Tender For work for replacement of 150/200 mm dia sw line with 300 mm dia rccsewer line in ward no 12, at jarakabande kaval slum near forest office compound,coming under bahubalinagar service station area of aee nw-3 sub-division
Tender For work of providing and laying of 230mm sw sewer line and construction of machine holes in avilana public school opp near vijayalakshmi layout, ganesha temple road, bhel mini colony mallasandra coming under mei layout 2 service station area of aee nw-3 sub-division.
Tender For work of providing and laying of 230 mm dia sw sewer line and construction of machine holes in ward no 15, from sm road indian oil petrol bunk towards jalahalli cross rockline mall 18th cross coming under mei layout 2 area of aee nw-3 sub-division.
Tender For work for replacement of 150/200mm dia sw line realignment of 230 mm dia sw sewer line and construction of machine holes in ward no 14, 18th cross mei layout near blossom school towards 5th main mei layout coming under mei layout 1 service station area of aeenw-3 sub-division
Tender For repairs and renovation work for sewer line in boys hostel at law college premises at rashtrasant tukadoji maharaj nagpur university, nagpur.
Tender For providing and laying 900 mm outer dia hdpe pipe pe-80 grade and pn-6 for sewer application and earth filling in breached embankment of ghaghar river for stp lali at outfall of effluent channel at ghaghar river and all other work contingents thereto. ch. to - estimate for laying of sewer line in newly approved colonies and replacement of existing sewer line in tohana town district fatehabad estimate cost: rs 44.40 lakhs
Tender For 2.0 mld stp at begampur khatola village ward no 17, gurugram - design, const., erection, testing and commissioning of 2.00 mld stp based on sbr tech. including mps, all civil, elect. mech. work, piping and instrumentation work with plc and scada arrangement for stp and mps , laying of sewer line, rising main (as described in the dnit) oand m for and 2.00 mld stp for 5 years after defect liability period of 1 year and trial run period of 3 month and all other works contingent thereto.(as per condition laid in the dnit)