Tender For up-gradation and strengthening of infrastructure (sewerage) internal and external stormwater drainage, construction of roads, electrification and 15 mld cetp industrial sector-21and26, bhiwani (revised) - up-gradation and strengthening of infrastructure (sewerage) internal and external stormwater drainage, construction of roads, electrification and 15 mld cetp industrial sector-21and26, bhiwani. `making connection of hdpe pipe by providing and laying of 710mm dia and 500mm dia rising main hdpe pipe pn-6 from disposal works to existing hdpe pipe of stormwater and sewerage near stp of nagar nigam through railway track (lc no. 88) toward tosham road and construction of truss bridge on balasmand distributory in industrial sector-27and28, hisar and all other works contingent thereto` (including three years maintenance and defect liability period free of cost)
Tender For drilling of 6 1/2 dia bore well, submersible pump set, laying and jointing of hdpe pipe line, etc work in road.no.25 park, near honble chief minister new camp office, circle-36, jubilee hills,khairtabad zone, ghmc
Tender For supply of sitc of acb panel , dismantling section of the existing 800 a bus trunking , rerouting and reinstallation of a section of bus trunking , supply and fixing 3 mm thick ms sheet , supply and fixing mechanical interlocking arrangement with lockable trip push button key , making necessary modification in the existing 800 a main lt panel bus bar arrangement , supply , fixing, testing of multifunction meter , supply and fixing led type ryb indicating lamps , dismantling the existing apfc panel , supplying and fixing fire retardant electrically insulated, synthetic mat , sitc of 4.5 kg co2 type fire extinguisher , sitc of 5 kg dcp type fire extinguisher , supply and fixing of gi fire buckets , providing and laying 6mm thick ms chequered sheet , complete painting of the existing rusted chequred plates , preparing the single line diagram of 2x400kva ht substation , supply and fixing the signage , removing the sand in fire buckets , supply and fixing 18 w, 4 feet led batten tube light fitting , complete cleaning of the existing substation room , supplying and fixing 15 or 16 a switch and 6 pin 15 or 16 amp socket outlet on metal box , supplying, installation including suspension, testing and commissioning of 800 amps bus trunking , supplying of 3.5 c x 400 sq.mm cable , supplying of 3.5 c x 300 sq.mm cable , laying of one number pvc insulated power cable in existing pipe , laying of one number pvc insulated power cable in existing masonry duct , laying of one number pvc insulated power cable on surface of wall , supply, fabrication and erection of ms cable tray , supplying and laying of 200 mm dia dwc hdpe pipe , providing and fixing earth bus of 50 mm x 5 mm copper strip , providing and fixing braided copper of equivalent size of 25mm x 5mm strip , earthing with copper earth plate 600 mm x 600 mm x 3 mm thick , providing and fixing 25 mm x 5 mm copper strip in 40 mm dia g.i. pipe , providing and fixing 25 mm x 5 mm copper strip on surface , supplying and making end termination with brass compression gland for 3.5 x 400 sq. mm cable , supplying and making end termination with brass compression gland for 3.5 x 300 sq. mm cable