Web Analytics Made Easy - StatCounter

Switchyard Spares Tenders

Get complete information related to latest Switchyard Spares Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Switchyard Spares Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Switchyard Spares Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

State Government

CTN :40487132 Due date: 03 Jun, 202503 Jun, 2025 NA
Tender For shifting of pole structure 11 kv with 11 kv breakers near institute electric substation

CTN :40477555 Due date: 29 May, 202529 May, 2025 NA
Tender For maintenance of electrical installation and fans, repair maintenance of ht substation, dg set, pump sets, ac units, external services, street lights etc at lab building for ertl (s), akkulam, trivandrum. sh. repairs to 11 kv substation structure.subwork/packages:single

State Government

CTN :40480635 Due date: 18 Jun, 202518 Jun, 2025 71.49 Lacs
Tender For construction of outdoor spread out type fabricated switchyard structure alongwith installation of all equipement laying of cables erection of earth mat, electrical wiring of control room of switching substation at wbidc industrial park, barjora.

State Government

CTN :40443698 Due date: 11 Jun, 202511 Jun, 2025 NA
Tender For enquiry for cleaning, rubbing & painting of 220/132/33kv substation structure at 220kv s/s shivpuri, 220kv s/s pichhore & 132kv s/s bairad under testing division mpptcl shivpuri.

Corporations And Associations And Others

CTN :40352955 Due date: 27 May, 202527 May, 2025 2.65 Lacs
Tender For painting of 132kv and 33kv rusty tower structure, beam and equipment supporting structures at 132kv substation hvpnl jhajjar

CTN :40412114 Due date: 26 May, 202526 May, 2025 NA
Tender For deposit work in the area of edsd-laxminagar under edd-laxminagar, mathura - carriage of 8.5 mtr long pcc pole from 132 kv store center mathura to site of work through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00-70 kms.), carriage of 9/11 mtr long st pole from 132 kv store center mathura to site of work through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00-70 kms.), carriage of 16 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 25 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 63/100 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 250 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 11 kv xlpe cable size 3x70/3x120 sq.mm. cable form store center mathura/agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends., carriage of 11 kv xlpe cable size 3x185/3x300 sq.mm. cable form store center mathura/agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends., carriage of line material i.e. conductor, g.i. wire tpmo stay rod, disc insulator, cross arm, angle channel and other required material from store center at 132 kv substation mathura to the site of work including loading and unloading of material at both ends., erection of single pole structure 8.5 mtrs on pcc pole by digging of pits fitting of all relevant accessories as per respo norms., erection of single pole structure 9/11 mtrs on st pole by digging of pits fitting of all relevant accessories as per respo norms., erection of double pole structure 8.5 mtrs on pcc pole by digging of pits fitting of all relevant accessories as per respo norms., erection of double pole structure 9/11 mtrs on st pole by digging of pits fitting of all relevant accessories as per respo norms., installation of stay set with grouting and nuzzling etc. as per respo drawing along with all routine material to be used for such works., earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour t&p and required material for such work., laying, sagging stringing and binding of acsr weasel conductor on the erected pcc pole/stp including jumpering as per respo manual., laying, sagging stringing and binding of acsr dog conductor on the erected pcc pole/stp including jumpering as per respo manual., laying, sagging stringing and binding of arial bunch conductor on the erected pcc pole/stp including jumpering as per respo manual., laying, sagging stringing and binding of lt pvc cable on the erected pcc pole/stp including jumpering as per respo manual., laying of 11 kv xlpe cable size 3x70/3x120 sq.mm. in the trench/g.i pipe/hdpe pipe and re-dressing of trench after laying of xlpe cable for proper completion of work as per direction of supervising engineer., laying of 11 kv xlpe cable size 3x185/3x300 sq.mm. in the trench/g.i pipe/hdpe pipe and re-dressing of trench after laying of xlpe cable for proper completion of work as per direction of supervising engineer., filing of cable box as suitable size as per direction of supervising engineer., filing of straight through as suitable size as per direction of supervising engineer., chopping of tree branches to clear the route properly., mounting of 16 kva transformer on the double pole/plinth struct

CTN :40412121 Due date: 27 May, 202527 May, 2025 NA
Tender For deposit work in the area of edsd laxminagar under edd-laxminagar, mathura - carriage of 8.5 mtr long pcc pole from 132 kv store center mathura to site of work through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00-70 kms.), carriage of 9/11 mtr long st pole from 132 kv store center mathura to site of work through the kacha and pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, t&p, carrier etc. required for proper completion of work.(distance 00-70 kms.), carriage of 16 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 25 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 63/100 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 250 kva transformer from store centre, mathura to pit site with loading & unloading at both ends, carriage of 11 kv xlpe cable size 3x70/3x120 sq.mm. cable form store center mathura/agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends., carriage of 11 kv xlpe cable size 3x185/3x300 sq.mm. cable form store center mathura/agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends., carriage of line material i.e. conductor, g.i. wire tpmo stay rod, disc insulator, cross arm, angle channel and other required material from store center at 132 kv substation mathura to the site of work including loading and unloading of material at both ends., erection of single pole structure 8.5 mtrs on pcc pole by digging of pits fitting of all relevant accessories as per respo norms., erection of single pole structure 9/11 mtrs on st pole by digging of pits fitting of all relevant accessories as per respo norms., erection of double pole structure 8.5 mtrs on pcc pole by digging of pits fitting of all relevant accessories as per respo norms., erection of double pole structure 9/11 mtrs on st pole by digging of pits fitting of all relevant accessories as per respo norms., installation of stay set with grouting and nuzzling etc. as per respo drawing along with all routine material to be used for such works., earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour t&p and required material for such work., laying, sagging stringing and binding of acsr weasel conductor on the erected pcc pole/stp including jumpering as per respo manual., laying, sagging stringing and binding of acsr dog conductor on the erected pcc pole/stp including jumpering as per respo manual., laying, sagging stringing and binding of arial bunch conductor on the erected pcc pole/stp including jumpering as per respo manual., laying, sagging stringing and binding of lt pvc cable on the erected pcc pole/stp including jumpering as per respo manual., laying of 11 kv xlpe cable size 3x70/3x120 sq.mm. in the trench/g.i pipe/hdpe pipe and re-dressing of trench after laying of xlpe cable for proper completion of work as per direction of supervising engineer., laying of 11 kv xlpe cable size 3x185/3x300 sq.mm. in the trench/g.i pipe/hdpe pipe and re-dressing of trench after laying of xlpe cable for proper completion of work as per direction of supervising engineer., filing of cable box as suitable size as per direction of supervising engineer., filing of straight through as suitable size as per direction of supervising engineer., chopping of tree branches to clear the route properly., mounting of 16 kva transformer on the double pole/plinth struct

Central Government/Public Sector

CTN :40435492 Due date: 03 Jun, 202503 Jun, 2025 3.01 Lacs
Tender For laying of cable from 11kv switch yard to 2x1500kva pmpgh (new) substation with laying gravels in switchyard area, laying of cable for colony substation from nearly 4 pole structure and complete maintenance and overhauling of 07 goab switches of nsch,

State Government

CTN :40085420 Due date: 28 May, 202528 May, 2025 NA
Tender For corrigendum : fabrication,galvanizing,testing,supply and delivery of various 220kv, 132kv and 33 kv equipments supporting structure including g.i nuts, bolts and washes matching with the above structure at alipurduar 220/132/33 kv substation of wbsetcl(2ndcall)

State Government

CTN :40359444 Due date: 20 May, 202520 May, 2025 NA
Tender For cutting of branches of trees and bushes on the high voltage line from kolkewadi dam to alore colony office substation 11 kv line and koyna 1 and 2 11 kv line from pophali 8 pole structure to ghatmatha dp no.-62.
 Loading, Please wait...

Connect us via What's Up