Web Analytics Made Easy - StatCounter

Tank Wagon Tenders

Get complete information related to latest Tank Wagon Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Tank Wagon Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Tank Wagon Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :39333822 Due date: 27 Feb, 202527 Feb, 2025 NA
Tender For tank wagon rubber fittings transportation

CTN :39298840 Due date: 21 Feb, 202521 Feb, 2025 NA
Tender For providing of custom bid for services - assistance in providing services for tank wagon loading and unloading operations for total quantity of 36000 wagons as per scope of job boq stc and sla

CTN :39279582 Due date: 20 Feb, 202520 Feb, 2025 1.00 Lacs
Tender For custom bid for services - carrying out t4s audit for bpcl lpg bottling plant jhansi - up-consultancy services is for audit as per pngrb t4s and other codes of practice for the bpcl lpg bottling plant jhansi up . the technical audit as per pngrb regulation & codes will include:- a) visit of audit team to be conducted. b) the scope of technical audit will be done as per the approved checklist of pngrb as per t4s standards and various codes of practice/ safety and includes checking of the documentation, visit of bpcl lpg bottling plant, design, fabrication, installation, layout, testing, tank truck/ tank wagon loading/ unloading, lpg pump and compressor house, storage vessel area, lpg cylinder filling shed, filled shed, evacuation shed, electrical, cathodic protection, instrumentation, fire prevention/ protection system, safety management system, security system and procedure for installation, internal safety audits, ppe c) the overall objective of tpia audit is to examine the compliance with respect to t4s standards and other codes of practice as given in pngrb. d) the tpia shall be approved by pngrb and shall produce the relevant validity certificate of approval from pngrb. e) tpia auditor must be conversant with t4s specification and codes of practice. f) tpia checklist is in three parts, namely; critical activities conformity, general conformity with t4s and general observations g) tpia audit team will specify status/ answer to each serial no. of checklist given. h) in case, there is a non-conformity identified by tpia, entity should specify the mitigation measures including time limit, duly approved by pmc/tpia/technical head of the entity. i) tpia must enclose a separate sheet of non-conformity
 Loading, Please wait...

Connect us via What's Up