Tender For supply of clip assembly for wheel set earthing equipment for lhb type coaches to rcf drawing no. lw71240 alt a and conforming to rcf specification no. edts 101 rev-c, amendment-2, corrigendum-7 of october 2022. [ warranty period: 30 months after the date of delivery ]
Tender For supply of set of earthing equipment kit consisting of 3 items as per confirming to rcf specn. edts 101, rev. c, amndt. 1, corr.- 6 dt. 04.02.2020. (i) earthing cable drawing no. lw 71249 alt-nil qty per kit 02 nos. (ii) earthing cable drawing no. lw 71248 alt- nil qty per kit 06 nos. (iii) earthing registor drawing no. lw71246 alt- nil qty per kit 06 nos. [ warranty period: 30 months after the date of delivery ]
Tender For supply of wheel set earthing equipment complete for lhb type coaches to rcf drg. no. lw71231alt-f and conforming to rcf spec. no. edts 101, rev-c, amdt-2 and corrigendum-7 and rcf/el/0017 rev-b(2020) [ warranty period: 30 months after the date of delivery ]
Tender For supply of wheel set earthing equipment to rcf spec.no.edts 101,rev-"c" amendment -1,correction 6 , annexure. 1 [ warranty period: 30 months after the date of delivery ]
Tender For supply of wheel set earthing equipment to rcf spec.no.edts 101,rev-"c" amendment -1, correction 6 , annexure. 1 [ warranty period: 30 months after the date of delivery ]
Tender For supply of wheel set earthing equipment sub-assemblies in set consisting of following items: (1) isolating bush as per rcf drg. no. lw 71244, alt-latest, qty- 10 nos. (2) bracket as per rcf drg. no. lw 71247, alt-latest, qty-02 nos. (3) spring for cover of wheel set earthing housing as per rcf drg. no. lw 71250, alt-latest qty- 01 no. (4) cover hinge tube for earthing brush assembly as per rcf drg. no. lw 71253, alt-latest qty- 01 no. (5) cover pin for wheel set earthing equipment as per rcf drg. no. lw71254, alt-latest qty- 01 no. (6) o-ring of dia. 140x2 mm of material: neoprene rubber, qty- 02 nos. (7) o ring of dia. 30x2 mm of material: neoprene rubber, qty- 02 nos. as per rcf specification no. edts 101, rev. c (latest) [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : tender for work of erection of bay equipment, cr panel, control wiring, earthing etc at 66kv varahi sub-station under deodar division of palanpur circle
Tender For supply of cover for wheel set earthing equipment for lhb type coaches drawing no. : rcf drg. no. lw71234 alt.-'c' matl. & spec: as per drawing. [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : maint and repairs to bldg, equipment earthing system, lightning protection system, dbs, lt switch gears along with connected items at afs bidar