Get complete information related to latest Through Rail Renewal Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Through Rail Renewal Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Through Rail Renewal Tenders.
Tender For aden/tirunelveli sub division:- permanent way works at sse/pway/ ten,svv & tn sectionsw-i :- throughrailrenewal (secondary) for a length of 8.500 km at various station yards in tn p.way section.sw-ii :- upgradation of major yard improvements work inconnection with throughrailrenewal (secondary) & sej renewal at ten station yard.sw-iii:- renewal of sej in svv p.way section sw-iv:- conversion of swp into lwr on loop lines & other lines in tn & ten p.way section.sw-v:- tfr (p) on plain track at various station yards for a length of 31.154 km in tn,svv & ten p.way section.sw-vi:- complete track renewal (primary) by manual for a length of 1.100 km including deep screening in road no.1 at kovilpatti station yard.sw-vii mej-ten (dn line) section:-through sleeper renewal (primary) by manual between km:- 12.252 to 13.861 for a length of 1.609 kms in beween stations vanchi maniyachchi and gangaikondan in sse/p.way/ten section.sw-viii ttr (fs+tws+wcmsc) and trr (p) on approaches of p & c 2 sets in ten station yard
Tender For inviting tender (nit) for award of work for shifting of 33kv & 11kv lt cables network, infringing on redevelopment of new delhi railway station and construction of associated infrastructure project by rail land development authority (rlda) (scheme no. ec26sh1005)
Tender For name of work: - dmm-gy & dmm-pak sections: sw-i: throughrailrenewal (primary)- trr(p)- for a length of 192.248 kms. sw-i: through sleeper renewal (primary)- tsr(p) - for a length of 9.406 kms under den/west/gtl jurisdiction (locations as per annexure)
Tender For subaqueous reconstruction and high precision geometric alignment of primary left guide rail assemblies main penstock gate no.1 intake infrastructure at ukai dam ta,songadh dist.tapi and subaqueous precision demolition and geometric restoration of secondary embedment concrete intake gate no.1 right side guide slot infrastructure at ukai dam ta.songadh dist.tapi
Tender For corrigendum : (i) throughrailrenewal (trr) for 28.610 tkm in rksn-pdph, nomd-bjmd & bjmd-gx section, (ii) complete track renewal (primary) {ctr(p)} for 1.35 tkm & through turnout renewal {ttr (fs+cs+cmsc)} for 9 sets in connection with improvement of dps yard under the jurisdiction of sr. den (south)/ckp.
Tender For earthwork & blanketing in embankment /cutting in formation of bg line including bridge approaches etc., construction of bridge work (major/minor, sub structure, jacketing of existing bridges and super structure) as per railway's approved design and drawing, construction of retaining/toe wall/diversion drain, laying and linking / throughrailrenewal of bg track for main line, loop lines and points & crossing etc. in section/ yards, transportation of p.way materials, welding of rails, and other incidental miscellaneous works etc. in connection with connectivity of dead ends of indb and lmnr stations.
Tender For corrigendum : execution of various track works viz tbr - 22.092 tkm, tsr(p) - 19.026 tkm & throughrailrenewal (primary) - 11.397 tkm. under the jurisdiction of sse/p.way/bia of raipur division.
Tender For "sw.(i):-aden/central sub division:-sse/pway/bg & mg / mdu section:-renewal of existing conventional sej with improved sej (52kg),throughrailrenewal(secondary),deepscreening by bcm/ manual over plain track and points and crossing in madurai station yard.sw.(ii):-deep screening by bcm / manual over loop lines and points & crossings of various station yards in sse/pway/bg/mdu,mg/mdu & mnm section jurisdiction.sw.(iii):- madurai junction:- dismantling of existing cement concrete apron & ctr(p) with 60 kg rails and psc-60 kg sleepers on road no.1 and 2 in sse/pway/bg/mdu section."
Tender For throughrailrenewal for ballastless track at metro railway kolkata in up & dn line from knap (ex) km (-)0.9 to kkvs (in) km 25.33 with 60 kg new rail including allied works of metro railway, kolkata.