Tender For corrigendum : scope of work:1. insertion of log gate & screen removal & cleaning.2. preparation and fabrication of necessary arrangement for maintenance of back-up acw, fire hydrant /spray and raw water pumps.3. decoupling of pump and motor, removal of motor skirt and shifting of motor from skirt.4. dismantling of thrust bearing and bearing housing.5. dismantling of complete column pipes, enclosure pipe, shafts, impellers etc.6. complete dismantling of back-up acw, fire hydrant /spray and raw water pumps.7. issue and shifting of spares from store to the site.8. repairing and replacement of worn out parts and d.p. test of spare parts, impellers, shaft and sleeves, bearing housing etc.9. cleaning of all column pipes and enclosure pipe and painting with black paint.10. painting of top column pipe, motor skirt & motor with blue/smoke gray colors. painting of bearing cooling water line and discharge pipe of back-up acw, fire hydrant /spray and raw water pumps with green paints.11. assembly of pump as per oem guideline and shifting of motor on its skirt.12. alignment checking of pump and motor coupling.13. coupling of the pump after motor trial.14. removal of log gate after screen fixing. 15. commissioning of the pump & trail. terms and conditions: 1. the contractor shall have to arrange all men, machine, t&p, consumable, dp test kit including entire qty. of blue/green/ black bituminous paints of shalimar/berger/asian brand at their cost. 2. completion period: within 8 days for each pump from the date of handling over.3. payment terms: 100% payment shall be released after successful overhauling and commissioning of each pump, within 45 days.4. penalty terms: penalty shall be imposed @ rs. 1000/- per day or part thereof due to delay in work but limited to 10% of order value if delay in completing the work.5. mobilization period: firm has to mobilize his team & t&p for start of work within 7days after intimation from engineer-in-charge otherwise penalty @ rs. 500/- per day shall be imposed till start of work.6. guarantee: complete overhauling work is to be guaranteed for minimum 06 months against spurious paints and poor workmanship.7. the contractor will have to provide all necessary safety appliances to his workers engaged and he will be fully responsible for safety of his workers.8. contract period one year. scope of supply(a) cspgcl scope:1. spares of above pumps, fasteners will be provided by cspgcl kw.2. eot crane, compressed air, electricity, water will be provided by cspgcl free of charge.3. workshop facility shall be provided by cspgcl kw.(b) contractors scope:1. all men power, tools tackles, chain pulley block, measuring instrument, welding machine, cutting set, grinders consumable material rustolene, welding electrode, grinding stone, teflon tap, paints etc. shall be arranged by contractor.2. crane operator will be arranged by contractor. executive engineer (tmd-ii, bop) 1x500 mw, cspgcl, htps, kwb
Tender For supply of spares for bosch 6 100 angle grinder : :-- on off switch for grinder bosch gws 6 100 , intermediate ring for bosch gws 6 100 grinder , housing cover for bosch gws 6 100 part no bsd 105500194 a2 , gws 6 100 pinion of bosch make 4 grindingmachine , brush holder for bosch gws 6 100 grinder , gws 6 100 gear of bosch make 4 grindingmachine , gws 6 100 carbon brush of bosch make 4 grindingmachine , motor housing for bosch gws 6 100 grinder , rubber ring for bosch gws 6 100 grinder
Tender For bid to ras corrigendum : supply of bench grindingmachine for frigate project , accessories & tools for bench grindingmachine , on-board spares (obs) for bench grindingmachine , supply of manuals & certificates for bench grindingmachine
Tender For various signaling work in connection with:(a)provision of goodshed at various location (i)circulating area & road widening at kherwadi(ii)concrete approach roads to gs-1 & gs-2 at lasalgaon(iii)provision of office, labour & merchant room at savda & malkapur/akola/ paras along with other facility renovation & (v)high level platform & cop development at nashik.(b)provision of one common room at various location of bhusawal division, two stabling lines in dn direction at nasik road, development of track machine siding at nepanagar station, extension of passenger platform and stabling line at dhule station and development of railgrindingmachine siding at bhusawal coaching complex yard.(c)provision of mridc work:(i)rob & lhs at rly.km.666/07-08(ii)rob at badnera rly.km.662/18-19(iii) rub at rly.km.545/21-22n.(d) provision of rob between new amravati-walgaon stations.(e) elimination of manned lcs by providing subway in lieu of (i)lc no-13 at kms 693.596 (ii)lc no-14 at kms 695.764 (iii)lc no-15 at kms 698.685 on bd-cndb section and (iv)lc no-17 on badnera-narkher section.(f)elimination of manned lcs by providing subway in lieu of(i)lc no.05 on badnera-narkher section (ii)lc no-12 at kms 690.09 & (ii)lc no-11 at kms 685.62 on bd-cndb section.(g) elimination of manned lcs by providing subway of size 5.0x4.5 m by push through method in lieu of lc no.(1)jk-2@ kms 538/08-09 (2)lc nojk-5 @ kms 543/05-06.