Get complete information related to latest Smoothing Reactor Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Smoothing Reactor Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Smoothing Reactor Tenders.
Tender For supply of 3 phase induction motor suitable for smoothingreactor cooling blower (mvsl) conforming to rdso spec. no. e/10/03/08 (revised) sept. 1995 with amendment no. 1 & 2. and clw specn. no.clw/es/b-14/c .
Tender For corrigendum : tender for supply of extension panel for unit service switchgear 3a&3b , extension panel for turbine valve mcc unit3 , modification in dcdb unit3 , modification in emergency mcc unit3 , extension panel for unit service switchgear 5a&5b , extension panel for turbine valve mcc unit5 , modification in dcdb unit5 , modification in emergency mcc unit5 , mandatory spares -annexure-e , site modification charges-annexure-f , numerical relay commissiong charge-annexure-g
Tender For supply of shutter for smoothingreactor used in g-7 loco specification- clw drg no.05/1/50/441 al t- 7, item 2 clw spec.no.-m/el/20/ts-1 [ warranty period: 30 months after the date of delivery ]
Tender For supply of smoothingreactor bracket fixing block as per drawing no. elw/bsl/4/f72.188. [ warranty period: 30 months after the date of delivery ]
Tender For supply of modified protection plate for smoothingreactor (sl-30) as per drawing no. trs/hwh/el-425 /07 [ warranty period: 30 months after the date of delivery ]
Tender For biennial contract of house keeping and equipment cleaning at pragati power station 1 for two year. - 1st year housekeeping at pps-1, clng entire flr area gt#1& 2, dustingclng wall door window gt#1&2, clng drain & road around gt#1&2, mopping of floor of gt s& washing road, clng of roof of gt#1& #2 building, dusting clng structural member gt#1&2, clng entire flr area gbdpu, dustingclng wall door window gbdpu, dusting clng structural member gbdpu, clng entire flr area gt & lt trs bay, dusting clng wall door & window trs bay, clng road drain around gt & lt trs bay, washing flr & road s around trs, dusting clng structurl membr gt< trbay, clng entire ground area dsb, dusting wall door window dsb, clng road & drains dsb, washing flr area & roads dsb, cleaning of roof of dg set buildung, cleaning visitor room & x-ray floor area, dusting / cleanings of doors, windows, g, cleaning of drains and roads, cleaning of roof, cleaning the ground & first floor area, dusting / cleanings of doors, windows, g, cleaning of roof, clng entire flr area awb, dusting clng wall door & window awb, clng drains & roads around awb, cleaning of roof of washer building, dusting clng structural member awb, cleaning of drains &.roads, clng drains & roads around s&m, washing roads around s&m, clng entire ground flr area hrsg i&ii, dusting clng structural hrsg i&ii, clng drains & roads around hrsg i&ii, washing roads around hrsg i&ii, clng entire flr area gar gt#1&2 hsd, dusting clng wall door & window gar gt, clng drain & road around gar gt#1&2 hsd, clng entire flr area & washing ff cooler, clng pipe road around ff cooler, clng structural member ff cooler, clng entire flr area gcs gt#1&2 & stg, washing/dusting / cleaning of railings, clng drain &.road around gcs gt#1&2 stg, clng entire flr from gf-3rd flr bfp bldg, clng structural members bfp bldg, clng drain & road around bfp bldg, cleaning of roof of bfp building, clng entire flr area comp house acw ecw, clng drain road around comp house acw ec, cleaning of roof of compressor building, clng entire flr area stg hall bldg, dusting clng structural member stg hall, clng ccr flr area ddc/das/ups room, clng stg flr area i/c switch gear room, cleaning of roof of stg operation, clng entire flr area mcc room, dusting clng structural member mcc room, clng entire flr area inergen gas room, clng of roof of inergen gas room, clng drain & road around o&m store, clng entire flr area gf, dusting clngs door window ceiling gf, clng entire flr area 1st flr, dusting clng door window ceiling 1st flr, clng entire flr area 2nd flr, dusting clng door window ceiling 2nd flr, clng entire flr area 3rd flr, dusting clng door window ceiling 3rd flr, clng entire flr area 4th flr, dusting clng door window ceiling 4th flr, cleaning of roof of facility building, cleaning with broom / brush and scrubbin, clng equipments mcr, clng steam flr & equip on flr, clng tac gt#1&2 aop & oth equip, clng off base skid & other equip, clng gas turbine compartment gen ex, vent fan & its motor airpress gt#1&2, clng dg set & its switchgear room, clng air washer pp motor & pipes v/v, hpbfp lpbfp cphrc pp & its auxiliaries, swass panel mcc panel chemical dosing pp, cleaning of ecw overhead tank etc, ecw acw pp & air compressor dryer, seal airfas both guillotine gate & equip, diverter damper actuator, hp & lp feed station pipe & v/v, cbd & ibd tank connecting pipe & v/v, cw pps & its skids connecting pipe v/v, hsd/ naphtha skid, hsd/ naphtha unloading pp pipes v/v, toilet cleaning, housekeeping of control room area round, emergency work beyond working hrs, waste oil cleaning and removing,collecti, daily supervision of work, iind year housekeeping at pps-1, clng entire flr area gt#1& 2, dustingclng wall door window gt#1&2, clng drain & road
Tender For supply of set of programme switches consisting of 1) hph to siemen's new order no. 2 50-2yw 007 whph =1no, 2) hvsl1 to siemen's new order no. 250-2yw 007 whvsl1 =1no & 3) h vsl2 to siemen's new order no. 250-2yw007 whvsl2 =1no as per clw's spec no. clw/es/s-1/y for transformer oil pump and smoothingreactor blower motor specn: clw's spec no. cl w/es/s-1/y for transformer oil pump and smoothingreactor blower motor. [ warranty p eriod: 30 months after the date of delivery ]