Web Analytics Made Easy - StatCounter

Rotary Joint Tenders

Get complete information related to latest Rotary Joint Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Rotary Joint Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Rotary Joint Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

Central Government/Public Sector

CTN :39222847 Due date: 26 Feb, 202526 Feb, 2025 NA
Tender For supply of zoology other lab materials - bottle brush silicone 360 degree moveable , brine shrimp eggs capsules artemia cysts 80 capsules 90-95% hatching rate , butter paper sheet roll (pack of 10sheet) , charger for aa type rechargable battery , cotton crepe bandage 10cm x 4m , counter desk call bell ring, desk bell for reception classic bell (brass or stainless steel) , crystal clear epoxy resin and hardner 1 litre , digital pocket weighing scale with 600g capacity & 0.01g accura?? , duracell alkaline aaa batteries, (pack of 10) , duracell chhota power aa alkaline batteries (pack of 10) , favi seal silicone sealant acetoxy (clear) -neutral for glass , fiberglass top line measuring tape 30m/100ft , fish food floating pellet 2.5mm 1kg , floor cleaner 11 , freeze dried tubifex worms for fish food 250gm , garbage/dustbin polybag (pack of 100) , godrej nav-tal brass - 7 lever - (65mm)-3 keys lock (brass) , hand towel 400gsm , handwash 1l , hang on back/hanging filter pump for aquarium 12 watts , high-absorbency 350gsm microfiber towel cloth (pack of 5) , vaccum cleaner cum air blower , ice chill bucket 3l , insect display box (wooden) , insect entomological pin (pack of 100) , insect/butterfly spreading board (wooden) , lab soft float slip/slipper size-8&9 , led waterproof strip light for plant grower usb type connection (purple) , red-blue spectrum , liquid detergent 11. , live fish seed of koi fish/perch/ anabas (pack of 1000) fry 2.5-5cm , live fish seed of murrel fish / channa/snakehead (pack of 1000) fry 2.5-5cm , lpg gas lighter , magnetic screwdriver set mini precision , magnetic white board 4'x2.5' inch , magnetic white board 4'x5' inch , micropore tape width 1'x length 9m , microsd class 10 microsdxc 64gb memory card with adapter , napthalene balls 500gm , nylon mosquito net , oxygen air pump for fish tank , pendrive 64 gb cz48 usb 3.0 flash drive , pidilite steelgrip multi purpose duct tape all purpose adhesive tape (48 mm x 25 meters) , plankton net , polypropylene plain plastic round with rim blue ghamela 31. tub 12' , power pocket bathroom freshener (pack of 5) , pvc clear transparent plastic curtain l 2.10m x w 3.10m , pvc clear transparent plastic curtain l 2.30m x w 3.80m , pvc clear transparent plastic curtain l 2.35m x w 2.20m , pvc clear transparent plastic curtain l 2.50m x w 2.20m , pvc clear transparent plastic curtain 1. 2m x w 2m , rat kill biscuit 25g (pack of 8) , rechargable aa battery (pack of 4) 2500mah , rechargeable 12 v battery with charger , rexine roll length 10m x width im fireproof stainproof , silicon applicator gun , silicone flexible/soft aquarium , oxygen air pump tube 10m pipe for aquarium fish (3mm) , sink/basin cleaner liquid 11. , sink/basin hard plastic brush , small hand wiper , soil for planted aquarium 1kg , spirit 11. , spray bottle glass 250ml , tcws water test strips , tds meter tester pen type , telescopic fishing landing net , telescopic insect collecting net , thermocool 30mm sheet pkt (pack of 10) , white board duster magnetic , whiteboard boldmarkers pack (set of 6 colour) , workplace institution first aid kit box (pack of 30 items) , frog development part 1 showing stages from egg to gastrulation rexine chart , amoeba binary fission slide , amoeba proteus slide , chick development , chick embryo-16, 18, 24, 27, 28, 30, 33, 43,48, 56, 72, 96 hrs (each on separate chart) rexine chart , development of frog part ii showing gastrula to newly hatched tadpole rexine chart , earthworm: anatomy bio visual chart , feather: structure, types & dev bio visual charts , fowl skeleton rexine chart , frog: anatomy bio visual chart , frog skeleton rexine chart , giant chromosomes slide , identification of poisonous and non- poisonous snakes bio visual charts , meiosis i, all significant stages in one slide , meiosis ii, all significant stages in one slide , menstrul cycle coloured laminated chart , snakes: non poisonous bio visual chart , snakes: poisonous bio visual chart , varan

CTN :39176181 Due date: 11 Feb, 202511 Feb, 2025 2.14 Crore
Tender For custom bid for services - service order for pm of 20nos blt wj as per scope of work -types of servicing:- 1. check the hydraulic oil level in the reservoir. it should be between 'run' and 'high' limit with the bridge loaded. , 2. replace hydraulic oil completely. , 3. check the return line and pressure line filters for clogging indication. , 4. examine the hydraulic pipelines for leakages inside and outside the . , 5. unload the bridge, start the main pump and operate all cylinders in and out. pressurize them to the working pr.(300 bar) and watch for any leakages. leakages on rotary joints should also be observed. 6. put on the master switch and power-on-switch on different control , panels. , 7. start the main pump and operate no.1 and no.2 cylinder to extreme end condition. keep operating the cylinder in the end position. read pi pump pressure. if should be 300 bar. , 8. operate the no.3 or locking cylinder to its extreme position and check the pressure of p2 pump. the pressure should be 280 bar. 9. operate the levers of pvg-32 valve after starting the pump. the levers should move freely. check up all the joints and circlips. 10. start the auxiliary engine and check the rpm setting. it should be 2500. also check, start and stop button for their functioning. 11. remove the air cleaner of the auxiliary engine. 12. check the blower driving belts. , 13. start the auxiliary engine and load the auxiliary pump to 300 bar by operating no.2 cylinder. observe the exhaust of the auxiliary engine. , 14. drain the oil from the reduction gear box of the auxiliary engine. 15. visually inspect the launching mechanism compnents mainly spade, , box, arm for any cracks / deformation (plate / welds). , 16. check the connecting pins of the launching mechanism f r lubrication. for excess play, dsmantle and check for wear. , 17. check the fixing of the rotary joints and the pipe clamps and the limit switches. , 18. check the haunch and the pin on arm assembly for cracks/ , deformation. , 19. check the securing of the trunion pins of no.3 cylinder, the linkage assembly pins and the cylinder mounting pins. , 20. check the rotation of the cylinder no.3 roller for free movements. , , san , -2- , 21.operate the locking cylinder and check the linkages locking the , bridge. , 22. operate the locking cylinder 'in' and 'out' and check the limit switches on the locking cylinder box for their operation, , 23. put the bridge back on the resting pads and see the cone position (alignment). , 24. with the bridge resting on the pads, check the operated condition of limit switches (switch should close). , 25. check the bridge hinge joint for weld cracks and proper securing of the main pins. , 26. check for any damage on top surface of trackways, entry to the bridge (bridge ends), anti-skid strip and 'w' strips (welded , underneath the bridge) for damages. , 27. check the torr ropes and the gudie ropes for their serviceability. , 28. hook the bridge to the launching mechanism and engage the hook of no.3 cylinder with moving crossbeam of the bridge and tighten the , ropes. the moving crossbeam should be parallel. , 29. check the moving crossbeam for any damage / crack. also observe the main pin, slide blocks and bolts securign the sliding blocks. 30. pulley blocks to be checked for weld crack/ deformation. 31. check the pulley and the pin securing them for wear and lubrication. , 32. check the lever connecting the larger pully and also the roller , retaining the rope with the larger pulley. , 33. check the guide pates retaining the rope for its wear / proper unting. , 34. check the end bracings and tube bracings for any deformation / , cracks. , 35. check the beta light markers for any deformation / functioning. 36. inpsect the bridge from underneath for any cracks / rust spot. ii) description of servicing job: , 1.if found low, top up. , (2).replace hydraulic oil completely , 3.if found clogged clean 'or' replace the element. , 4.any leakage noticed should be preve
 Loading, Please wait...

Connect us via What's Up