Web Analytics Made Easy - StatCounter

Stone Masonry Tenders

Get complete information related to latest Stone Masonry Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Stone Masonry Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Stone Masonry Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :38546421 Due date: 20 Dec, 202420 Dec, 2024 NA
Tender For r/o rain/snow damages to fis shitatan in gp dhankher in spiti valley distt l&s(hp)(sh:-c/o rr stone masonry from kuhl rd450/0 to 200=200m)

State Government

CTN :38546422 Due date: 20 Dec, 202420 Dec, 2024 NA
Tender For r/o rain/snow damages to fis shitatan in gp dhankher in spiti valley distt l&s(hp)(sh:-c/o rr stone masonry from kuhl rd 200 to 390=190m)

State Government

CTN :38546424 Due date: 20 Dec, 202420 Dec, 2024 NA
Tender For r/o rain/snow damages to fis ralangpa in gp kungri in spiti valley distt l&sh.p)(sh:-c/o r.r stone masonry kuhl from rd 0 to 58-58mtrs)

State Government

CTN :38546425 Due date: 20 Dec, 202420 Dec, 2024 NA
Tender For r/o rain/snow damages to fis ralangpa in gp kungri in spiti valley distt l&sh.p)(sh:-c/o r.r stone masonry kuhl from rd 58 to 116-58mtrs)

Central Government/Public Sector

CTN :38598501 Due date: 13 Jan, 202513 Jan, 2025 7.76 Lacs
Tender For provn of stone masonryretaining wall for safety of mes structure near ph no 2 building no t 61 at chakabama military station under age i zakhama

State Government

CTN :38580631 Due date: 13 Jan, 202513 Jan, 2025 2.57 Lacs
Tender For epoxy grouting in base and wall at basement of lifts of service building and boiler area and repair and maintenance work at chlorination room of ph-iv at stps, sarni.

corporations/Associations/Others

CTN :38585847 Due date: 02 Jan, 202502 Jan, 2025 1.36 Crore
Tender For providing and laying non shrink grouting material, yard work of micro levelling, yard pcc, metal spreading, weedicide, foundation grouting etc. at various 66kv substations for the year 2024-25 under anjar tr circle

Central Government/Public Sector

CTN :38563503 Due date: 23 Dec, 202423 Dec, 2024 NA
Tender For strengthening and pcc grouting work in column of discharge base, drive head and tail end base frame of tc - 1, tc - 2 and tc- 3 belt conveyor of pandavpara mine.

corporations/Associations/Others

CTN :38513929 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s jari distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s jari distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect with com

corporations/Associations/Others

CTN :38513944 Due date: 21 Dec, 202421 Dec, 2024 8.66 Lacs
Tender For supply of material and erection for installation of additional 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj in business plan 2023-24 on semi turnkey basis under edc-i, prayagraj - supply, carriage & erection of materials for installation of add. 5 mva t/f at 33/11 kv s/s karchana distt. prayagraj, a- supply of de-centralised materials, control cable 4x2.5 mm2, control cable 2x2.5 mm2, 11 kv cable jointing kit 120 mm.sq., 11 kv cable jointing kit 185 mm.sq., rabber matting, earth wire clamp for pcc pole, stay clamp for pcc pole, top channel clamp for pcc pole, dropper channel clamp for pcc pole, g.i. strips of size 35x6 mm, g.i. strips of size 50x6 mm, g.i. pipe 2" dia, b- carriage of following material, pcc pole 8.5 mtr. long-2 no., structure of la, isolator, 33 kv cts, single t/f control pannel, 1 no.11 kv outgoing and 1 no. incoming pannel, battery & battery charger and 33 kv vcb etc., c- erection work, construction of complete t/f plinth size 3mx3m x1.05 mtr. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation made as per drawing.) top of plinth is to be c.c. work in the ratio of 1:3:6 fitted with 3 mtr. long, 90 lbs, 2nos. rail pieces. cement mortar is to be used in 1:3 ratio. cement, concrete material, bricks used in plinth shall be supplied by the contractor. 6 stone grit is to be laid before foundation start for whole plinth. except rail pieces all material shall be provided by the contractor ., erection of complete structure and 33 kv bus isolator in switch yard as per respo drawing. work also includes construction of plinth of size 0.45x0.45x1.0 cum with cement,coarse sand and ballast in ratio 1:3:6 and plastaring of plinth with cement & sand in ratio 1:4 including digging of pits & backfilling. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of complete structure and 33 kv lightening arrestor in switch yard as per respo drawing. work includes erection of 3 nos.33 kv lightening arrestor, its fitting and mounting with care. grouting of structure with cement, coarse sand and ballast in ratio 1:3:6, construction of plinth size 0.45x 0.45x0.90 cum. plastering the plinth with cement mortar with cement and sand in ratio 1:4. all concreting material like cement, ballast, sand labour & t&p etc.shall be provided by the contractor., erection of 33 kv post insulators with complete structure in switch yard as per respo drawing. work includes installation of 1x3 nos. 33 kv post insulator on structure complete as per schedule, grouting of structure with ist class brick ballast in the ratio of 1:3:6, plastering in the ratio of 1:3 on plinth size 0.45x0.45x0.90 cum. the work is to be done strictly as per respo drawing. all the material like post insulator cap, cement, concrete material used for above work will be provided by the contractor., erection of complete 33 kv vcb with structure 0.7x0.7x1.0 cum. (0.3 mtr. above the ground level and 0.75 mtr. deep foundation or made as per requirement.) in switchyard and grouting of vcb structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of vcb on structure carefully with making all connections of control cable for operating the vcb . all other item like cement, concrete material, t&p shall be provided by the contractor., erection of complete 33 kv c.t (03 no) with structure (0.45x0.45x0.90) cum. in switchyard and grouting of c.t. structure by cement, sand, brick ballast mortar in ratio 1:3:4. work includes complete fitting of c.t. on structure carefully with making all connections of control cable . all other item like cement, concrete material, t&p shall be provided by the contractor., installation of 11 kv single transformer control pannel, 1 no. incoming and 1 no. outgoing in the switchgear room and grouting the pannel by rag bolt using cement, sand mortar in ratio 1:3. work includs fitting of all accessories in all respect
 Loading, Please wait...

Connect us via What's Up