Tender For fabrication of ms structure for 1400bw bypass conveyor from mini crusher at un crushed yard/chp to jt-19 (priority path-ii/stg-v/ chp) for providing an alternate coal feeding to unit bunkers stage-v(1x800mw) dr.nttps.
Tender For corrigendum : work of pipe laying, fabrication and conveyor support structure strengthening at various location in coal handling plant sikka tps.
Tender For work contract for painting of main steel structure between junction tower-3 (jnt-3) to junction tower-4 (jnt-4) including jnt-3 and jnt-4 structure of conveyor no. 27 a/b, stacker / reclaimer .. ... .....of chp 210 mw atps chachai.
Tender For dismantling of 1200mm conveyor belt structure at 9dip including 2x150kw, 6.6 kv, dual drive unit complete with drive drum,driven drum, two gear boxes, two motors, couplings, bearing blocks, loop take-up unit, tail-end unit, fencings, etc. from 23a d
Tender For supply of structure for 19 meter length conveyor belt , belt bearing dia 45 for 19 meter , 3 hp motor with gear box drum roller idler roller dia 50 , insulated panel insulated wires 10 meter , 1 hp motor with gear box drum roller ideler roller dia 50
Tender For bid to ras supply of structure for 17 meter length conveyor belt , belt bearing dia 45 for 17 meter , 3 hp motor with gear box drum roller idler roller dia 50 , insulated panel insulated wires 10 meter , double scissor trolley 500kg for loading and unloading material from belt
Tender For corrigendum : work of chute puncture and coal leakage attending work in various locations by patch work and repairing of transfer chutes/structure of various conveyor system in coal handling plant, wtps
Tender For providing of bagasse bungas (session 2026-27) - 2025-26 session, the estimated residual loose bagasse—amounting to approximately 38,000 quintals—must be collected at the designated location and stacked in a pyramid-shaped mound. this mound is to be secured using polythene sheeting and ropes to form a square enclosure; additionally, the upper surfaces of the bagasse must be covered with netting. furthermore, a protective structure (*bunga*) is to be constructed around the stack by erecting bamboo posts and covering the assembly with thatch. this structure must be bound securely in such a manner that rainwater is prevented from penetrating the interior, thereby ensuring the safety and preservation of the bagasse. the *bunga* should be designed to accommodate the maximum possible volume of available bagasse. any surplus bagasse currently scattered across the concrete floor—as well as that extending beyond the floor onto the unpaved ground (covering an area of 3–4 meters)—and the bagasse scattered on both the unpaved and concrete surfaces on the opposite side of the conveyor (towards the kharkhoda road) must all be consolidated. this entire quantity of bagasse must be pushed onto the paved floor (specifically in front of the feeding point of the return bagasse carrier) and extended approximately 10 meters further along the paved floor to construct the *bunga*, thereby safeguarding the bagasse against spoilage during the rainy season. all expenses associated with the aforementioned tasks shall be deemed subsumed within the overall cost allocated for the construction of the *bunga*; no separate or additional payment shall be admissible for these activities.