Web Analytics Made Easy - StatCounter

Rcc Underground Tank Tenders

Get complete information related to latest Rcc Underground Tank Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rcc Underground Tank Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rcc Underground Tank Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :38986419 Due date: 27 Jan, 202527 Jan, 2025 NA
Tender For procurement of manufacturing items ii - rm.0807 - plugs, zinc anode plugs, drain plug for main boiler. dimensions - 39x2, zinc anode plug, zinc anode adaptors (td circ, tdfl, waste steam condenser, obbm cooler, main lub oil cooler) as per sample, condenser brass plugs as per sample, condenser wooden plugs, s/w cooler drain plug( s/w chamber), tdac plant all 08 sea water pump suction strainer purging plug to be manufactured as per sample., plummer block drain plugs, plummer block charging plug, handle / tool, ladder sprinkling system, 3 way valve operating handle, butterfly valve operating handle, turning tool of hpac, special tool for removal of sieve & special tool for absorber, fip purging tool, t-handle, machinery turning tool (fcbt, td-circulator, ) as per sample/ drawing, mtga hand turning tool as per sample, t - handle of various size for opening of valves, t - handle of various size for rotation of tbu lub oil filters, tbu turning tool, fuel system return line 3-way cock handle, boiler sight glass cover with handle, hydraulic filter opening tool, tools for opening hydrant coupling, tools for opening hydrant lugs, t handle for deck cap, manufacturing of tool boxes with lock and key mechanism. size-700350 400mm, special tool (t - handle) used for avcat fuelling as per sample, arresting gear bow spring fastener tightening handle, fueling post hand pump operating handle, socket termination test assembly tightening handle, sac lift purging tool, handle for holding melting pot, steering gear valve box operating tool, valve spindle of various sizes as per sample. qty-50, mat-, strainer, pgv tank suction strainers (as per sample), tdac 2, tdac 3, mdac, fwd ref plant bilge suction strainer bilge system suction strainer perished, to be manufactured as per sample/drawing., sea water pump suction strainers perished to be manufactured as per sample. pipe dia 250mm, strainer body of dg, tg, dp, fire pump suction strainer, s/w system strainer element, cooling water pump suction strainer body as per sample/ drawing. qty-05, cooling water pump suction strainer elements filter as per sample/ drawing. qty-05, spanner, manufacturing of wheel spanner for cfss station halon bottle hp air charging, wheel spanner, pressure gauge isolating valve spanner, wheel spanners of different sizes as per sample/ instructions, special tool - spanner for boiler doors as per sample, cut ring spanner of 65, 70, 36,41, 46, wheel spanner of various sizes to be manufactured as per sample.03 small and 03 medium size., manufacturing of wheel spanners of various sizes as per sample, spanner tool box with partition as per instruction/drawing. qty-01, cap/ spacer / clamp, tg spacer, dp spacer, sounding tube cap & tap for lub oil, feed and fuel tanks as per sample/ drawing, mtga turning motor cap as per sample, deck cap, sounding tube cap, upper stationery block brass cap, damper cylinder vent cap, power pack pump sump cap with sealing arrangement, as per sample, rg hose clamps, "c" clamps for socket load testing machine, portable eye, cap. - 04 tons, sling for pulling wire rope. cap.- 02 ton, manufacturing of blank cap as per sample for avcat fuelling post., cock filter cover, tank top door as per sample/ drawing. qty- 4 each, coupling/ gasket / anode, double female coupling, double male coupling, all pumps coupling (fuel pump, circ md lub oil pump, rcp, feed transfer pp) as per sample. qty-10, mat- ,, guard rail couplings, main switch vv gasket, main circulator l/o cooler zinc anode as per sample, zinc anode for condenser as per sample, zinc anode for main lub oil cooler as per sample

CTN :38917495 Due date: 01 Feb, 202501 Feb, 2025 12.00 Lacs
Tender For purchase of various apparatus/instruments required for department of chemistry, chaudhary ranbir singh university, jind - stirrer the stirrer should be made up of ceramic coated aluminium alloy top with digital speed and temperature control. the stirring speed should be 50-1500 rpm or better. the stirrer should be operational up to a temperature range of 300oc with an accuracy of 1.0oc and ip 42 protection class. the input power should be 600 w or above. the stirrer should be supplied with hemispheric bowl (100 ml= 1 no; 250 ml= 1 no) to replace oil baths and mantles in order to perform clean and safe analysis with round bottom flasks., electronic balance the electronic balance should have a maximum weighing capacity of 200 g or more with a resolution and repeatability of 0.1 mg, and a response time of 5 sec or better. the system should have automatic internal calibration with touch screen display. the system should have internal database capacity of 2500 or more with multiuser password protection feature. , vacuum pumpthe pump should be operational at a maximum power of 65 w or more with a max. vaccum of 99 mbar or more. the pump should be fitted with vacuum and filter cartridge., hot air oventhe inner chamber should be made of stainless steel and the outer chamber should be m.s powder coated. the maximum capacity of the oven should be 100 ml or more. the operational temperature should be between ambient to 250 oc or more with a temperature accuracy of 1o c. pid based digital temperature control., double distillation unitthe unit should be pyrogen free with a distillation water output capacity of 1.5 l/h. the minimum cooling water requirement should be 1lt/min. auto-power cut facility in case of halted supply of water., circulating oil baththe oil bath should be made up of stainless steel with 4 digit 7 segment led display for temperature and time. the bath should have s.s perforated tray for holding flasks. the bath should have a capacity to accommodate flask of 1l. the working temperature range should be +5 to 240 oc (0.1 oc increment) with a temperature stability of 1oc., water baththe water bath should have a capacity of 20 l within built water level sensor. the bath should be made up of stainless steel and supplied with 8 concentric rings. the bath should have digital temperature control with pt100 sensor. the system should have stirring capability with ptfe magnetic bars. , ph conductivity meter operational between a ph range of -2 to 16.00 with a resolution of 0.01 ph and an accuracy of 0.02 ph. 5 points calibration. the ec range should be in between 0.00 to 29.99 s/cm, uv cabinet operational at two uv wavelengths (254 and 365 nm). the cabinet should also be equipped with one visible light. the external body should be coated with ms powder/epoxy., flame photometerapplication: the flame photometer is used for qualitative and quantitative determination of several cations, especially for metals that are easily excited to higher energy levels at flametemperature. these metals include na+, k+, ca2+, ba2+ and li2+.specification requirementmeasuring range na+: 0 to 99.9 ppm k+:0 to 99.9 ppm ca2+ :0-99.9 ppmli2+: 0 to 99.99 ppmsensitivity na+= 0.1 ppmk+ = 0.1 ppmspecificity less than 0.5% interference when concentrations are equal to test sample concentrationsgas control-adjustable with knobsignition system-auto ignition systemflame failure-auto detectiongas cut off-automaticreproducibility-less than 1% coefficient of variation for 20 consecutive samplesusing 10 ppm na set as maximum standardlinearity-less than 1%display led, 12.5 mm (1/2")fuel supply-high-grade propane/butane mixture regulated at approximately30 psiair supply-6 l/min at 12 psi; oil and moisture freerecorder-output 0.05 to 5 v (switchable)operating manuals, service manuals, other manuals should provide user, technical and maintenance manuals in english language list of equipment and procedures required for local calibration and routine maintenance service and
 Loading, Please wait...

Connect us via What's Up