Tender For reconstruction work of the footbridge completely damaged by the disaster at tok chiranibagd of village kanyalikot under sdrf 2025-26. (substructure and superstructure) superstructure span length- 42 mtr .
Tender For tender for supply of designed mast and substructure for bhel e-1400 and e-2000 ac/scr system rigs (s-1 to s-7). ungalvanised ( uncoated) steel wire rope of 60 mm nominal diameter, 6 x 36 classification, construction 6 x 49 sw/ws/sws - iwrc ( strand construction- 16-8+8-8-8-1 ), minimum breaking load ( mbl) 2510 kn ,tensile grade 1960, right regular lay, iwrc wire rope asper api standard 9a. spelter design of 60 mm dia., galvanised as per oil sk. no. oil/3889/a & oil/3890/a.
Tender For corrigendum : i):- replacement of steel girder with psc slab and strengthening of substructure of bridge no. 164 (span 11x6.1m skew) at km 77.239 between kart-ansb stn & bridge no. 210 (span 1x5.26m) at km 105.591 between nldm-mtpr stn on sir-dlpc section of sse/w/rpar under aden/sir. ii):-replacement of steel girder of bridge of br.no. 61-a (2x3.66m) at km 16/13-14 with psc slab between ngwn-nmda on sir-dlpc section under aden/sir.
Tender For reconstruction work (substructure and superstructure) of the footbridge completely damaged by the disaster at tok khaijar in village paisari under sdrf 2025-26 (superstructure span length- 42 mtr) - name of work - reconstruction work (substructure and superstructure) of the footbridge completely damaged by the disaster at tok khaijar in village paisari under sdrf 2025-26 (superstructure span length- 42 mtr).
Tender For reconstruction work (substructure and superstructure) of the footbridge completely damaged by the disaster at tok lamabagad of village kanyalikot under sdrf 2025-26) superstructure span length- 36 mtr . - name of work - reconstruction work (substructure and superstructure) of the footbridge completely damaged by the disaster at tok lamabagad of village kanyalikot under sdrf 2025-26)superstructure span length- 36 mtr
Tender For reconstruction work of the footbridge completely damaged by the disaster at tok dharmuchuad of village paisari under sdrf 2025-26. (substructure and superstructure) superstructure span length- 36 mtr - name of work - reconstruction work of the footbridge completely damaged by the disaster at tok dharmuchuad of village paisari under sdrf 2025-26. (substructure and superstructure) superstructure span length- 36 mtr
Tender For reconstruction work of the footbridge completely damaged by the disaster at tok jagthanabgad of village baisani under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr - name of work - reconstruction work of the footbridge completely damaged by the disaster at tok jagthanabgad of village baisani under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr.
Tender For reconstruction work of the footbridge completely damaged by the disaster at tok manigair, village paisari under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr - name of work - reconstruction work of the footbridge completely damaged by the disaster at tok manigair, village paisari under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr
Tender For bid to ras corrigendum : tender for supply of design and engineering of imcc panel 2 nos and vfds and plc network , design and engineering of apfc and hvac , design and engineering of apfc and field instruments , design and engineering of cables and termination and airconditioning for imcc building , design and engineering of earthing of imcc , field equipments and soil testing , design and engineering of civil buildings and structure foundations , design and engineering of imcc building with earthing system , design and engineering of structural works for cable laying for both incoming and outgoing cables , design and engineering of lighting system of imcc building , equipment locations at ccr ground floor and along the structural path for cable route , design of fire detection and alarm system for building and cable alley area along with integration and display at fire station/existing control centre , supply of imcc panels , vfd panels , supply of apfc panels , hvac system/ air conditioning systems for imcc building and other area air conditioners as mentioned in scope of work , supply of mldb , lighting distribution boards , lighting material including db , light fittings , and all related accessories or wiring material and other electrics etc , supply of field instruments and necessary piping materials as required , supply of plc and other related required accessories , supply of lt cables and other related accessories for electrical , termination material and other instrumentation cables etc and other related electrics as required , supply of cable trays for electrical and instrumentation , supply of all earthing material as per is 3043 for imcc and connection to earth pits for motors , panels etc , supply of fire detection and alarm system for building and cable alley area along with integration and display at fire station/existing control centre , erection , testing , commissioning , and handover of equipments of imcc panels and vfd panels , erection , testing , commissioning , and handover of equipments of apfc panels and hvac system , erection , testing , commissioning , and handover of equipments of lighting system as per above supply , erection , testing , commissioning of earthing system , erection , testing , commissioning of field instruments and necessary piping materials etc as required , erection , testing , commissioning and handover of plc , erection , laying , testing and commissioning of lt cables cable terminations wherever required along with necessary accessories is in the scope of the contractor for electrical and instrumentation , erection , testing and commissioning of cable trays for electrical and instrumentation , erection , testing and commissioning of fire detection and alarm system for building and cable alley area along with integration and display at fire station or existing control centre , substructure excavation , foundation works footings , columns up to plinth level , dpc damp proof course , and backfilling. , superstructure columns , beams , slabs , brickwork or masonry for all floors above plinth level , and formwork up to ground floor , finishes plastering , flooring tiles , marble , painting , wall cladding , and other interior or exterior finishes , plumbing works , fixing of doors up to ground floor. , superstructure columns , beams , slabs , brickwork or masonry for all floors above plinth level , and formwork for subsequent floors as per approved design , finishes plastering , flooring tiles , marble , painting , wall cladding , and other interior or exterior finishes , plumbing works , fixing of doors for subsequent floors as per approved design , supply and erection of structural works for cable laying for both incoming and outgoing cables
Tender For construction of substructure of fire tender bridge, connection of dmrc entry/exit from fob leading to nizamuddin railway station, restoration of land at sarai kale khan and new ashok nagar stations and other miscellaneous enabling works.