Get complete information related to latest Rod Bolt Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rod Bolt Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rod Bolt Tenders.
Tender For supply of version , fuel tank cap , oil pressure switch , push rod tube seal upper red , push rod tube seal lower black , carbon brush set , fuel filter , air filter , armature for self starter , field coil for self starter , brush carrier , stop solenoid , bendix drive , electronic regulator for alternator , slip ring brush , change over switch 100amp , emergency stop button , canopy light , dc indication lamp , ac indication lamp , fuel cap lock , cutting plier taparia , cable 2 core 10 sqmm , digital panel meter , avr , self starter , dc altenator , fuel pipe 19mm x19mm , green coolant , alternator 12 v assy , bty 12 v 180 ah , lock washer for connecting rod , air cleaner assy , push rod , fuel line from tank to main line -19 x 19- 1.5 mtr long , fuel line from main line to feed pump - 19 x 19- 1.5 mtr long , fuel line from feed pump to filter -19 x 19- 1 mtr long , fuel line from filter to fip - 19 x 19 -1 mtr long , 1.5 sq mm single core copper wire , nrd valve , injector nozzle , delivery holder copper washer , oil filter element , water pump assy , hose pipe set , hose clamp , amp meter , self starter assy , distilled water , cable 4 core 16 sqmm , connecting rodbolt with nut , cylinder liner std , crank shaft oil seal fwe , crank shaft oil seal pulley end , connecting rod small end bush , thrust washer , bumping clerance shim , rotating diode , cylinder head assy , big end bearing , small end bush , rocker assy , inlet valve , exhaust valve , overflow line from filter to tank - 19 x19 - 2 mtr long , overflow line from injector to tank -12 x19 - 2.5 mtr long , pump element , quadrant and sleeve , plunger returning spring , roller assy , fuel filter secondary 1.1 ltr , fuel cut off solenoid and eng stop solenoid 12 vdc , feed pump assy , copper washer 19 mm , oil pressure switch llop 12 vdc , oil temperature gauge , oil temperature sensor , oil pressure gauge 0-10 kg per sq cm 12 vdc elect , oil pipe from main gallery to cyl head , oil pressure benjo bolt 14mm unf , oil pump assy , fan belt avx 13 1265 , radiator cap , thermostat valve , thermostat housing , radiator mounting pad upper and lower , thermostat mounting bolt , bolt with washer 10mm , radiator assy , engine oh gasket set , set of washers , set of joints , ignition switch , connector 4 pole 63 amp , valve grinding paste , air element , k - oil , armature rewinding , exhaust pipe with muffler , fuel overflow pipe , fuel gauge , carbon brush holder , rectifier plet , alternator carbon brush , 4 st relay 12 vdc , self starter bush set , thermostat valve 82 degree , fuel pipe from feed pump to filter 2 feet long 19x 19 , nut bolt 3inch long 17 mm with spring washer , tie pkt 250 mm , dc panel mtg pad , piston assy rb44 std 4 ring version , starter ring , inlet and exhaust valve pair , thermostat mounting stud , oil pressure gauge , fan belt , fuel pipe line , ball bearing 20x47x14 6204z c3 , sleeve for nozzle , oil filler cap , sealing washer for oil filling cap
Tender For supply of fuel filter , timing belt , thrust washer steel , hose fuel return , metal main bearing std , metal set con rod std , packing , filter assy , nut connecting rod , bolt connecting rod , washer , body oil filter , filter fuel assy , piston set , ring set piston new , yoke and sleeve assy , rod push , valve exhaust , guide valve , rod connecting , bush
Tender For repair to drr 2224 sc - drr 2224:- complete overhauling of the engine by way of removing the engine foundation bolts and extracting the engine by crane. dismantling the engine and removing the damaged/ worn out parts. p/f of cylinder lining-4nos., piston assembly along with piston rings-4nos. p/f of big end and small end bearings to the connecting rod, gudgeon pin-4nos., connecting rodbolts along with nut 8nos. p/f of crank bearing, head gasket along with complete gasket set. p/f of timing gear set along with oil seal. p/f of inlet and outlet valves along with valve guide 08nos. p/f of circlip-1set, exhaust valve 4nos. along with springs. p/f of cam shaft bush and cam shaft bearing, rocker arm. p/f of fly wheel ring, complete water body assembly .the job also includes grinding of crank shaft to the required size, fitment of new cylinder liner, setting of crank shaft for free rotation , line boring of cylinder block& fitting of cylinder lining, grinding of cam shaft bush ,fitment of cam shaft, grinding of valve & valve seat to match each other, fitment of valve guides , facing of cylinder head, fitment of small end bush to connecting rod, p/f of oil filter-1 no., fuel filter set-1no., high pressure injector pipe-4 nos., fuel pipe main (fuel tank to feed pump)-01no.,fuel pipe main (feed pump to filter)-01no.,fuel pipe( filter to fip pump) -01no., fuel pipe return (fip to fuel tank)-01no.,pipe oil pressure -01no.,oil pressure gauge -01no., water temp. gauge-1 no., fan belt-1 no. complete assembling of the engine with new parts, testing it and mounting on the machine. p/f of engine sump studs-12nos.the job includes cost of material and labour charges ., drr 2224:- repairs to the 1st inter shaft of the machine by dismantling it from the machine and then removal of damaged/worn out parts cleaning with k.oil and then p/f of new parts i.e 1st inter shaft pinion 9p5- 01no., retaining screw 9p1- 01no., lock washer 9p2- 01no., spiral bevel wheel 9p3- 01no., bearing 9p4- 01no., 1st inter shaft & (pinion integrated) 9p7- 01no., distance washer 9p8- 01no., shim set 9p10-01set, circlip seeger 9p12- 01no. assembling the gear box. testing at site. job includes cost of material, taxes and labour charges as per site conditions.., drr 2224:- repairs to the 2nd inter shaft of the machine by way of dismantling the gear box and removing the damaged parts and p/f of new parts 2nd inter shaft & pinion (integrated) 9p19-01 no, bearing 9p15-01 no., pinion ist and 2nd speed 9p22-01 no., bearing 9p25-01 no. assembling the gear box of the machine.testing at site. job includes cost of material, taxes and labour charges as per site conditions. , rebate on account of old parts (absolute)