Get complete information related to latest Retaining Collar Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Retaining Collar Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Retaining Collar Tenders.
Tender For repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1001 hoist the boat making sure that bearing surfaces are adequately cushioned docking duration 07 days; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1002 clean the marine growth with wooden scrapper; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1003 wash the underwater area with fresh water rub with grade 220 emery papers and smoothen the surfaces; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1004 clean with mild detergent in fresh water inspect for cracks and peeling of gel coat repair if necessary; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1005 touch up the antifouling paint as per paint scheme paint yard supply; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1006 clean all sea suction scoops and inspect for cracks; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1007 clean the marine growth of shaft propeller and rudder; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1008 measure and record the clearance of stern tube and p bracket bushes rudder and rudder jumping collar; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1009 overhauling and pressure testing of the underwater valves and cocks including painting of valvesall material and spares yard supply i gs pump underwat.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1010 clean the bilges and thoroughly inspect the structure to main engine foundation supports for distortion cracks and delamination; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1011 check the tightness of foundation bolts of all auxiliary machineries; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; ha1012 marine toilet remove and clean all flexible pipes and refit with new clipshand pumpsuction and discharge valve to be overhauledmake jabscomodelcmpct 24vdia.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wk507; hb1013 dfender crack and deterioration observed at dfenders at various places to be renewed as per samplelegth approx10 mtrebd type rubber fender 75x75x40 mm; se.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1014 cleaning and painting of bilges of following compartment to be carried out as per paint schemepaint yard supply i engine room 148 sqm approx ii pum.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb 1015 wheel house sofa rexine is deteriorated and tear off at various places to be renewed as per samplelength 03 mtr height and breadth 05 mtr each; service pr.. , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb 1016 wheel house sofa and sitting area seat cover to be changed as per sample length03 mtrheight and breadth 05 mtr eachqty02; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb 1017 wheel house sofa and sitting area floor mat is damaged to be renewed as per sample area 12 sqm mat pvc vinyl; service provider , repair, maintenance, and installation of plant/ systems/equipments (version 2) - wb507; hb1018 wheel house wash basin tap leaking drain pipe choked pipe to be chemically clean and tap to be reneweddia of pipe40mmmaterial ms tap materialss; service pr.. , repair, maintenance, and installation of plant/ sys
Tender For supply of brush cleaning , pump tyre foot , secondary fuel filter 1 liter , lever tyre car or truck , rubber hose radiator to thermostat , rubber hose radiator to water pump , v belt 1280 mm long , screw driver 8 , element oil filter , tool kit bag canvas , shoe set rear brake , tool box , bearing frt wheel , end steering tie rod , bulb , plug and socket assy , driven plate for clutch , spider universal joint vehicular , housing friction clutch , rotary pto switch on off , fuse 5 amp , hub seal rear , rope wire steel 8 mm dia 8 mtrs long , stop light tail light vehicular , rubber hose air intake , bulb 24v , s a water pump , roof marker lamp rh , s a of pipe inj no 5 , friction washer , micro filter make micro flow , horn electrical , knob , light fog , oil seal 9 52 type a , horn signal air horn assy , filter assy shorter ii 77 mm , washer lock , engine speed sensor dg 6 , king pin , handle door , solenoid , tyre pressure gauge , main leaf with bush , speedo cable 4300 lg , assy release cable comp , major repair kit for mcyl , pump water , clip , spanner double end 8x10 , filter element primary , filter element , flasher , element fuel water seprator , sealant liquid gasket , assy wheel cyl , repair kit minor clutch mcyl , assy blade wipper , horn 12 v , assy rear view mirror , flat collar nut , radiator cap assy , front direction indicator rh
Tender For corrigendum : ltsa for services / inspection and refurbishment of spares for gas turbines 230-gt-01 / 02 / 03 and 21-gt-04 / 05 at cpcl, manali - part-a inspection / servicescharges for inspection / services in cpp & oph gas turbines (230-gtg-01/02/03, 21-gtg-04 & 21-gtg-05) for 1st year - 2025 as per scope fo work with time schedule and special terms & conditions attached as annexures., combustion inspection (ci), mechanical, combustion inspection (ci) instrumentation, borescope inspection (bi), major inspection of gt(mi) mechanical, major inspection of gt(mi) instrumentation, auxilary gear box (agb) inspection, load gear box inspection, extended combustion inspection / hot gas path inspection, mechanical / control & instrumentation -ta (technical adviser) - per day (8 hrs), mechanical -ta (technical adviser) - per hour, extra hours beyond 8 hrs on normal working days and on sundays and public hoidays, to & fro travel charges (economy class), boarding & lodging charges & local charges, per ta per visit, to be paid at actuals on submission of doumentary proof, exhaust plenum replacement, igv relocation along with mi, gt frame-v rotor repair, part- b reconditioning of sparescharges for reconditioning services in cpp & oph gas turbines (230-gtg-01/02/03, 21-gtg-04 & 21-g tg-05) for 1st year - 2025 as per scope fo work with time schedule and special terms & conditions attached as annexures, repair of first stage nozzle s1n(1no), repair of 2nd stage nozzle s2n (1no), repair of 1st stage shroud (std), repair of 2nd stage shroud (std), repair of 2nd stage (honey comb) shroud (set=30nos), repair of 1st stage buckets(1set= 120 nos.), repair of 2nd stage buckets (1set=90 nos.), repair of combustion liners, repair of transition pieces, repair, testing calibration of dual fuel nozzle, repair of cross fire tubes, part- c supply of spares for reconditioning & repaircharges for supply of parts for replacement towards repair & reconditioning of oph gas turbines (230-gtg-01/02/03, 21-gtg-04 & 21-g tg-05) for 1st year - 2025 as per scope fo work with time schedule and special terms & conditions attached as annexures., hula seal for combustion liner, cowl cap for combustion liner, cowl cap assembly for combustion liner, xft collar for combustion liner, aft sleeve for combustion liner, fixed seal for transition pieces, floating seal for transition pieces, transition piece assembly for dual fuel nozzle, air cone for dual fuel nozzle, gas tip for dual fuel nozzle, gasket for dual fuel nozzle, lock plate for dual fuel nozzle, t connector for dual fuel nozzle, compressor rotor blade kit with spacer for frame-v for gt rotor repair, marriage hardware for frame-v for gt rotor repair, note: 1. this ltsa contract is valid from 01.01.2025 to 31.12.20292. the above mentioned unit rates are for calendar year 2025.3. to arrive at unit rates for calendar year 2026 = unit rate in 2025 x fixed annual escalation4. similarly for 2027, 2028, 2029, the unit rates will be calculated as above on annual compounding basis from 1st january of every year.5. for part - a & part - b, the fixed annual escalation will be 6%6. for part - c, the annual escalation will be 4%