Get complete information related to latest Thrust Block Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Thrust Block Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Thrust Block Tenders.
Tender For augmentation of lis jukhala, ashamajari etc. in tehsil sadar district bilaspur (sh. laying jointing and testing of gi pipe 150mmdia (pe) gravity line from mdt ashamajari to village upper jukhala and construction of thrustblock and outlet).
Tender For replacement of hdpe pipe by dismantled gi pipe 150 mm dia in syphon partion, repair of hydrant providing fixing ci sluice valve and providing pvc flanges across main spectral distribution line and co thrustblock for longitudinally ruptured line
Tender For design, supply, installation,testing and commissioning of lift irrigation system(head works consisting of construction of intake canal, jack well,pump house, control room,power supply including terminal bays sub station, transmission lines, rising main, gravity main distribution main, delivery chamber, thrustblock, surge tank,service road,approach road,railway crossing, national highway crossing, cross drainage works, road bridges office buildings,etc) for feeding iidentified tanks in channagiri taluk of davanagere district by lifting water from right bank of tunga bhadra river near anveri village including operation and maintenance for a period of 5 years after successful completion of work channagiri tank filling scheme phase -i, on turn- key basis.
Tender For construction of raising main pipe (design, supply testing and commissioning) including allied works such as anchor blocks, thrustblocks, structures for crossings, necessary valves, surge protection works, and delivery chamber for providing irrigation facility to suffering atchkat of glbc command from km 52.00 to km 63.00 in rabakavi-banahatti taluk, bagalkot district by lifting water from krishna river near halingali village including operation and maintenance for a period of 5 years after successful completion of work for sasalatti shivalingeshwara lift irrigation scheme2, phase2 on turn-key basis