Tender For bid to ras corrigendum : supply of dc jacking oil pump starter cabinet (for 90kw motor) as per drg: 41811901028 , dc seal oil pump start er for 22kw (170a) motor as no. 41811901031 , dc emergency lube oil pump starter for 29 kw motor (2 step starting) as per drg 41811901025 , generator instrumentation cabinet(gic) var03, for 800mw machine as per drg no 41811901032 , mandatory spare of instrumenta tion cabinet as per details in drawing) no. - 418119g9502
Tender For corrigendum : supply of for f1 selector sil , piston head disc for break cylinder , gasket kit for d1 emergency valve , gasket kit for va1b valve , gasket kit for mu2b selector , gasket kit for auto drain valve , gasket kit for c3w distributor valve of wdg3a locos , weather strip side , weather strip top horn , diaphragm horn dual tone , gasket 18 swg system water cooling , victaulic couling 3 inch flexible pipe coupling , gasket coupling , coupling 3inch dresser , gasket armoured 3inch , gasket rediator header , gasket armoured 1 by 2inch , gasket armoured , gasket armoured 1 by 4 inch , coupling 1inch dresser , dresser coupling , dresser coupling 3 by 4inch long compressor and exhaust unit , gasket lp cylinder head , gasket lp cylinder cylinder liner , gasket top cylider liner to block , gasket center or bottom cylinder liner to block cylinder head to block , gasket elbow to block , gasket elbow to head cylinder head , grommet push rod sleeve , gasket elbow to cylinder , gasket elbow to cylinder head piping lubricant oil , dresser 2 1 by 2 inch pipe strainer to base piping water , gasket branch pipe to header , gasket branch pipe to cylinder head , gasket pipe to pump , gasket pipe to cylinder block , gasket elbow to pipe and after cooler , gasket pipe to after cooler exhaust manifold , gasket manifold to cylinder head auxiliary generator and exciter , o ring between auxiliary generator to flange , gasket palm hose for brake hose pipes , after cooler gasket , gasket for lac support to lac assly , gasket inspection floors , large after cooler gasket , gasket to water pump and water inlet pipes , gasket for fttm blower , o ring 1inch od , rubber block for flexible coupling , o ring tube to cylinder head , gasket cover to base , gasket cover to lube oil filter drum , gasket kit for autodrain valve , gaket kit for c3 distributor valve , gasket armoured 1by4inch , gasket lp cylinder , weather strip top , gasket kit for vcd , gaket kit epg , gasket kit horn magnet valve , gasket kit for feed d24 b valve set , gasket center or bottom cylinder liner to block , rubber part kit for d24b feed valve , rubber part kit for n1 reducing valve , gasket kit for angle cork , mu washers , fuel oil filter gaskets , inchoinch ring for split flange , oil seal for water pump , oil seal for after cooler blower , strainer o ring , primary fuel filter gasket rubber
Tender For ttps operation circle mpm i unit i complete dismantling of mill 1f and reassembling the dismantled spares in mill 1b - draining of mill gearbox oil completely, cleaning the gearbox internals like worm shafts and worms wheel. after inspection filling the gearbox with new/old oil including devolution of old oil to stores etc, (department vehicle will be provided for drawl of oil at free of cost)., charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc., charges for dismantling the worn out rubber element in the mill motor coupling, cleaning inspection and replacement of new rubber element and checking the tightness of coupling including cost of consumables etc.,, charges for dismantling the spool pieces, multiple port outlet bodies and transition pipes 4 nos. each after assembling the coal pipe inspection with center feed pipe structures., charges for removal of orifice 1 no. after dismantling the victaulic coupling., charges for removal of mill journal doors including lead, lift and transporting of materials fromstores and devolution of scraps from site to stores and cost of consumables such as welding electrodes, gas, cotton waste etc.,, charges for removal of journal with trunnion assembly in the mills including lead, lift and transporting of materials from mill repair bay to mill floor and back, devolution of scrap to stores and cost of consumables such as welding rod, cutting gas, cotton waste etc., charges for changing of bowl extension ring (6 nos) per mill including lead, lift and transporting of materials from stores to mill floor and back, charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples., charges for providing wedges between lower skirt and mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. lowering the thrust bearings and reassembling of all the above parts, charges for lifting the vertical shaft along with worm gear and worm wheel from top of the gear box and place it in stand. dismantling the worm wheel hub lock nut and removal of worm wheel from the worm hub by steam/induction heating. inspection of upper redial bearing and renewal if necessary., charges for dismantling and removing worn out thrust bearing of mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft., charges for removing the thrust bearing adopter (worn out) and assembling the new adopter by heating, charges for removal of seperator body along with classifier assembly. inner cone mill outlet plate and venturi dismantling the air inlet housing after segregating from hot air duct placing in appropriate place. dismantling the bowl with bowl hub and separating the bowl hub from bowl and in filling the same., charges for dismantling of upper skirt assembly, lower skirt assembly, mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of mill bottom cover, upper bearing housing cover, oil seals etc.,, charges for dismantling the triangular liners, cutting the bulged mill bottom plate, applying refractory cement at the mill bottom plate 1 set by providing bolts and welding., charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing., charges for changin