Get complete information related to latest Site Improvements Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Site Improvements Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Site Improvements Tenders.
Tender For upgradation of helipad - site investigation and submitting of detailed designs , site preparation clearance as per technical specification , excavation and rolling of surface , upgradation of helipad as per tech sanction , all finishing work and handing over of the site as per tech sanction
Tender For design installation and maintenance of educational lab - vocational lab; site preparation; buyer -1. provision of water supply, drainage pipeline for chemistry lab "the scope of work includes the design, supply, and installation of a 3/4 water supply pvc pipeline and a 2 drainage pvc pipeline for the chemistry lab, with both pipelines to be laid below floor level in accordance with the relevant standards. the water supply pipeline will be installed to deliver water to six wash basins located at lab tables, with all necessary piping, fittings, valves, and accessories provided to ensure proper water flow and functionality. the drainage pipeline will be installed for the safe removal of liquids from the wash basins, connecting to the existing drain system in compliance with local plumbing codes. the contractor is responsible for providing and installing all required pipes, fittings, junctions, seals, and ensuring proper slope for the drainage system to ensure it functions without leakage or obstruction. upon completion, the installed systems will be tested for functionality, and the floor will be leveled and prepared for tiling, with tiles installed in accordance with the specified quality standards and design. all materials used must conform to the relevant industry standards for durability and safety." 01 job, 2. installation of taps in chemistry lab wash basins "supply and installation of 2 taps per wash basin, located at each of the lab tables 06 nos. in the chemistry lab. the work includes ensuring correct connections, installation of necessary pipework, and verifying water-tightness and functionality of the taps. all components must be of high quality and suitable for laboratory conditions, ensuring ease of use and long-term durability." 01 job, 3. installation of exhaust fan system for chemistry laboratory "supply and installation of an exhaust fan system within the chemistry laboratory to ensure proper ventilation, facilitate the removal of hazardous fumes, and maintain a safe working environment. this installation shall include secure mounting, electrical wiring, a variable speed controller, and protective grills with all necessary arrangements, equipment and accessories." 02 job 4. provision of 3-phase electrical supply for strength of materials/ engineering mechanics lab "provision and installation of a 3-phase electrical supply from the existing mcb board to the strength of materials/ engineering mechanics lab located on the ground floor. this includes the installation of all necessary electrical cabling (4 sqmm /6 sqmm), 63 amp. 2 nos. & 32 amp. 4 nos., 4 pole individual mcb with box, connectors, and circuit protection devices, ensuring compliance with relevant electrical safety standards. the installation must be capable of supporting the lab's power requirements while maintaining optimal operational efficiency." 06 job 5. construction of foundations for thermal lab equipment "design and construction of reinforced concrete foundations to support 2 units of lab equipment (approximate measurements in meters (0.95 x 0.45 x 0.3) and (1.0 x 0.6 x 0.2)) in the thermal lab on the first floor. the specifications of work may evolve during the course of the project and foundations must be engineered to accommodate the weight and dynamic loads of the equipment while ensuring stability and long-term durability. all excavation, reinforcement, and concreting work must be carried out per the specified structural design, ensuring compliance with relevant building codes and safety regulations." 01 job 6. vibration damping foundations for thermal lab equipment "supply and installation of specialized vibration damping foundations (approximate measurement in meters (1.6 x 0.85 x 0.3)) for the morse test lab equipment in the thermal lab located on the first floor. the specifications of work may evolve during the course of the project and these foundations must be engineered to effectively mitigate vibration and noise caused by the o
Tender For custom bid for services - sludge and insulation removal of tank 120 t 05a-1.1. sludge removal: the approximate sludge / oil inside the tank is to a tune of 2800 cu.m. a) agency needs to assess the quantity of sludge through site visit prior to quoting. b) the quantity provided is the best estimate and may vary. please note that additional payments will not be made for excess sludge removed, and no deductions will occur in the event of lesser sludge quantities with respect to the sludge quantity mentioned above. c) approach path from south main road (i.e., from south of the common dyke of tanks 120-t05a,05b,06,06b) up to south west of tank 120-t-05a shall be provided by hpcl. d) however, approaches / access requirement around the circumference of the tank to facilitate sludge removal and insulation removal, the preparation of the same shall be in within agency scope. e) agency has to collect sludge using sludge bins at outside of clean out door. if required, excavation for placing sludge bins matching the elevation of the clean out door has to be done by agency. sludge bins to be mobilized by the agency. f) disconnecting existing electrical connection, temporary dismantling of platform, ladder or any other structural, fire protection system like cooling water connection, foam connection, removal of existing instruments and any other removable or fixed attachment required for isolating the tank is in agency scope. g) removal of existing instruments, accessories etc. provided in existing tanks and preserve the same in designated area as per instruction of job engineer is in agency scope. h) removal of sludge from tank, transfer of sludge to designated area, unloading / dumping of sludge in designated area (sludge lagoons) inside refinery, complete cleaning of the tank after sludge removal, making the tank hydrocarbon free and suitable for further hot work is in agency s scope. contractor to submit sludge removal procedure to hpcl. i) opening / cutting shell course (coupon cutting) for creating access for entry of excavator / jcb inside the tank for carrying out sludge removal. barricading inside tank in coupon cutting area for hot work preparation for coupon cutting is in agency scope. any other preparatory jobs as per jsa for carrying out hot work for coupon cutting and vehicle entry inside tank is in agency scope. j) existing steam coil: agency shall dismantle existing steam coil including supports from the existing bottom plate. k) sacony & propeller mixers: agency shall dismantle existing sacony mixers & propeller mixers. l) wherever existing internals are removed like sacony mixers / eductors / propeller mixers / jet mixers / heating coils etc., care shall be taken not to damage the bottom plate during removal of supports. m) all necessary work related to isolation of tanks to carry out sludge removal including removal of piping spools including tagging and dumping in the designated yard, blinding of nozzles, proper barricading required shall be in contractor s scope and shall be carried out as per instructions of job engineer. n) transportation and dumping of all scrap materials generated during modification works, after cleaning, in the designated scrap yard as per instruction of the job engineer. o) arranging of all equipment, tools & tackles, machinery, lifting equipment, mobile crane, fork lift, crane, jcb, tipper, trailer, scaffolding etc. is in the scope of the agency.-msme exemption - no | startup exemption - no
Tender For certain maintenance work under ge east jabalpur - m & l for painting carefully (by taking necessary shut down from respective sub-station) on steel tubular poles 9 m high from (above grnd 7.5rm) upto top of the pole, including cross arms, bracings, clamps, cable protection pipes, street light clamps & pipe (fix to poles) with two coats of 1st quality aluminium paint after preparation of surface by wire brush and painting with two coats of synthetic enamel paint, after preparation of surface with different colour code from ground level to 1.0 m high with writing pole no. of suitable size of letters as directed. note : size of lettering and colours of paints will be directed by engr-in-charge., m & l for painting carefully (by taking necessary shut down from respective sub-station) on lt pcc pole 9 m high from (7.5 metre above natural ground ) upto top of the pole, applying two coats of cement base paint over a coat of alkalines resistant primer to surface of concrete pole with cement based paint after preparation of surfaces of poles including cross arms, bracings, clamps, cable protection pipes, street light clamps & pipe (fix to poles) with two coats of 1st quality of synthetic enamel paint, after preparation of surface with different colour code from ground level to 1.0 m high with writing pole no. of suitable size of letters as directed. note : size of lettering and colours of paints will be as directed by engr-in-charge., diasmantling of acsr or aac conductors of any size from lt poles or distrubution span of complete all as specified & directed., fixing only binding from disc/shackle/loop insulator etc and rebinding after tightening/restringing of aacsr/aac/lt over head conductors of any size with and including 14 swg binding wire and testing, complete all as specified & directed., m&l for acsr conductor lt (6 in 1) weasel type ,restringing and fixing it properly in between poles and connecteing it with insulator properly all as per required and directed by engg in chrge, dismantling gi wire of any size from lt poles or distribution span & removal from site, complete all as specified and directed., fixing only binding from disc/shackle/loop insulator etc and rebinding after tightening/restringing of galvanised steel wire 3.15 or 4 mm dia lt over head earth wire, complete all as specified & directed., m&l for over head galvanised steel wire 3.15 or 4mm dia on existing lt poles and stretching and then strengthening including binding & jointing the conductor and testing complete all as specified and directed., m & l for danger notice plate of 1.6mm thick mild steel sheet, vitreous enamelled white, with letters, figures and conventional skull and bones in signal red colour and fixed with m.s. clamps, bolts and nuts of approved size, for lt, 20x15cm size complete all as specified and directed., dismantling old unserviceable insulators of any type including ms spindles, gi washers, nuts etc and s&f shackle type, porcelain, vitreous, white/brown or green insulator including galvanised mild steel straps(31x5mm), two gi washers & one gi nut, 100 mm height and 115 mm dia(max) suitable for working pressure 1100 volts grade, complete all as specified and directed., s&f pvc separator 2 way for lt overhead electric line complete all as specified and directed., s&f pvc separator 4 way for lt overhead electric line complete all as specified and directed., supply and fix, erection steel tubular swaged poles type 410 sp-31 (9 meter long), painting with two coat of aluminium paint over one coat of red oxide primer and marking pole nos with black sythetic enamelled paint including tarring one coat of steel surface embedded in concrete complete excluding earth work and pcc work and taking out old unserviceable lt pole complete all as specified and as directed., dismantling lt steel tubular poles and setting aside for re-use within 50 metres complete all as specified and directed.