Web Analytics Made Easy - StatCounter

Road Item Tenders

Get complete information related to latest Road Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Road Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Road Item Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :38329031 Due date: 23 Dec, 202423 Dec, 2024 9.58 Lacs
Tender For corrigendum : construction of transmission line - pcc poles supply and erection of pre-stressed cement concrete pole of suitable length with a given planting depth confirming to is-1678_1960_1978 below ground level in excavated pit of suitable dimensions complete in all respect as approved by engineer_in_charge at site pcc pole overall length 11 metre , planting depth 1.80 metre , w_l 400 kg pb csr 2020 item no 34.32(iii) , insulators supply and erection of insulators confirming to is_2544 and 5350 (test certificates of cpri) includes supply and erection of nuts bolts and other accessories whatsoever required at site for fixing it to the structure pole. the job is to be completed as approved by engineer_in_charge 11kv pin insulator with gi pin pb csr 2020 item no 34.35(i)(b) , stay sets supply and erection of stay set consisiting of 19_20mm dia.of suitable length gi stay rod duly threaded upto 300mm at one end and shaped on the other end ms plate size 30cm x 30cm x 6mm with 20mm dia hole drilled in the centre of the plate gi stay wire size 7_10 swg , gi thimble for stay binding , egg_strain insulator , ms elbow made out of 16mm plain sheet and a 20cm long piece of 50mm x 50mm x 6mm angle iron made to the shape as approved by engineer_in_charge. stay set complete shall be fixed to the pole by providing suitable size full clamps made out 50mm x 6mm size ms flat with required number of nut and bolts 16mm dia on one end and shall be embedded on the other end. the stay plate shall be covered with cement concrete having total volume of the concrete not less that 0.042cum. the job shall include excavation of pit and back filling and after pouring concrete with excavated soil etc. as approved_desired by the the engineer-incharge stay set consisiting of 19_20mm dia 2.4 metre long gi stay rod pb csr 2020 item no 34.35(ii)(b) , acsr conductor wolf 150mm2 , pole top brackets (galvanised) , v-shape cross arm 100x50mm , half clamp ms flat 50x5 , 11 kv polymeric disc insulators 70kn , danger plate , phase plate (set of 3) , barbed wire , earthing arrangement of 11kv poles , eye screw bolts 9inchx5_8 inch(galvanised) weight 0.483 kg. , nut and bolt ms off size , ms channel 100 x 50 x 6 - 2400 mm (galvanised) for h-pole , belting for h-pole 50 x 50 x 6mm . (galvanised) weight 9.90 kg , bracing for 4-pole 50 x 50 x 6mm . (galvanised) weight 14.49 kg , single tension fitting complete suitable for acsr wolf , pg clamp , full clamp ms flat 50x5 , ms angle 65x65x6 , erection charges

State Government

CTN :38584991 Due date: 17 Dec, 202417 Dec, 2024 6.13 Lacs
Tender For construction work of anicut in village sakhun under campa item under range dudu - ???? ???? ?? ???? ?????? ?? ???????? ????? ????? ??? ????? ??????? ?????

State Government

CTN :38574815 Due date: 21 Dec, 202421 Dec, 2024 NA
Tender For item wise annual rate contract for miscellaneous works of emergent nature related to earth excavation embankment construction and cleaning of lake (addition/ alteration/ replacement/ formation etc) in and around wular lake and within its project area

State Government

CTN :38597763 Due date: 07 Jan, 202507 Jan, 2025 5.42 Crore
Tender For item-1 construction of lig (g plus 2) 48 nos zone-d new rhb scheme near dto office hanumangarh

corporations/Associations/Others

CTN :38592205 Due date: 24 Dec, 202424 Dec, 2024 49.06 Lacs
Tender For construction of box type rcc drain from krishna nagar pochamma temple to h.no:8-3-231/a/66/a/1, at ln nagar in 96-yousufguda division, circle-19, slpz, ghmc (item no.1) (2nd call)

Central Government/Public Sector

CTN :38604270 Due date: 22 Jan, 202522 Jan, 2025 NA
Tender For supply of high current injection kit (1500a),i/p-230v,1 phase,20a(0-5v),1500 amps dc, with necessary display arrangements and milli volt measuring arrangement for 4 digits. makes:technomax/slazer/ megger/ vivid metrawatt or similar note:the item must be in sheet steel enclosure,in proper cooled construction sui table for indoor use in maximum atmospheric temperature of 45 degree centigrade. note: nabl accredited lab calibration certificate should be enclosed with material. [ warranty period: 30 months after the date o f delivery ]

Central Government/Public Sector

CTN :38568434 Due date: 02 Jan, 202502 Jan, 2025 NA
Tender For supply of minimaxes 9.0 lts. cap., nitrogen type fire extinguishers, stored pressure type gross weight 14.713 kg expellant medium: n2 based, minimum discharge time: 15 secs, fire rating: class a:43a and cl ass b: 2233b as per en3-7, applicable on class a,b,c & electrically started fire, bulk rangethrow:minimum 5.3 meter,valve construction:forging and maching, en ped approved ce marked.item to be supplied with 0 6 year warranty cert. make-ceasefire or its equivalent as per annexure 'a'. [ warranty period: 30 mont hs after the date of delivery ]

corporations/Associations/Others

CTN :38560608 Due date: 20 Dec, 202420 Dec, 2024 21.26 Lacs
Tender For construction of rcc retaining wall and providing chain link mesh at h.no.6-3-929/1/a near nasr school, balkapur nala in 91-khairatabad, circle-17, kz, ghmc (item no.01)

corporations/Associations/Others

CTN :38513929 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jari distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jari distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513944 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect
 Loading, Please wait...

Connect us via What's Up