Web Analytics Made Easy - StatCounter

Torque Converter Tenders

Get complete information related to latest Torque Converter Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Torque Converter Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Torque Converter Tenders .

Filter
Loading....
Loading....
Loading....
Loading....
Loading....

Bid Submission Date Range
Tender Value

CTN :43544216 Due date: 27 Jan, 202627 Jan, 2026 NA
Tender For supply of dc link voltage sensor for traction converter as per lem type no. cv4-4000/sp-1 and id no. 3ehn 424337 p0001 for wag9 loco.

Central Government / Public Sector

CTN :43544867 Due date: 23 Jan, 202623 Jan, 2026 NA
Tender For supply, erection, commissioning and testing of igbt based 3-phase drivepropulsion equipment with physical medium i.e. esd/emd/ofg for multi-functional vehicle bus (mvb) as per iec 61375, terminal bracket, bus bar link and cu braid required for connection between main transformer and traction converter, auxiliary converter, interfacing connectors, cables and cable loom required for connection from vcu 1/2 to sb1/2 panel. as per specification no. i)rdso/2008/el/spec/0071, rev.5 for igbt based 3-phase drive propulsion equipment, ii) clw/es/3/0458 alt.e or latest for control cables iii) clw/es/3/0459 alt.c or latest for screenedcable iv) clw/es/3/0124 alt.o or latest. the detailed scope for erection isenclosed at annexure-a. note: -the scope shall also include the removal of allexisting gto-based equipment, viz. burs, srs, and vcus etc., directly related to the provision of the igbt-based 3-phase drive propulsion system withphysical medium, as required for the integration of the new equipment. thedetailed scope for erection is enclosed at annexure-a. associated equipmentremoved during the replacement from gto to igbt shall be refitted (as per thesite engineer's guidelines), as necessary, to ensure proper functioning of the igbtpropulsion system. the firm shall ensure that, upon completion, the propulsionsystem is fully functional in all respects. all works and accessories necessary toachieve this objective, whether explicitly mentioned herein or not, shall be deemedto be included in the scope.(documents attached)

Central Government/Public Sector

CTN :43520837 Due date: 19 Jan, 202619 Jan, 2026 NA
Tender For providing of customized amc/cmc for pre-owned products - replacement of engine transmission torque converter and lhs rhs steering clutch of bd355 dozer and d11t dozer for 2 years as and when required working at jagannath ocp; beml bd355 and cat d11t; annual maint..

Central Government / Public Sector

CTN :43406620 Due date: 23 Jan, 202623 Jan, 2026 NA
Tender For corrigendum : supply, erection, commissioning and testing of igbt based 3-phase drivepropulsion equipment with physical medium i.e. esd/emd/ofg for multi-functional vehicle bus (mvb) as per iec 61375, terminal bracket, bus bar link and cu braid required for connection between main transformer and traction converter, auxiliary converter, interfacing connectors, cables and cable loom required for connection from vcu 1/2 to sb1/2 panel. as per specification no. i)rdso/2008/el/spec/0071, rev.5 for igbt based 3-phase drive propulsion equipment, ii) clw/es/3/0458 alt.e or latest for control cables iii) clw/es/3/0459 alt.c or latest for screenedcable iv) clw/es/3/0124 alt.o or latest. the detailed scope for erection isenclosed at annexure-a. note: -the scope shall also include the removal of allexisting gto-based equipment, viz. burs, srs, and vcus etc., directly related to the provision of the igbt-based 3-phase drive propulsion system withphysical medium, as required for the integration of the new equipment. thedetailed scope for erection is enclosed at annexure-a. associated equipmentremoved during the replacement from gto to igbt shall be refitted (as per thesite engineer's guidelines), as necessary, to ensure proper functioning of the igbtpropulsion system. the firm shall ensure that, upon completion, the propulsionsystem is fully functional in all respects. all works and accessories necessary toachieve this objective, whether explicitly mentioned herein or not, shall be deemedto be included in the scope.(documents attached)

Central Government/Public Sector

CTN :43540938 Due date: 30 Jan, 202630 Jan, 2026 1.94 Crore
Tender For offloading of different repair , maintenance work and daily general checking and rectification work, demounting and mounting of engine, transmission and torque converter assembly of 42 nos. cat 789d 190t dumpers for a period of 730 days (2 years) at

CTN :43306597 Due date: 16 Jan, 202616 Jan, 2026 NA
Tender For corrigendum : supply of master cylinder seal kit , fuel pump assembly , starter motor , alligator conveyor belt fasteners , fuel filter , water separator , plate type oil cooler , motor 11. 9in3 , diaphragm-required for torque converter repair

Central Government/Public Sector

CTN :43499805 Due date: 30 Jan, 202630 Jan, 2026 NA
Tender For comprehensive annual maintenance contract of m/s abb make igbt based traction converters, auxiliary converter & vehicle control unit of 3-phase locomotives at els/ajni & els/bsl for 3 years.

Central Government/Public Sector

CTN :43477459 Due date: 06 Feb, 202606 Feb, 2026 NA
Tender For supply and testing of torque converter with output 2900 lb/ft or above, output ratio 1:16 drive input 1/2 inch & output 1 inch square drive, light weight, with awur (anti wind-up ratchet) safety and precision feature. make - gedore germany, sweety, stainly, force, taparia, everest or equivalent reputed make/brand.

Central Government / Public Sector

CTN :43042189 Due date: 16 Jan, 202616 Jan, 2026 NA
Tender For corrigendum : supply, erection, commissioning and testing of igbt based 3-phase drivepropulsion equipment with physical medium i.e. esd/emd/ofg for multi-functional vehicle bus (mvb) as per iec 61375, terminal bracket, bus bar link and cu braid required for connection between main transformer and traction converter, auxiliary converter, interfacing connectors, cables and cable loom required for connection from vcu 1/2 to sb1/2 panel. as per specification no. i)rdso/2008/el/spec/0071, rev.5 for igbt based 3-phase drive propulsion equipment, ii) clw/es/3/0458 alt.e or latest for control cables iii) clw/es/3/0459 alt.c or latest for screenedcable iv) clw/es/3/0124 alt.o or latest. the detailed scope for erection isenclosed at annexure-a. note: -the scope shall also include the removal of allexisting gto-based equipment, viz. burs, srs, and vcus etc., directly related to the provision of the igbt-based 3-phase drive propulsion system withphysical medium, as required for the integration of the new equipment. thedetailed scope for erection is enclosed at annexure-a. associated equipmentremoved during the replacement from gto to igbt shall be refitted (as per thesite engineer's guidelines), as necessary, to ensure proper functioning of the igbtpropulsion system. the firm shall ensure that, upon completion, the propulsionsystem is fully functional in all respects. all works and accessories necessary toachieve this objective, whether explicitly mentioned herein or not, shall be deemedto be included in the scope.(documents attached)

CTN :43404950 Due date: 23 Feb, 202623 Feb, 2026 NA
Tender For supply of dc link voltage sensor for traction converter
 Loading, Please wait...

Connect us via What's Up