Tender For supply & testing of 5 hp 3 phase 415 volt isi marked bee approved 5 star rated submersible motor pump set as per is no 8034/2002 with 3 meters length submersible cable of suitable size, head range 62-170 meter, discharge 167-33 lpm (v4), delivery size 38/40 mm. water lubricated type, maximum outside dia. of motor pump is 100-102 mm, suitable for 150 mm to 300 mm bore dia. complete set should be as per pcee/nr specification no.181-elect./p-store matter/116 dated:-24.09.19.warranty: 30 months from date of supply. inspection authority: consignee. [ warranty period: 30 months after the date of delivery ]
Tender For supply of 24 fiber armoured optic fiber cable asper rdso spec.no. rdso/spn/tc/110/2020and with latest amendment/revision till the date of opening of tender (inspection by rdso) [ warranty period: 30 months after the date of delivery ]
Tender For corrigendum : rectification of pressure build-up problem and ensuring proper functioning up to rated pressure and complete dismantling, inspection, repair, overhauling, replacement of worn-out parts (piston rings, valves, gaskets, filters, oil etc.), servicing, re
Tender For corrigendum : rprc264228 rate contract for expert supervisory services for inspection, health assessment, trouble shooting, maintenance and overhauling of psa feed gas screw compressor
Tender For rprc266229-rate contract for deputation of service engineer for inspection, health assessment, trouble shooting, maintenance and overhauling of recovery plus refrigerant compressor of px unit at prpc
Tender For corrigendum : providing of customized amc/cmc for pre-owned products - rprc267093 deputation of field service engineer for inspection health assessment, trouble shooting maintenance and overhauling of gear box of process air compressor pac train of pta unit at panipat refinery..
Tender For corrigendum : design, engineering, manufacturing, procurement of materials and bought out components, assembly at shop, inspection including inspection by tpia, testing at manufacturers works, packing, supply of metering skid - supply of metering skid including design, engineering, procurement of materials and bought out items/components, drawing approval from client, manufacture, assembly at shop,inspection, packing, transportation at site etc. as per job specification, on fot point of dispatch for indigenous bidders for iocl digboi refinery at, assam, india
Tender For bogie frame assly (machined) for air spring in secondary suspension for lhb coaches to drg no: (a) 66703001, col.i alt.'c' (or) (b*) 834-0-3-002, alt 'b' suppliers commitment will be there to supply as per drawing-(a) (for lhb non ac air spring coaches), or as per drawing -(b)(for lhb-ac air spring coaches) *for identification purpose of bogie frame, (i)drg (a) shall be marked with yellow paint on brake beam end face on both sidesof bogie frames and n227 is to be punched in letter height of 10mm after year or availble space on other location of bogie number plate, (ii)drg (b), a242 is to be punched in letter height of 10mm afteryear or availble space on other location of bogie number plate. the ratio of supply between (a) & (b) has to be confirmed before the issue of purchase order. rate quoted will beapplicable to both drawing-(a) and drawing-(b). special condition : the material specification for plates of various thickness used for fabrication of bogie frame will be as per en10025, part-5, 2005 . grade s355 j2w+n ,in lieu of earlier specified material grade st 52.3 and s355 j2 g3 , en10025/29 in various related sub assembly and component drawings and specn.mdts-213, rev-04 or latest and mdts-166, rev-02 or latest shall be generally followed. time lag between shot blasting and painting should not be more than 30 minutes in any case. packing condition as per document no.mpm0010 e ver-6.0 pi159 & packing condition as per drg.no. icf/j&t/sk-1823. stage inspection to be done as below. (a) raw material stage 1. ensure the raw material used using portable spectrometer machining stage 1. dimensional checks 2. edge preparations (b) welding stage 1. weld parameter to be checked and recorded. (c) surface preparation and painting stage. 1. short/sand blast to the requirements. 2. painting process as per the specification. 3. final product inspection. [ warranty period: 84 months after the date of delivery ]