Get complete information related to latest Stool Sale Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Stool Sale Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Stool Sale Tenders.
Tender For snack table knob assembly to lgds drawing no.c&w/lgd.sk.no.1068 alt.1". note:-sample to be got approved by the consignee before bulk supply [ warranty period: 30 months after the date of delivery ]
Tender For supply of snack table assembly for lhb ac 3 tier economy coaches. colour shade is ivory with granular, as per rcf drg. no. ed64004, alt.c. [ warranty period: 30 months after the date of delivery ]
Tender For supply of snack table assembly for lhb/ac 3 tier economy coaches as per drg. no. ed64004 alt. [ warranty period: 30 months after the date of delivery ]
Tender For supply of snack table assembly for lhb ac 3tier economy coaches. colour shade is ivory with granular, as per drawing: ed64004 alt b, follow corrigendum to spec.no. mdts-26381 rev.0 as per design lno. md35131 dated 10.02.2023., as per drg.no. ed64004 alt b specn:mdts-26381 rev.0 [ warranty period: 30 months after the date of delivery ]
Tender For supply of snack table assembly for lhb ac 3 tier economy coaches. colour shade is ivory with granular as per drg. no. ed64004 alt c or latest. material & specification: as per drawing. [ warranty period: 30 months after the date of delivery ]
Tender For supply of snack table with bottle holder for 2 tier & 3 tier of lhb coaches. drawing: rcf drawing no. lw64218, alt.-g. matl.& specn : as per drawing. [ warranty period: 30 months after the date of delivery ]
Tender For supply of snack table assembly with bottle holder for non ac- l h b chair car drawing.-judw/mech/21-747 alt nil,items 1to11 ( lh-50% & rh 50%). [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : supply of snack table for train18 as per drawing no: ,s.c.r. / c&w sk no. 1288/c [ warranty period: 30 months after the date of delivery ]