Tender For supply of thirdpartyinspection of 100 sets of turret electrical equipment kit-b 675- 95- cd3(item lf no: 8000 , thirdpartyinspection of 100 sets of hull electrical equipment kit-a 6795 -82- cb6000 (item lf no: 8 , thirdpartyinspection of 100 sets of power supply system 675-89-cd2 (item lf no: 8000089003) at firm , thirdparty inpsection of 100 sets of gyro drift indicator (gpk-59) 127 ty part no. z-18/51-19-00- 000 , thirdpartyinspection of 100 sets of track assy 675-35-cd9 (item lf no: 80000350 04) at firm premise , thirdpartyinspection of 100 sets of filtering / ventilation unit 675 -71-cd6 (item lf no: 800007119 , thirdpartyinspection of 100 sets of water radiator 765-03-sb178 (item l f no: 8000003403) at firm p , thirdpartyinspection of 100 sets of ejector and air cleaner 675-10-cd2 item lf no: 8000010001) at fi , thirdpartyinspection of 100 sets of compressor plant 765-78-cb6 (item lf no: 8000078408) at firm pr , thirdpartyinspection of 100 sets of bmp smoke generating equipment 675-84- cd2 (item lf no: 8000084 , thirdpartyinspection of 100 sets of hull electrical equipment kit-b 675- 82- cd4 (item lf no: 80000 , thirdpartyinspection of 100 sets of nbc filter fat-200m imga 0001 (item lf n o: 8000299423) at firm , thirdpartyinspection of 100 sets of slip ring box bky-330-2 675-79-cd3 (item lf no: 8000079001) at , thirdpartyinspection of 100 sets of spring 765-33-cd107 (item lf no: 80000334 06) at firm premises , thirdpartyinspection of 100 sets of air pressure control unit 765-78-cd533 (i tem lf no: 8000078434 , thirdpartyinspection of 100 sets of rh manifold 675-10-cd120 (item l f no: 8000010076) at firm prem , thirdpartyinspection of 100 sets of lh manifold 765-10-cd693-01 (ite m lf no: 8000010483) at firm p , thirdpartyinspection of 100 sets of cooler oil vehicular 765-03-sb162 (item l f no: 8000003401) at , thirdpartyinspection of 100 sets of heater 675-71-cd152 (item lf no: 80000710 05) at firm premises , thirdpartyinspection of 100 sets of road wheel with solid rubber tyre 675- 33-c d104 (item lf no: 8 , thirdpartyinspection of 100 sets of machining of support roller (item lf no: 8 000033817) at firm p , thirdpartyinspection of 100 sets of electric motor mh-1 (item lf no: 80000066 80) at firm premises , thirdpartyinspection of 100 sets of filter assembly fluid 765-05-cd291 (item l f no: 8000005823) at , thirdpartyinspection of 100 sets of detent lock 675-10-cd114 (item l f no: 8000010114) at firm prem , thirdpartyinspection of 100 sets of gasoline centrifugal pump 765-05-cd121 (item lf no: 8000005412) , thirdpartyinspection of 100 sets of glow plug 765-06-cd409 (item l f no: 8000006409) at firm premis , thirdpartyinspection of 100 sets of reducing valve 765-06-cd308 (item l f no: 8000006472) at firm p , thirdpartyinspection of 100 sets of forged blank for hub 765-34-41 (item lf no: 7500034205) at firm , thirdpartyinspection of 100 sets of valve 765-84-cd181 (item lf no: 80000844 03) at firm premises a , thirdpartyinspection of 100 sets of injector 765-06-cd248 (item lf no: 80000064 41) at firm premise //bid details 2 / 25
Tender For corrigendum : supply of 3 nos. air cooled package air conditioners of cooling capacity (17.5+/- 1.0) tr each (2 working + 1 standby) for visual inspection room 1,2,3 & 4 in urm-& its erect/ installation ,testing & commissioning of bhilai steel plant.
Tender For corrigendum : appointment of third-partyinspection agency for field activities for city gas distribution project- steely laying - < appointment of third-partyinspection agency for field activities for city gas distribution project for field activities steel laying& associated works >
Tender For corrigendum : appointment of thirdpartyinspection for field activities for city gas distribution project lmc project - < appointment of third-partyinspection agency for field activities for city gas distribution project for field activities lmc/gi laying & associated works >
Tender For lwscz shell kit (a) lscz - one coach set of roof, 2 mm sidewall and end wall for lwscz coaches. 1) sidewall assembly to drg.no. (329) icf/sk3-1-4-091, alt 'b' , col- 1 - 1 no. 2) roof assembly to drg.no. (lwscz) 73916001, alt 'd', col-i - 1 no. 3) end roof assembly to drg.no.(ls) 58116066, alt 'h', col-i - 2 nos. welding pin to drg no 81410012 alt nil to be assembled on roof and sidewall 4) endwall to drg.no. (lslrd) 74115001, alt 'j'-2 nos. the firm shall fulfil the requirement as per icf//md/specn.200, issue status 01, rev 04 with amendment no. 01. the firm shall fulfil the requirement as per icf/md/spec-315, issue status-01, rev.00, amendment no. 01. firm has to supply roof and sidewall without applying etch primer. (b)one coach set of body shell items and partition frames for lwscz2(814) coaches to drg nos, 1. 81410002, alt nil- 1no. 2. 81410005, alt 'e'- 1 no. 3. 58210036, alt 'b'- 2 nos. 4. 67010011, alt 'a'- 2 nos. 5. 58110017, alt 'c'- 2 nos. 6. aag10457, alt nil- 4 nos. 7. aab10338, alt nil-16 nos. 8. 58110015, alt 'a'- 6 nos. 9. 58110016, alt 'a'-3 nos. (c) under frame arrangemnt to drg no. 81411001 alt 'f' the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special condition : a) -packing as per icf/j&t/misc-2201, alt 'e', safety instruction as per icf/j&t/sk-1867, alt. 'nil' -packing as per icf/j&t/sk-1809, alt 'a'. b) - packing condition as per icf/j&t/sk-1865, alt "a". c) packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up and side bearer side down. stage inspection details. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly& welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor withcross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : shell kit for memu dmc2 jk 946 a. roof assembly 94416001 000 01, alt 'nil' - 1 no. location of sidewall 94414001 000 01, alt 'nil' - 1 no. end construction pail end 94615001 000 01, alt 'nil' - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue status 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per icf/md/specn-315, issue status 01, rev.0 0with amendment no 01. b.supply of one coach set of body shell items and partition frames for memu dmc2 jk 946 to drawing nos: 1. 94410003 000 01, alt 'a' - 1 no 2. 74510257 000 01, alt 'nil' - 1 no 3. 94410004 000 01, alt 'nil' - 1 no 4. 74510045 000 01, alt 'nil' - 1 no 5. 94410005 000 01, alt 'nil' - 1 no 6. 94410002 000 01, alt 'b' - 1 no. 7. 94410076 000 01, alt 'nil' - 1 no 8. 94410072 000 01, alt 'nil' - 1 no 9. 94410054 000 01, alt 'nil' - 2 nos. c. under frame arrangement 94411001 000 01, alt 'a' - 1no. firm shall fulfill the manufacturing facility as per icf/md/specn-147, issue status 01 rev.02 with amendment no.02. special condition : packing as per icf/j&t/misc-2201, alt 'e'. packing as per icf/j&t/sk-1809, alt 'a'. packing condition as per drg.no.icf/j&t/misc-2487, alt 'b' the underframe should be supplied as normal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt 'a'. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding wherever necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final product inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item ]
Tender For corrigendum : providing of hiring of third-partyinspection agency - deputation of elecon expertise person for supervision of stacker bucket wheel gearbox overhauling work; deputation of elecon expertise person for supervision of stacker bucket wheel gearbox overhauling work..
Tender For corrigendum : providing of hiring of third-partyinspection agency - power generation & supply; survey inspection and reporting of upgradation for lt part(ac/dc) protection system of 1 mwp solar power plant; government test agency, nabcb, registered