Web Analytics Made Easy - StatCounter

Submersible Pump Item Tenders

Get complete information related to latest Submersible Pump Item Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Submersible Pump Item Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Submersible Pump Item Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :43497106 Due date: 21 Jan, 202621 Jan, 2026 NA
Tender For providing and fitting of horizontal pump set 2900 rpm head 1275 lpm discharge ,pannel board,making suction and laying of ms pipe line 150mm dia at amel lis.

Central Government And Public Sector

CTN :43486963 Due date: 29 Jan, 202629 Jan, 2026 NA
Tender For supply of r type gasket for stainer 3221 , r type gasket for stainer 3496 , r type gasket for trap 3231 , rir type gasket for oprd nrv , r type gasket for bearing cooling line stainer 3211 , rir type gasket for valve , cg type gasket for av 3211 , rir type gasket for mod cover gas system nrv , r type gasket for nrv 7922 , rir type gasket for nrv 3671 , r type gasket for mod for terminal box 3211 , r type gasket , rir type gasket for gate valve 3211 , rir type gasket for gate valve 3211 inner ring , r type gasket for cv 3211 , cg type gasket for mod pump discharge flange , cg type gasket for mod pump suction flange , cg type gasket for mod pump , cg type gasket for mod pump suction flange dimension 20 nb , cg type gasket for mod pump suction flange dimension 25 nb

CTN :43236648 Due date: 27 Jan, 202627 Jan, 2026 NA
Tender For corrigendum : tender for supply of flexible hose h.p. feed inlet brine outlet , hp hose 3-8id 1-2unfmx1-2unffx800l , high pressure hose module outlet , hp hose of module in , hp module in out hose , h.p. hose module 1 to module 2 , hp hose raw water-brine 2500l , hp hose sea water distribution manifold of dt module , hp hose 11-4 idx11-4 vicx5000l saf , lp hose hp pump inlet , hp hose discharge hose to dt manifold spool , hp pump motor pulley 4s , pulley for motor 2 groove , pulley for pump 2 groove , taper bush 1610 20 mm bore , taper bush for motor pulley , hp pump taper bush , high pr. pump driving belt , h.p. pump driving belts - 2 set , v belt , filter and permeate pump bearing 2z 6201 , motor bearing prefilter pump de , bearng h.p. pump , av mount for hp pp , av mount akcc 85m , mount for permeate transfer pump-filter pump , av mount akcc 40m , av mount for pk20 , hp pump crank case oil , open spanner 50 mm , torque spanner 50-225nm , pulsation damper charging kit , pvc solvent cement 500 ml , jubilee clips for d 25 , ss jubilee clips for dn 32 pipe , ss jubilee clips 2x 45 mm to 60 mm , support gravel 0.75 - 1.5 mm , support gravel 3.0 - 5.0 mm , sand sup. fine 0.3 - 0.7mm , cleaner for membranes 11 , membrane cleaner 22 , membrane cleaner 33 , membrane solution 44 , h.p. connection - feed-brine , adaptor for hp discharge ro 1530 , 1-4 fxpu4 elbow , pressure switch , high pressure pump driving belt set , h.p pump driving belt , hp pump driving belt set , spare kit pvc- d32 , abs service kit ro 200/102 , abs service kit ro 0510 , abs service kit - 40 tpd , abs service kit hp pump inlet ro 1530 , abs service kit for cartridge filter ro 1530 , e-spare kit ro 0510-510 , sensor cable with probe new version , impeller , spare kit d32-pvc , abs service kit , straight connector 3-8 , h.p.pump crankcase oil , allen key set , e-spare kit ro 1530 , hp pump valve seal kit , disc tube module

CTN :43501733 Due date: 19 Jan, 202619 Jan, 2026 NA
Tender For supply of main clutch lever key , reverse fwd lever key , water screen radiator , hyd tank screen , fuel tank screen , cap assy , drain valve , seal oil , needle , lamp charge , dash lamp , plug grease discharge , gauge oil lever , magnet filter , horn , techo hrs meter , fuel pipe , air filter inner , air filter outer , fan belt , fuel fitler , oil filter , hyd filter , bulb 12 volt , accelerator cable , teeth , teeth nut and bolt , feed pump assy , fuel tank cap , hyd tank cap , temp gauge water , oil temp gauge

CTN :43486678 Due date: 17 Jan, 202617 Jan, 2026 NA
Tender For supply of water pump assy d d--pump assy water , alternator belt , vane pump assy , rear wheel bearing , discharge hose , power steering filter kit

CTN :43268147 Due date: 10 Jan, 202610 Jan, 2026 NA
Tender For bid to ras supply of the manufacture & supply of 1. 0 cusec (102 m / hour) discharge capacity 36 m head submersible pump

CTN :43402074 Due date: 06 Jan, 202606 Jan, 2026 NA
Tender For corrigendum : engineering items ( non authorized dealer)-- , aira valve auto mation ce 1128 valve automation f/b- r/b full bore end type- s/e, size dn 25mm bore seat/stem htfe 98316 bore- 25mm flanged end both side., high flow pump size- 5 inch head- 40 mtr. with motor pump or base freme, s.s. ball valve flange type size- 25mm make- aira, rubber stator for high flow pump size- 4” x 4” model no. rbh4152aabn make- risanshi, rotary screen taflon roller assembly front assembly make- uttam, juice rotary screen, rotary screen taflon roller assembly rear assembly make- uttam, juice rotary screen, rotary screen taflon roller assembly front surface assembly make- uttam, juice rotary screen, ‘b’ mescuite pump spare roter with shaft and gen metel strips pump size- 8 x 8 inch make gita pump, valency welding rod bronzocar- 32 ac/dc size- 3.15mm, valency welding rod bronzocar- 32 ac/dc size- 4.00mm, sapre tyre for following size- f- 60, sapre tyre for following size- f- 70, sapre tyre for following size- f- 80, c.i. pin bush coupling complete assembly with pin bolt with rubber bush size- 10”, c.i. pin bush coupling complete assembly with pin bolt with rubber bush size- 12”, rubber bush for pin bush coupling rubber bush size- id 19 x od 38mm x length- 40mm, en- 8 round bar size- 25mm x 4 mtr., en- 8 round bar size- 30mm x 4 mtr., en- 8 round bar size- 36mm x 4 mtr., en- 8 round bar size- 40mm x 4 mtr., coupling bolt med. en- 8 size bush bolt dia- 19mm bush length bolt- 45mm bolt caller 5mm thick- 2500, thread length- 21mm, 5/8” bsw thread with out thread- 20mm length dia- 5/8 inch, "uc-1500 type uttam make machine continuous machine spare pully housing complete assembly", "uc-1500 type uttam make machine continuous machine spare main housing assembly complete set", "uc-1500 type uttam make machine continuous machine sparebuffer chamber assembly", top scraper for mill no. 3, 4 pitch 35mm material- c.i. 1030 gr. (as per drawing) , "discharge scraper for mill no. 3, 4 pitch 35mm material- c.i. 1030 gr. (as per drawing)", b messacute pump complete 6" x 6" for b messacute without motor make risanshi, top gear transmission make model no. 2340 hbx ratio- 36, s.no. 18026797, top gear transmission make model no. 22300 hbx ratio- 37.85, s.no. 16123824, level tranmitter range - (-2150 to 0 mmh2o) supply - 10.5 to 45vdc, output - 4 to 20ma with installation & trail support warranty - 2 year make - abb/siemens/yokogawa, controller for spray enggineering panel make - winpac model no - wp - 8147 pwr - (10 to 30 vdc) with installation & trail warranty - 02 year, solenoid valve coil with hand regulator make - rotex model - mf42 - 3012x3 - 62g (3/2 way) supply - 230vac, esp level switch probe with controller and cables material - stainless steel no of parts - 4 ports, meadia type - dry material working pressure - 150°c make - eip enviro level control pvt. limited with installation & trail warranty 02 year, mix bad (mb) conductivity sensor cable with its controller work on low cell constant make- ion exchange model - indian con 5000w with installation support warranty 02 year, ph sensor cable with controller make - ion exchange model no - indion 4000 phw with installation & trail supports warranty - 02 year, touch hmi programmed display make - formaplastic model - weintexmt 5017 input power supply 24 vdc warranty - 02 year, power supply transformer make - kasunga model - dvsc 200 aem4it ( ac415/110 . 100v 200va), load cell make - minibea model - cbe1 - 50k warranty 02 year, programmed plc for batch type machine make - mitsubishi electric r5485 & lan card suported model no - fx5u-64m, programmed by formaplastic warranty - 02 year installation service support & trail work, 24 volt dc coil for solenoid valve ip - 65 make - techno as per sample provided, coil for solenoid valve supply - i-230vacol make - rotex as per sample, temprerature controller make - electronic system & devices model - esd9223 warranty - 02 year, plastic chair - ni

CTN :43225477 Due date: 17 Jan, 202617 Jan, 2026 NA
Tender For corrigendum : tender for supply of bearing ball 6205 , gasket , screw , seal ring , link screw , contractor rating 16a/240v , lifting eye , friction pad with screws , solenoid valve coils , cap nut , lock ring , nut , bowl disc , ring height adjusting , block friction complete , shaft for worm wheel with conveyer pulley , washer for feed pump , pump housing , connecting housing , connecting housing , worm wheel , conveyor pulley , sleeve half , feed pump (8540 lph) , seal ring , o ring rub3034-71 dia6.3x38.7mm art64706drg260124 , seal ring (2390) , lifting tool , top disc , gravity disc 108.5 , nave , paring disc device , handle , 0-ring , flexible connection , switch , flexible connection , flow regulation , level switch , solinoid valve , screw buffer , cheese head screw , screw , screw , nut , pan tubular , seal ring , seal ring , o ring , spring , spring , lock washer , ring rubber large for separator bowl , field gasket , end plate ii , washer , buffer , bearing housing , deflector oil , protecting plate , ring wear , packing , pad friction complete for brake shoe , friction pad , bushing , valve cone , short shaft impeller for pump , pump housing , shaft of worm wheel , seal washer , worm wheel shaft , sleeve half coupling , feed and discharge pump , nut , flexible coupling complete , grease silicon (in 25 gram pack) , sleeve , impeller , impeller , impeller , impeller , impeller , bowl body , intermediate service kit (mopx 207) , major service kit (mopx 207) , pump service kit , major service kit (mab 103) , 3 years service kit (mopx 207) , set of tools , overhaul kit for pumping system , circuit breaker , circuit breaker , circuit breaker , plc standard kit , allen key 3 16 , packing , revolution counter , stud bolt , top bearing , ball bearing , seal ring , o ring for bushing , nut round km-5 , o ring rub3034-71dia6.3x124.7artno69270drg260124 , key woodruff , o ring , knob , set screw , seal ring , ball bearing , thermostat with thermowell range , clamping shoe , screw , holding bracket , spring washer , screw , guard , seat , worm , impeller , ring joint rulen gasket , lifting tool , sleeve half , lifting tool for sliding bowl bottom & pin spanner , bowl spindle , 4 relay output , 4 analogue input , 2 analogue input , delay relay , raw plate , field gasket

State Government

CTN :43469556 Due date: 20 Jan, 202620 Jan, 2026 3.42 Crore
Tender For construction of pressurized pipe distribution network lift irrigation scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for pressurized irrigation by rotation in village kapua, block -patharia ,dist. -mungeli in 160 ha. in kharif (right side of khairi anicut as indicated in index map), out of total gross command area 270 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of khairi anicut as indicated in the index map for irrigation system without exceeding total power requirement for solar pumps with solar panel of 100 kwp.it includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , scada work with automation etc. for supply of filtered water for irrigation under pressure. the work also includes construction of chowkidar quarter, pump house, installation of solar power plant and sub station with transformer of required capacity by liasoning with cseb, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work.

State Government

CTN :43469557 Due date: 20 Jan, 202620 Jan, 2026 3.32 Crore
Tender For construction of pressurized pipe distribution network lift irrigation scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 meter residual head at 1 ha for pressurized irrigation by rotation in village palchua & bhadukapa block- mungeli ,dist.- mungeli in 170 ha. in kharif (left side of patharia diversion as indicated in index map), out of total gross command area 300 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (ftl line) of patharia diversion as indicated in the index map for irrigation system without exceeding total power requirement for solar pumps with solar panel of 100 kwp. it includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , scada work with automation etc. for supply of filtered water for irrigation under pressure. the work also includes construction of chowkidar quarter, pump house, installation of solar power plant and sub station with transformer of required capacity by liasoning with cseb, management, operation and maintenance (mom) and defect liability (dl) for the period of 05 years after completion and mom and dl period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by engineer-in-charge as per details given in scope of work.
 Loading, Please wait...

Connect us via What's Up