Tender For supply, installation and commissioning gps tracker personnel tracking device (ptd) including sim card with 03 years warranty for regular use of patrolmen and usfd operators under chennai division having specification as per rly board l. no. 2017/track-1/29/8 dated 16.01.2018( guidelines for gps based personal tracking system) (ptd having specification as per rly. make brand- mkt4g, prime system track 4g or equivalent 4g device. related assistance as per technical attached specification. oems test and oems warranty certificate to be submitted at time of supply of material to consignee. (warranty period : upto 36 months from the date of delivery.) [ warranty period: 36 months after the date of delivery ]
Tender For improvements to inspection track from chainage km 6.00 to km.14.00 of spvbr right main canal under tgp system distributors in g. narasapuram village, chowdarivaripalli gp, b. mattam mandal of ysr kadapa district. for the year 2026-27.
Tender For corrigendum : providing of custom bid for services - supply, installation and commissioning of track based rail lubricator (electronic type) with dual applicator/wiper bar complete system as per rdsos technical specifications as mentioned in scope of work and tender schedule,custom bid for services - supply of grease for 05 years as per specification of lubricant vide rdso technical specification no irs-t48 along with advanced specifications as mentioned in scope of work and tender schedule
Tender For carrying out of preventive, operational and emergency maintenance works of dcs system, ews, ows, lvs, networking, dsph1, csu, de, ds, dfds, vms, md, sm, ilms, ups system and its connected batteries, bhms, olhs and part of fda system including ci equipments and connected panels from track hopper-2 up to tp 25, tp 27 tp 30 including erh, drive house and rcerh pertaining to stage2
Tender For sw-i ) "annual zonal contract - alongside the railway track yard from krishna bridge (i.e.,) km.425/27-a for west line and km.425/27-a for east line to km.431/6&7 for both slow & fast lines towards visakhapatnam side and upto km.569/0-1 towards secunderabad side including all service buildings, staff quarters alongside the track and rayanapadu including, west booking office, supervisors and officer's rest houses, rri cabin all cabins and goods shed within the yard and mineral siding and road leading to els from mineral siding and all track works upto km.569/0-1 in aden/bza jurisdiction for the period 01.07.2026 to 30.6.2027.sw-ii)annual zonal contract - repairs and maintenance of water supply system of all staff quarters, service buildings under sse/works/wa/bza section including staff quarters and service buildings at rayanapadu and kondapalli stations in the sub-divisions of aden/buildings/bza and aden/bza for the period 01.07.2026 to 30.06.2027.
Tender For pre & post tamping track measurement survey using trolley-based measurement system in the jurisdiction of special repair den/n/bkn under control of aden/hmh-ii (total 456.925 tkm).
Tender For pre & post tamping track measurement survey using trolley-based measurement system in the jurisdiction of special repair den/s/bkn under control of aden/ratangarh (total 594.200 tkm)