Get complete information related to latest Safety Gears Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Safety Gears Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Safety Gears Tenders.
Tender For corrigendum : tender for supply of macneill make battery truck - bearing no part no s006147 for macneill make battery truck , oil seal part no 0263801 for macneill make battery truck , drum brake part no 0502301 for macneill make battery truck , brake bacl plate assembly part no 4024900 for macneill make battery truck , dowel pin part no k282118 for macneill make battery truck , oil seal part no s003101 for macneill make battery truck , slotted nut part no m770322 for macneill make battery truck , front axle part no 33868 for macneill make battery truck , steering link part no 0127801 for macneill make battery truck , bell crank lever assy part no 23177 3 for macneill make battery truck , steering gear box part no 3082203 for macneill make battery truck , wheel nut part no m770866 for macneill make battery truck
Tender For supply of speedo cable 3 2 dia 4300 mm long , kit pad assy front , lock assy gate side , ac hose 7500mm , weather strip back door opening seal non metalic , switch assy backup lamp , ibl assembly sreering joint rod , steering universal joint assy , gear box oil seal shaft seal steffa , weather strip back door opening seal non metallic , speedometer head , front wind shild lh , piston ring -draper type er 120 253 d 120mm konig , cable assy clutch
Tender For deequipping and destoring ofinfac t82 - 1 removal of fwd gun mount, qty-01. 1 no 2 removal of aft gun mount, qty-01. 1 no 3 blanking of fwd gun mount post, qty-01. 1 no 4 blanking of aft gun mount post, qty-01. 1 no 5 removal of small arms post- qty-02. 2 no 6 ra for removal of capstan. 1 no 7 blanking for weather proofing post removal of capstan. 1 no 8 removal of soft patches for both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 9 fitment of soft patches post removal of both main engines, both gearbox, fwd da, ac plant. qty 02. 2 no 10 removal/ degutting of both main engine and asd pump. 2 no 11 manufacturing of cradle (mat iron) and box (matwooden) for transportation of main engine.qty - 02. 2 no 12 manufacturing and fitment of dead weight and bilge plates. 1 no 13 removal of both main engine compensator bellow, qty 04. 4 no 14 removal of both main engine fuel water separator, qty 02. 2 no 15 removal/ degutting of both gearbox. 2 no 16 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of both gearbox. qty - 02. 2 no 17 manufacturing and fitment of dead weight and bilge plates for both gear box. 18 manufacturing and fitment of dead weight for both asd - 14 2 no 19 manufacturing and fitment of dead weight for both propellers. 2 no 20 removal/ degutting of ac plant and its auxiliary. list of auxiliaries:- (a) tev (thermostat expansion valve. (b) heat exchanger (condenser). (c) heat exchanger (chiller). 1 job 21 manufacturing and fitment of dead weight for ac plant. 1 no 22 decouple and removal/ degutting of fwd da 1 no 23 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of fwd da. 1 no 24 manufacturing and fitment of dead weight and bilge plates for fwd da. 1 no 25 decouple and removal/ degutting of aft da. 1 no 26 manufacturing of cradle (mat iron) and box (mat wooden) for transportation of aft da. 1 no 27 manufacturing and fitment of dead weight and bilge plates of aft da 1 no 28 removal of hp pump of ro plant. 1 no 29 removal/ de-gutting of ro plant. 1 no 30 manufacturing and fitment of dead weight and bilge plates for ro plant 1 no 31 removal of soft patches for aft da and ro plant. 1 job 32 fitment of soft patches for aft da and ro plant. 1 job 33 removal/ de-gutting of mcs 5 control system with it s auxiliary. list of auxiliaries:- (a) lop 02 (b) junction box 02 (c) rcs 04 (d) ecs -02 (e) throttle lever 04 1 job 34 blanking of patches post removal of mcs 5 control system to maintain weather proofing. 1 no 35 removal/ de-gutting of asd steering control box with accessories and it s auxiliary. list of auxiliaries are as follows:- (a) steering trim indicator 02 (b) main control 1 job page 3 / 13 panel 01 (c) asd controller 01 (d) trim controller lever 02 36 blanking of patches to maintain weather proofing for asd control box system. 1 no 37 removal of halon bottle 2 no 38 removal/ de-gutting of both shaft & support bearing 2 no 39 manufacturing of cradle (mat iron) and box (wooden) for transportation shaft & support bearing. qty 02. 2 no 40 requirement of tractor & trailer for shifting of items from ship to center for 20 days. 20 days 41 transport requirement (01 tonner) for shifting of items from ship to center for serviceability checks, 40 days. 40 days 42 requirement crane with sling (15,10,05,02 and 01 ton) for 40 days 40 days 43 removal of radar vm display, atu and antenna. 3 no 44 removal of existing cables of radar vm. 3 no 45 blanking and fitment of patches to maintain weather proofing 1 no 46 ra for degutting and de-equipping of ecdis display, ups, processor unit and interface unit with removal of cables. 4 no 47 removal of wind speed sensor and its dispaly unit and cables 1 no 48 blanking and fitment of patches to maintain weather proofing 1 no 49 removal of mss mk ii system, antenna and cables. 2 no 50 mk ii blanking of patches to maintain weather proofing. 1 no 51 removal of 07 in number navigation and emergency light. 7 no 52 manufactu
Tender For supply of complete overhauling main clutch unit. complete stripping, lathe & grinding work in main shaft, fitt , complete overhauling of steering system lathe work in main hub, crown cage, grinding and cutting ste , final drive complete removing & refitting sprocket assy, reduction rear, lathe & grinding work in , chains, under carriage track, suspension system lathe & grinding work in idler wheel, track , final drive complete removing & refitting sprocket assy, reduction gear, lathe & grinding work in hu , complete overhauling main clutch unit & hyd booster unit. complete stripping, lathe and grinding wor , chains & under carriage track & suspension system lathe & grinding work in idler wheel, track roller , complete overhauling of steering system lathe work in main hub, crown cage, grinding and cutting
Tender For supply of timing belt nos 01 , timing adjustable bearing nos 01 , water pump assemble each 01 , radiator cap nos 01 , timing belt cover nos 01 , hose connection with clip each 03 , engine oil 15w40 make servo castrol ltrs 05 , gear box stree differential lubricating oil sae 90 ltr 0 point 5 , brake fluid off 24 ltrs 0 point 5 , oil fuel filter element make mico each 03 , gear type oil pump each 01 , oil pump drive chain each 01 , stainer nos 01 , pressure release valve spring ball adjustable screw each 01 , hub greasing comple job 01 , hub oil seal nos 04 , grease castrol kg 01 , wheel balancing and alignment job 01 , servicing of cooling system and cleaning of radiator air , carbon plate set each 01 , brass bush set set of 04 nos set 01 , field coil set of 02 nos set 01 , air filter element each 01 , coolant bottle each 01 , inlet manifold and exhaust manifold packing nos 08 , half seat cover white cloth each 02 , velvet cloth acupressure type mat dari set of 04 nos set 01 , wheel cover set of 04 nos set 01 , steering cover each 01 , rexin cloth foot mat complete set in front and back seats set 01 , clutch and pressure plate assembly complete set 01 , clutch release bearing no 01 , clutch cylinder lower 01 , clutch cylinder upper 01 , clutch wire no 01 , accelerator cable no 01 , fuel hose pipe no 01 , replacement of ignition switch no 01
Tender For supply of housing head light , tail light assy lh , tail light assy rh , lamp incandescent , gear starting ring , hose non metallic , suspension bush kit , damper set , pad disc brake , disc front brake , knuckle steering rh , arm front suspension
Tender For repairing of scania p.380 registration no- jh10an 9605 at antst-jg ocp, lodna area, bccl. - repairing of scania p.380 registration no- jh10an 9605 at antst-jg ocp, lodna area, bccl. , repairing of scania p.380 registration no- jh10an 9605 at antst-jg ocp, lodna area, bccl. job to be done:-1. instrument cluster unit complete checking, repairing, removing fitting with all associated jobs.2- clutch e.c.u. harness complete removing, repairing, checking, fitting with all associated jobs.3- solenoid cable harness complete removing repairing, fitting. 4- complete range sensor harness removing repairing, fitting, tapping with all related jobs.5- complete back light/parking light harness removing repairing, checking, fitting with all related jobs.6- steering gear box complete dismantling and gasket changing, fitting.7- steering gear box top seal removing and changing, fitting.8- steering pump hose removing fitting. 9- steering pump complete dismantling and gasket changing, fitting.10- steering gear wheel bush removing and changing, fitting.11- complete diesel pipe lines removing cleaning, repairing, fitting with all jobs.12- aps ventilation removing and kit changing, fitting and aps dia pharam removing, changing, fitting, setting, air leakage problem rectifying.13- complete aps harness electrical pro-repairing, checking, removing fitting hmr and fuel miter not proper working rectifying., total impact of gst for the purpose of ctc