) i) packing as per icf/j&t/misc-2201, alt 'e' safety instruction as p er icf/j&t/sk-1867, alt. 'nil' ii) sl.no 16#b of note to drawing 58216002,alt 'j' to be strictly followed. packing for end wall as per drg. icf/j&t/sk-1809, alt 'a' packing condition for underfram e as per icf/j&t/misc/2487, alt 'b' packing drawing for body shell items and partition fram es. icf/j&t/sk-1865, alt 'a'---- the underframe should be supplied as normal side up and sid e bearer side down. all the threaded holes shall be provided with suitable dummy bolts to safeguard the threads. [safety item ]

Central Government/Public Sector

CTN :39618915 Due date: 03 Apr, 202503 Apr, 2025 NA
Tender For supply of one coach set of primary spring inner & outer for emu & memu-us coaches t o drg.no. aaa01068 alt 'c' -8 nos and--- aaa01069 alt 'c' -8 nos---to rdso specification rdso/2 017/cg-01,rev-03 or latest----. special condition : packing as per drg. no. icf/j&t/sk - 1770, alt ' a'. [ warranty period: 72 months after the date of delivery ]

Central Government/Public Sector

CTN :39883613 Due date: 04 Apr, 202504 Apr, 2025 NA
Tender For supply of stainless steel end wall for 3 phase ac emu driving trailer 'd' coach to drg. no. emu/d/hc/3ph-1-5-001 col.i alt 'f'. special condition : packing condition as per drg. icf/j&t /sk-1777, alt 'a'. [ warranty period: 30 months after the date of delivery ]

Central Government/Public Sector

CTN :39883902 Due date: 08 Apr, 202508 Apr, 2025 NA
Tender For supply of one coach set of linen room arrangement for lwfcwac coaches
 Loading, Please wait...

Connect us via What's Up