Get complete information related to latest Sealing Tube Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Sealing Tube Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Sealing Tube Tenders.
Tender For supply of detector rack control unit, compatible for the existing 300 kv tem , quad current regulator board, compatible for the existing 300 kv tem
Tender For supply of shunt led signal lighting unit 110v. ac with built in current regulator, retrofittale in existing cls units and compatible with ac led ecr, as per rdso specification :rdso/spn/153/2011, re v.4.1 with latest amendment [ warranty period: 30 months after the date of delivery ]
Tender For supply of led signal lighting unit with build in current regulator retrofittable in existing cls u nit as per rdso specification no. rdso/spn/199/2010 with latest amendment for main signal ? green.{ite m is reserved for rdso approved source only.sub item id-3100194002.} [ warranty period: 30 months a fter the date of delivery ]
Tender For corrigendum : procurement of various led signal units and route indicators and current regulators - led route indicator , led unit violet , led unit green , led unit red , violet led unit for tunnel section , green led unit for tunnel section , red led unit for tunnel section , led signal lighting unit , integrated led signal unit for main red aspect , integrated led signal unit for main violet aspect , integrated led signal unit for main green aspect , red aspect led unit for elevated , violet aspect led unit for elevated , green aspect led unit for elevated , red aspect led unit for tunnel , violet aspect led unit for tunnel , green aspect led unit for tunnel , current regulator for led based signals , current regulator for matrix type , matrix type route indicator unit
Tender For supply of spares of gypsy jk14b 6614 - piston standard 12111m63e60 , piston pin standard 04 nos 1215 30a0 , piston ring standard 12140m63e60 , connecting rod 1216 0c00 , crank thrust standard 12300 60840 , main bearing 0 to 10 12340m82000 , big end bearing 0 to 10 12181m82030 , water body bolt no 10 0910 6066 , oil pump assembly 1610 2a02 , water pump assembly 1740 3010 , valve inlet 1291 1c00 , valve exhaust 1291 1c80 , valve oil seal 12934m68k00 , piston pin lock snap ring 0938 9001 , came oil seal 1273 8l00 , crank main oil seal rear 1134 5m00 , crank main oil seal front 1273 8l00 , cylinder head gasket 1114 6512 , inlet manifold gasket 1311 3f00 , oil pump gasket 1611 2030 , cylinder main plate gasket 1134 0a01 , water body pump gasket 1743 0a20 , timing cover 1139 6a01 , engine foundation 1161 0020 , oil stainer 1652 3003 , oil stainer o ring 0928 4009 , hose radiator inlet pipe 1755081a00 , hose radiator outlet pipe 1786081a00 , radiator hose pipe rubber upper 1784 1a00 , radiator hose pipe rubber lower 1785 1a00 , hose radiator inlet pipe o ring 09280m28008 , radiator assembly 1770 3113 , thermostate valve 176070m83f00 , rear axel cone 4348 3000 , rear wheel cylinder left and right 5340 3301 3311 , engine sealingtube big , front wheel oil seal , front tube knuckle oil seal rubber 0928 0002 , front wheel grease cup 4324 0001 , front brake pipe rubber left and right side 5154 0110 , back light glass , dalla rubber , m s sheet 4x4x18 guage , beta seal tube u 418 , door glass machine right side 8341 20 , door card board , door stopper 8181 0100 , m s flate 1 inchx1 sutter 10 kg , body filler kg pack , door hinges 01 set 6932 0110 6931 0110 , door rubber beading 8465 0121 , front bumper side corner left and right 7174 3302 , bonnet cable 8216 0011 , silver paint 200 gm , dull black paint 500 gm , paper tape , gear box tail foundation 1171 0020 , fuel tank assembly 8910 0a01 , fuel tank rubber hose 8924 3020 bid details/ 2 / 51
Tender For corrigendum : supply of ador welding machine spares - output terminal moulded , potentiometer , toggle switch remote or local , rotary switch , control box assembly , thyristor module , on off switch , input terminal board assembly , regulator assembly , range selector board assembly , thermostat main rectifier , rectifier diode w capacitor set , solid rubber type wheel big , swivel wheel , auxilliary rectifier assembly , igbt module unit assembly for pwm cum driver pcb , pwm cum igbt driver pcb , welding o p terminal strip , welding o p terminal clamp , current and arc force pot
Tender For corrigendum : custom bid for services - repair and maintenance of ac modules dc modules and various pcbs of all departmental drilling rigs of ongc tripura asset-work includes but not limited to supply of men, materials, testing equipment / tools etc for fault finding (trouble shooting), repairing, calibration and functional testing of ac modules, dc modules and various pcbs in e1400 series drilling rigs of tripura asset. broad details of the activities to be carried out are as below: a. following jobs are to be carried out in pcbs i. physical checking of healthiness of components & cleaning of the pcbs. ii. checking of voltages at different points in the pcbs after powered up through simulator. iii. replacement of faulty components, limited to 50% cost of the pcb, to make it operational. iv. calibration of pcbs v. on load testing of 12 hrs. continuous loading for satisfactory operational vi. fixing of pcbs in the respective panels b. following jobs are to be carried out in ac module i. visual inspection of module for any loose hardware & cleaning of the module. ii. checking of circuit by using simulator. iii. checking of over frequency tripping. iv. checking of under frequency level. v. under frequency voltage cut back test vi. idle-run ramp and idle trip test vii. throttle regulation check viii. master slave and command circuits check ix. current demodulator check x. automatic voltage regulator check xi. meter circuit check xii. over voltage trip check xiii. reverse power trip check xiv. frequency demodulator check xv. module panel meter check xvi. replacement of faulty components, limited to 50% cost of the ac module, to make it operational. xvii. on load testing of 12 hrs. continuous loading for satisfactory operational xviii. fixing of ac modules in the generator panel c. following jobs are to be carried out in dc-module i. visual inspection of module for any loose hardware & cleaning of the module. ii. dead band and current limit calibrations iii. zero throttle interlock circuit test iv. firing circuit test v. speed feedback circuit test vi. power limit circuit test vii. slave circuit test viii. manual voltage circuit test ix. over current trip calibration test x. meter circuit check xi. replacement of faulty components, limited to 50% cost of the dc module, to make it operational. xii. on load testing of 12 hrs. continuous loading for satisfactory operational xiii. fixing of dc modules in the dcpcr panel d. following jobs are to be carried out in battery charger i. visual inspection and cleaning of components such as transformer, voltmeter, ammeter, pcbs, rectifier, indication lamps and tightening of loose hardware, if any. ii. checking of tripping logics, dc under voltage, dc over voltage, reverse polarity, ac mains fail, over current, over temperature etc. iii. replacement of faulty components, limited to 50% cost of the battery charger, to make it operational.-msme exemption - no | startup exemption - no